Abstract

One of the challenges of the Spanish Transmission System Operator (TSO) is the decarbonisation of the Balearic Archipelago, by means of the integration of Renewable Energy Sources (RES) in the islands, as well as increasing the transmission capacity between the Iberian Peninsula and the Balearic Islands. Since the Balearic Archipelago is an island power system, the decarbonisation brings challenges related to power system stability and operation. A new High Voltage Direct Current (HVDC) interconnection between the Iberian Peninsula power system and the Balearic Islands power system is planned to facilitate the decarbonisation of the Balearic Archipelago (PEN-BAL2 Project). The HVDC link will be based on Voltage Source Converter (VSC) technology and will consist of a bipole of 2x200 MW, a DC voltage of +-250 kVdc and +100/-150 Mvar of reactive power capacity for each converter station. One converter station will be connected to a future El Fadrell 400 kV substation (Castellón, Valencia, Iberian Peninsula), while the other converter station will be connected to the existing San Martín 220 kV substation (Mallorca Island, Balearic Islands). The link will have HVDC submarine cables of 363 km (approx.).This paper will describe the challenges for energy transition in the Balearic Archipelago, technology enablers in general and PENBAL2 VSC-HVDC interconnection.

Closest papers

Nearest neighbours by meaning across the whole index.

Development of an EMT model of the Balearic power system

eess.SY ·2026-09-02 ·Yousef Pipelzadeh, Dharshana Muthumuni, Farid Mosallat, Javier Renedo, Silvia Sanz Verdugo +3 more
similarity 0.62
Abstract

The Balearic Islands are striving to achieve 100% renewable energy, which poses new challenges in operating the power system securely and reliably. With a higher integration of inverter-based resources (IBRs) and a reduced presence of conventional synchronous generators, the system strength, particularly short circuit levels, becomes weaker and more susceptible to disturbances; and the total inertia of the system becomes lower. Technology enablers are planned to achieve energy transition in the Balearic power system: a new 2x200 MW VSC-HVDC link (bipole with metallic return), Synchronous Compensators (SC) and Battery Energy Storage Systems (BESS), as fully-integrated network components. Detailed ElectroMagnetic Transient (EMT) simulation studies may be needed to analyse stability of the system, due to the high amounts of power-electronics devices in the system. This paper describes the implementation of an EMT model of the Balearic power system.

0.22

Tests on the POD-P controller of INELFE Spain-France VSC-HVDC interconnector

eess.SY ·2026-09-02 ·Javier Renedo, Agustín Diaz-García, Gilles Torresan, Eduardo Lorenzo Cabrera, Antonio Cordón +9 more
unusual similarity 0.61
Abstract

INELFE interconnector consists of a 2x1000 MW high voltage direct current system based on voltage source converters (VSC-HVDC) interconnecting France and Spain. INELFE VSC-HVDC link is embedded into the high voltage alternating current (HVAC) system. Electromechanical oscillations, also known as power oscillations, are a major concern worldwide. INELFE VSC-HVDC link has specific controllers to damp power oscillations by modulating active (P)- and reactive (Q)-power injections of the VSC converters (POD-P and POD-Q controllers, respectively). The Spanish and French Transmission System Operators (TSOs) carried out a join task force to - Increase the gain of POD-P controller of INELFE VSC-HVDC link. - Make it possible to use the POD-P controller together with angle difference control (ADC) of INELFE VSC-HVDC interconnector. The objective of these modifications is to improve the effectiveness of POD-P controller and, therefore, to increase its contribution to the damping of inter-area oscillations in the Continental Europe (CE) power system. Such changes require (a) extensive simulation studies and (b) extensive tests in different operation modes, in order to ensure the correct behavior of the system. This paper presents simulation studies and field tests on the POD-P controller of INELFE VSC-HVDC interconnector in different modes of operation.

0.62

Assessment of the N-1 voltage security of a future Nordic energy system

eess.SY ·2026-09-21 ·Luis Kuhrmann, Peiyuan Chen, Lisa Göransson, Filip Johnsson
similarity 0.51
Abstract · 17 pages, 13 figures. Submitted to the International Journal of Electrical Power and Energy Systems

Capacity Expansion - Energy System Models (CE-ESMs) have been widely used to optimize the decarbonization of future energy systems on national and continental scales. To capture the limitations in electricity trade between different parts of the system investigated, CE-ESMs often include a representation of the transmission grid. However, CE-ESMs usually only include linearized representations of the grid and omit or strongly simplify grid stability requirements. In this work, we evaluate the N-1 voltage security of the electricity system results obtained from a CE-ESM of a decarbonized Nordic energy system in Year 2050, and analyze the effects of different grid code requirements and shunt capacitor and reactor automation on voltage security. For comparison, we evaluate a Year 2022 system based on ENTSO-E data.We show that the CE-ESM results for the Nordic countries are not N-1 voltage-secure and that, depending on the grid code and shunt automation requirements, the contingencies with voltage violations range from 1.1% to 17.4%. Furthermore, the results indicate that both Power Park Module voltage control and shunt extreme voltage automation have strong positive effects on voltage security in the modeled future system. Grid regions with low levels generation, and thus little dynamic reactive power from generators, are found to be the most at risk of being voltage-insecure.

0.29

Protection challenges and solutions on power systems towards 100% inverter-based resources and energy storage systems

eess.SY ·2026-11-02 ·Alexander Novikov, Luis A. Garcia-Reyes, Anup Joshi, Ahmar Farooque, Junaid Khalid +1 more
published similarity 0.48
Abstract · Danmarks Tekniske Universitetet, Katholieke Universiteit Leuven, Department of Electrical Engineering, Electrical Energy Computer Architectu…

The decarbonization of the energy sector, driven by the Paris Agreement and the European Green Deal, is increasing the share of renewable energy sources (RES) in power systems. Unlike traditional systems, RES-based systems rely on power electronic converters, which creates unprecedented challenges for reliability and resilience. The future power system is expected to combine a low-level AC layer with an upper-level High Voltage Direct Current (HVDC) backbone, which requires new understanding of fault protection, stability, and interaction between AC and DC components, as well as new models and simulation tools. This is especially critical in systems moving towards 100 percent converter-based generation. Protection systems detect, locate, and isolate faults to protect assets while the rest of the system keeps operating. Traditionally, they rely on the large fault currents supplied by synchronous machines. In modern systems, converter controls limit the fault current contribution to about 120 percent of rated current, so relays that distinguish faults from normal overcurrents based on current level may operate incorrectly. In addition, inverter-based resources (IBR) may not inject enough negative and zero sequence current for directional relays to work properly, and converters hold the voltage at a fixed value only within their reach, beyond which it drops quickly. As a result, existing protection schemes may not provide the expected accuracy and reliability. This report reviews the protection challenges identified in recent academic literature for power systems with high shares of converter-based resources. It covers the specific characteristics of RES, the challenges for protection with intelligent electronic devices (IED), the challenges of converter control during faults, and the main solutions proposed in research over the last decade.

0.49

On the Optimal Co-location of Data Centers with Renewable Energy Sources in SIDS

eess.SY math.OC ·2026-09-16 ·Shankar Ramharack, Patrick Hosein, Rajiv Sahadeo
top venue similarity 0.48
Abstract · 6 pages, 4 figures, accepted to 2026 IEEE Caribbean Conference (CaribCon) - Track 3 - Smart Systems, Robotics, and Automation

The rapid expansion of data centers presents both economic opportunities and systemic risks for Caribbean Small Island Developing States~(SIDS). This paper develops a PyPSA-based capacity expansion framework for optimal co-location of data centers with renewable energy infrastructure, incorporating behind-the-meter battery storage, workload flexibility (70\%/30\% inflexible/flexible split), and multi-bus transmission topology. Two case studies are examined: Trinidad~\&~Tobago (single-bus, 92\,MW Brechin Castle solar, 5\,MW data center) and Jamaica (4-bus 138\,kV JPS network, 15\,MW data center at Kingston). Jamaica's optimum deploys 405\,MW solar, 278\,MW wind, 800\,MWh grid-scale BESS, and 84\,MWh behind-the-meter BESS, achieving 42.5\% renewable penetration; Trinidad's gas-anchored optimum builds no new RE, and a sensitivity analysis shows solar entering at gas costs above \$65--70/MWh, a carbon price of \$25--50/tCO$_2$, or solar CAPEX of \$800/kW. A post-hoc distributionally robust stress test evaluates hurricane resilience, and a novel 10-factor siting framework addresses the regulatory gap in SIDS that lack data-center-specific zoning. Results show that energy-optimal locations may score poorly on societal criteria---noise, freshwater stress, zoning readiness. This demonstrates the need for integrated planning tools in small island contexts.

0.33

Solid State Transformer - Next Generation MV Interface for Native DC loads

eess.SY ·2026-10-23 ·Steffan Hansen, Marco Liserre, Mohamed Moharram
similarity 0.47
Abstract · 8 pages, 5 figures

About PowerNexa PowerNexa is the project name for a start- up initiative driven by Marco Liserre and Steffan Hansen with the ambition to develop the next generation power grid interface. Battery integration and DC loads Ongoing electrification is fundamentally changing how electrical energy is produced and consumed. DC loads are becoming an integral part of the infrastructure while battery integration is increasingly needed to manage peak demand and address grid capacity constraints. The next generation grid interface PowerNexa aims to combine a fully controllable Medium Voltage grid interface with native battery integration and multiple DC voltage levels, based on an architecture designed for high efficiency, modularity and redundancy.

0.27

Report on Stability Analysis of Islanded Power Systems with Grid-Forming Converters

eess.SY ·2026-10-30 ·Anup Joshi, Luis A. Garcia-Reyes, Qingyuan Gong, Xavier Guillaud, Javier Renedo +1 more
published similarity 0.47
Abstract · Danmarks Tekniske Universitetet, Katholieke Universiteit Leuven, Department of Electrical Engineering, Electrical Energy Computer Architectu…

Islanded power systems are inherently challenging to operate due to limited interconnection, low inertia, and weak short-circuit strength. As renewable and inverter-based resources replace synchronous machines, these challenges worsen, causing faster frequency deviations, greater voltage volatility, and higher risk of instability. This report summarizes the differences between islanded and interconnected systems and reviews key stability issues in islanded grids: frequency stability, converter-driven interactions, voltage stability, large-disturbance behavior, and small-signal dynamics. Grid-forming (GFM) voltage source converters are a promising solution because they can establish voltage and frequency, emulate synchronous machine behavior, and provide grid strength, virtual inertia, fast frequency response, voltage regulation, and black-start capability. The report examines relevant GFM control strategies and evaluates their capabilities in weak, low-inertia islanded grids. Challenges remain, particularly interoperability, control coordination among multiple inverter-based resources, lack of standardized grid code requirements, and coordination of protection devices. Successful deployment requires advances in interoperability, harmonized grid codes, and grid planning that considers the unique features of islanded systems, along with clear GFM functionality requirements. Finally, a case study illustrates the stability-enhancing capability of GFM converters in weak grids through small-signal stability analysis. Overall, GFM technology is a key enabler of reliable, renewable-dominant island power systems, but broader adoption depends on continued technical and regulatory development.

0.36

Grid-forming Control of Offshore Wind through a Diode-Rectifier HVDC System: a 2 GW Case Study

eess.SY ·2026-11-08 ·Ishi Nigam, Saif Alsarayreh, Tuanku Badzlin Hashfi, Miloš Cvetković, Joris van Doorn +1 more
similarity 0.44
Abstract

Diode-rectifier-unit (DRU)-based high-voltage direct current (HVDC) transmission considerably reduces the volume and weight of the offshore converter platform for remote wind farms and, hence, its cost, but shifts the task of forming and regulating the offshore AC network to the wind-turbine converters. This paper examines which grid-forming control strategy is the most suitable for DRU power transfer. The DRU commutation relationship shows that the delivered active power depends on the offshore voltage magnitude (but not on the converter voltage angle), so the angle-based active-power loop of virtual synchronous machine control is not closed through the rectifier. A $P-V/Q-ω$ grid-forming architecture, which regulates active power via the voltage magnitude and derives frequency from the reactive power error, is therefore adopted. Electromagnetic transient simulations of a 1GWaggregated grid-forming turbine on a 66 kV collector network with a $\pm$525 kV bipolar DRU link show that the commanded power is delivered over 800 to 1000MW with the offshore voltage held near nominal. The paper also examines how grid-forming operation changes the allocation of control duties within the Type-4 turbine: once the grid-side converter forms the network, DC link regulation must move to the machine-side converter, which limits the achievable bandwidth of the DC-link control. Extending the system to 2 GW with two 500 MW grid-following units achieves full power transfer in simulation, but with the grid-forming converter loaded beyond its continuous rating and a steady-state offshore frequency deviation of approximately 1.8 Hz.

0.34