CS Paper Radar

Assessment of the N-1 voltage security of a future Nordic energy system

Luis Kuhrmann, Peiyuan Chen, Lisa Göransson, Filip Johnsson

eess.SY ·submitted 2026-09-21 09:46 UTC · v1

Abstract

Capacity Expansion - Energy System Models (CE-ESMs) have been widely used to optimize the decarbonization of future energy systems on national and continental scales. To capture the limitations in electricity trade between different parts of the system investigated, CE-ESMs often include a representation of the transmission grid. However, CE-ESMs usually only include linearized representations of the grid and omit or strongly simplify grid stability requirements. In this work, we evaluate the N-1 voltage security of the electricity system results obtained from a CE-ESM of a decarbonized Nordic energy system in Year 2050, and analyze the effects of different grid code requirements and shunt capacitor and reactor automation on voltage security. For comparison, we evaluate a Year 2022 system based on ENTSO-E data.We show that the CE-ESM results for the Nordic countries are not N-1 voltage-secure and that, depending on the grid code and shunt automation requirements, the contingencies with voltage violations range from 1.1% to 17.4%. Furthermore, the results indicate that both Power Park Module voltage control and shunt extreme voltage automation have strong positive effects on voltage security in the modeled future system. Grid regions with low levels generation, and thus little dynamic reactive power from generators, are found to be the most at risk of being voltage-insecure.

Comment
17 pages, 13 figures. Submitted to the International Journal of Electrical Power and Energy Systems

Closest papers

Nearest neighbours by meaning across the whole index.

EPIGRIDS: Documentation and Validation of Seven Open Synthetic Transmission Grid Cases

eess.SY math.OC ·2026-11-13 ·Jonathan M. Snodgrass, Scott Greene, Thomas J. Overbye, Christopher L. DeMarco, Bernard C. Lesieutre
benchmark similarity 0.54
Abstract · 10 pages, 2 figures, 6 tables. Submitted to the IEEE Open Access Journal of Power and Energy. Cases: https://doi.org/10.5281/zenodo.23814538…

This paper documents and checks EPIGRIDS, seven open synthetic transmission grid cases from four independently built networks, made with an optimization-based construction method instead of the graph-statistics method behind most large public synthetic grids. The cases range from 250 to 78,484 buses, with geolocated substations, voltages up to 765 kV, and line parameters taken from conductor data. Each ships under an open license in three common power flow formats that agree at the solved operating point, and the six larger cases have a companion hourly, bus-level load series for one year. The Texas, Florida, and Michigan, Ohio, and Indiana cases are sub-networks of the Eastern case. Every case solves an alternating-current power flow from its stored operating point. With parallel circuits merged, the Eastern and Western cases are 9 and 16% denser than the real interconnections, while graph-statistics cases on the same footprints lie within 6% and meet more published realism criteria. A full single-outage contingency analysis completes on every case, and in an optimal power flow benchmark every case except the New England base case and one of its 12 operating points solves in polar form.

0.31

GridForge: A Tractable Network-Flow Method for Constructing Open, Continental-Scale Synthetic Power Grids

eess.SY ·2026-11-12 ·Jonathan M. Snodgrass, Thomas J. Overbye, Christopher L. DeMarco, Bernard C. Lesieutre
similarity 0.53
Abstract · 30 pages, 10 figures, 7 tables; supplementary material as an ancillary file. Submitted to the International Journal of Electrical Power & En…

The goal of this paper is to construct open, continental-scale synthetic transmission grids with an optimization method that stays tractable. Security restrictions keep models of the real grid out of open research and machine-learning datasets, and optimization-based construction is hard at scale: the number of candidate lines grows combinatorially, so electrically faithful methods prune the candidates in advance. This paper presents GridForge, which keeps every bus pair within physical length limits as a candidate, selects lines with Garver's length-weighted network-flow linear program instead of binary decisions, and resizes them with a sequential direct-current (DC) power flow. Two stages of 13 regional networks are evaluated. Their node-degree distributions are nearly as strongly log-linear as those of the real Eastern and Western Interconnections ($R^2$ of 0.92 to 0.98 against 0.971 and 0.981), although the areas under the fitted lines differ from the real ones by 39.9% on average. On the upper Midwest and Tennessee Valley footprints, resizing lowers the DC power-flow loss from 5.89% to 4.14% and from 14.55% to 7.05%, and the DC optimal power-flow loss from 4.03% to 2.02% and from 5.54% to 2.47%. Without relaxing any line limit, the DC optimal power flow is feasible in 78.81% and 0.82% of the scenarios. Most lines are built at 69 kV. The models span 250 to 78,484 buses, were built on single machines, and are freely redistributable.

0.62

Modelling the Nordic power system expansion with PyPSA-Eur: a comparison with the Nordic Grid Development Perspective 2025

eess.SY ·2026-10-09 ·Leonardo Rydin Gorjão, Heidi S. Nygård
published similarity 0.53
Abstract · Conference proceedings, 4 figures, 6 pages

We compare the Nordic Grid Development Perspective 2025 (NGDP) with a least-cost transition pathway for the Nordic power system obtained with PyPSA-Eur for the period 2025-2050 under a net-zero CO$_2$ constraint. The model co-optimises generation, storage, and transmission expansion with hourly system operation while constraining the Nordic generation mix to remain consistent with NGDP milestone ranges. Overall, the optimised capacity pathways reproduce the broad NGDP expansion of wind and solar power, with Denmark emerging as the main locus of offshore wind and solar deployment, Finland as a major site for onshore wind expansion, and Norway and Sweden relying more strongly on existing hydropower and nuclear capacity. The main discrepancy between the two pathways does not lie in the broad build-out of variable renewables, but in the timing and role of hydrogen. Whereas the NGDP treats hydrogen as an early and steadily increasing component of industrial demand and system development already from 2030, PyPSA-Eur delays substantial hydrogen deployment until 2045-2050, when it becomes cost-effective primarily as a flexibility and seasonal storage option in a strongly variable-renewable-energy-dominated system. This contrast suggests that early hydrogen build-out in the Nordics is not a robust outcome of cost optimisation alone, but depends strongly on assumptions regarding industrial demand growth, sector coupling, and anticipatory infrastructure planning. We therefore argue that hydrogen remains the principal strategic uncertainty in the Nordic transition, with the NGDP representing a more anticipatory planning perspective and PyPSA-Eur a more conservative least-cost timing of deployment.

0.37

Protection challenges and solutions on power systems towards 100% inverter-based resources and energy storage systems

eess.SY ·2026-11-02 ·Alexander Novikov, Luis A. Garcia-Reyes, Anup Joshi, Ahmar Farooque, Junaid Khalid +1 more
published similarity 0.53
Abstract · Danmarks Tekniske Universitetet, Katholieke Universiteit Leuven, Department of Electrical Engineering, Electrical Energy Computer Architectu…

The decarbonization of the energy sector, driven by the Paris Agreement and the European Green Deal, is increasing the share of renewable energy sources (RES) in power systems. Unlike traditional systems, RES-based systems rely on power electronic converters, which creates unprecedented challenges for reliability and resilience. The future power system is expected to combine a low-level AC layer with an upper-level High Voltage Direct Current (HVDC) backbone, which requires new understanding of fault protection, stability, and interaction between AC and DC components, as well as new models and simulation tools. This is especially critical in systems moving towards 100 percent converter-based generation. Protection systems detect, locate, and isolate faults to protect assets while the rest of the system keeps operating. Traditionally, they rely on the large fault currents supplied by synchronous machines. In modern systems, converter controls limit the fault current contribution to about 120 percent of rated current, so relays that distinguish faults from normal overcurrents based on current level may operate incorrectly. In addition, inverter-based resources (IBR) may not inject enough negative and zero sequence current for directional relays to work properly, and converters hold the voltage at a fixed value only within their reach, beyond which it drops quickly. As a result, existing protection schemes may not provide the expected accuracy and reliability. This report reviews the protection challenges identified in recent academic literature for power systems with high shares of converter-based resources. It covers the specific characteristics of RES, the challenges for protection with intelligent electronic devices (IED), the challenges of converter control during faults, and the main solutions proposed in research over the last decade.

0.49

Comparison of Open-Source PSCAD EMT Models for Large-Scale AI Data Centers in Smart Grids

eess.SY ·2026-11-17 ·Alex Chen, Ahmad Mohammad Saber, Deepa Kundur
similarity 0.52
Abstract · 5 pages, 2 figures, submitted to PESGM 2027

The rapid deployment of artificial intelligence data centers (AIDCs) introduces gigawatt-scale, highly nonlinear, and fast-varying electronic loads that challenge grid voltage regulation, frequency stability, and disturbance ride-through. Capturing their transient behavior during grid faults and rapid computational workload swings requires high-fidelity electromagnetic transient (EMT) simulations rather than root mean square models. However, limited methodologies exist to audit the component-level adequacy of EMT AIDC models. This paper proposes a software-agnostic, 41-point fidelity framework spanning 11 categories that synthesizes 37 criteria from an existing modeling guideline with four novel requirements: frequency ride-through compliance, disaggregated fan and chiller cooling loads, temperature-dependent thermal response, and DC information technology (IT) load representations. Applying this framework to the four publicly available AIDC models in PSCAD/EMTDC reveals varying degrees of completeness: while the models capture IT load transitions, uninterruptible power supplies, and transfer switches for bulk stability studies, critical gaps remain in electro-thermal cooling coupling, internal protective relaying, and site-level controls. Addressing these gaps will enable comprehensive protection coordination and ride-through compliance studies.

0.22

Consumer empowerment: need, definition, quantification, outcomes and challenges

eess.SY ·2026-10-04 ·Md Umar Hashmi
similarity 0.52
Abstract

The transition toward decentralized digitalized and lowcarbon electricity systems is fundamentally changing the role of electricity consumers Traditionally passive endusers are increasingly expected to integrate distributed energy resources DERs and participate in energy management and demand response This paper examines consumer empowerment CE in electricity networks with a specific focus on small consumers connected to distribution networks The paper first discusses the technical economic and societal drivers underlying the growing need for CE including increasing DER penetration electrification of heating and transportation network congestion and flexibility requirements A comprehensive definition of CE is then proposed based on six elements active participation enhanced choice information and control automation and controllability selfsufficiency and resilience and energy communities with shared ownership The proposed CE definition is an explicit consideration of weakgrid where security of supply is not guaranteed To support consistent assessment across different electricity systems a framework for quantifying CE is developed based on the availability of technology and policy enablers and consumers ability to ensure security of supply The paper further reviews global experiences and implementation practices across different continents highlighting variations in technological readiness regulatory support and securityofsupply considerations Finally the expected outcomes and challenges of CE are discussed The expected outcomes of CE are improving affordability flexibility resilience market efficiency DER integration and decarbonization while its successful implementation requires overcoming barriers related to information access digital literacy affordability regulation interoperability privacy cybersecurity and consumer engagement

0.25

Cybersecurity in Power Grids: Standards and Research Challenges

cs.CR eess.SY ·2026-09-15 ·Ferran Bohigas-Daranas, Hamid Latif-Martinez, Nicolas Llorens, David Bru i Bru, Oriol Gomis-Bellmunt +2 more
published similarity 0.52
Abstract

This paper examines Smart Grid cybersecurity, emphasizing the critical distinctions between IT and OT environments. It analyzes grid architecture, substation threats, and key international standards, specifically IEC 62351, IEC 62443, and ISO 27001. Finally, it overviews latest research trends, including AI-driven threat detection.

0.39

Quantifying the Unintentional Islanding Risk: A Comparative Study on Active Distribution Network

eess.SY ·2026-09-10 ·Harshit Nayak, Edoardo Daccò, Jose Luis Rueda Torres, Davide Falabretti
similarity 0.52
Abstract

The growing share of Inverter-Based Resources (IBRs) is changing the operation of modern Active Distribution Networks (ADNs), raising concerns for grid stability, protection, and reliability. In this paper, we investigate the dynamic behavior of a Medium-Voltage (MV) portion of an ADN during the transition from grid-connected to islanded operation. The study considers a Grid-Following (GFL) converter and Synchronous Generators (SGs) operated under two distinct regulation modes: a fixed-setpoint, non-regulating condition representative of present-day distribution networks, and an active frequency/voltage-regulating condition representative of SGs equipped with governor and AVR control. Detailed electromagnetic transient (EMT) models of both technologies have been developed in DIgSILENT PowerFactory that quantifies the sensitivity of island persistence to SG regulation mode and inertia. The results show that when DERs operate at a fixed power setpoint, the risk of forming a sustained, undetected electrical island is limited, since the isolated network drifts out of the protection thresholds within tens of seconds. Conversely, enabling frequency and voltage regulation on the SGs is sufficient to sustain an unintentional island indefinitely without triggering conventional protection, regardless of system inertia.

0.28