Generation and Transmission Expansion Planning with BESS-Based Virtual Transmission Lines

Qiushi Wang, Xingpeng Li

eess.SY ·submitted 2026-10-02 01:56 UTC · v1

Abstract

This paper proposes a mathematical model for long-term Generation and Transmission Expansion Planning (GTEP) that integrates a relaxed Virtual Transmission Line (VTL) as a Storage in Place of Transmission Asset (SIPTA) strategy to address challenges posed by transmission capacity shortages and system congestion in deregulated power markets, particularly under the rapid growth of renewable energy resources and integrated data centers. The proposed VTL formulation coordinates the operation of the two battery energy storage systems (BESSs) forming a VTL pair by preventing them from charging or discharging simultaneously, thereby providing additional congestion relief without introducing an explicit congestion cost into the objective function. Base case studies on a revised IEEE 24-bus system demonstrate that VTL reduces system congestion compared with the standalone BESS case, achieving a 12.3% reduction in weighted total congestion and up to approximately 67% reduction in congestion on individual transmission branches, with only a 0.3% increase in total planning cost. Furthermore, improvements across multiple congestion metrics indicate that the benefits of VTL extend beyond reducing congested line-hours to reducing congestion rent and N-1 transmission violations in the base case. These results demonstrate the potential of VTL to provide congestion mitigation that complements standalone BESS applications.

Comment
Submitted to Energy Conversion and Economics

Closest papers

Nearest neighbours by meaning across the whole index.

Virtual Transmission Lines from Data Center Workload Migration: Coordinated Multi-Year Transmission Expansion Planning

eess.SY ·2026-10-09 ·Mengxin Zhu, Qian Kai, Yadong Liu, Yingjie Yan, Haoyu Zhao
similarity 0.78
Abstract

The rapid growth of electricity demand from AI data centers is creating a dual mismatch in power systems: a temporal mismatch between fast-rising demand and slow transmission expansion, and a spatial mismatch between concentrated data-center loads and geographically dispersed renewable resources. These mismatches can exacerbate transmission congestion, resulting in unserved data-center load and renewable-energy curtailment. This study models geographic workload migration as a virtual transmission line (VTL) that changes nodal data-center demand without transferring physical electricity. A mixed-integer linear programming model is then developed to co-optimize multi-year candidate-line construction and workload migration, subject to construction delays, renewable-energy curtailment, unserved data-center load, workload-balance requirements, communication-bandwidth constraints, and link-latency limits. The model is evaluated over an eight-year planning horizon on a modified IEEE 14-bus system. The results show that coordinating VTL with physical transmission expansion reduces total system cost, unserved data-center load, and renewable-energy curtailment while alleviating transmission congestion. VTL-aware planning also requires one fewer candidate line than build-only planning. However, VTL alone cannot meet system demand and does not eliminate the need for physical transmission reinforcement. Sensitivity analysis indicates that VTL provides the greatest value when transfer capacity is tight, construction costs are high, load growth is rapid, and data-center flexibility is greater. Additional validation on the IEEE 118-bus system over a five-year planning horizon shows that coordinated planning retains its cost and reliability benefits while reducing physical expansion requirements.

0.06

Impact of Data Center Load on Co-Optimized Generation and Transmission Expansion Planning with Embedded Unit Commitment

eess.SY ·2026-10-13 ·Haoxiang Wan, Xingpeng Li, Jonghwan Kwon
published similarity 0.70
Abstract · 6 pages, 2 figures, 3 tables. Accepted to the 2027 IEEE Texas Power and Energy Conference (TPEC)

The rapid growth of hyperscale data centers challenges grid expansion planning, yet existing studies focus largely on operational flexibility rather than long-term investment decisions. This paper examines how large data center loads sited at multiple buses affect co-optimized Transmission Expansion Planning (TEP) and Generation Expansion Planning (GEP). The problem is formulated as a multi-year, Unit Commitment (UC)-embedded mixed-integer linear program on the modified IEEE 24-bus Reliability Test System (RTS-24) with Electric Reliability Council of Texas (ERCOT)-calibrated renewable energy profiles. A 500 MW data center load, about 17.5% of the base-year peak, is allocated across four buses by voltage level, generation headroom, renewable co-location, and network connectivity. Integrating this load raises the 15-year net present value of total system cost by 1,794 million USD (+61.6%) and the system-average locational marginal price (LMP) by 45.2%, with operating cost dominating capital investment (84.2% versus 15.8%). Renewable curtailment remains negligible: existing renewables are already near full utilization, so the added demand is served almost entirely by incremental thermal generation. Most notably, the load shifts the optimal plan from transmission-only to generation-only, replacing the base-case 230 kV reinforcement with a new 400 MW combined-cycle gas turbine and showing that strategically sited generation can substitute for network reinforcement.

0.27

Transmission Expansion and Energy Storage Planning under Great Britain's Uncertain Energy Transition Pathways

eess.SY math.OC ·2026-11-17 ·Shengming Cao, Runsheng He, Waqquas Bukhsh
benchmark similarity 0.69
Abstract · 49 pages, 10 figures

Long term power system planning must account for uncertainty in electricity demand and generation, while recognising the different investment and commissioning characteristics of transmission and energy storage. This paper develops a multi year stochastic framework for coordinated transmission expansion and energy storage planning and applies it to the Great Britain electricity system to assess investment needs through to 2050. The framework integrates multiple energy transition pathways with an enhanced representation of the GB transmission network and captures the different characteristics of transmission and storage investment over time. The coordinated treatment of transmission and storage is considered as a system level benchmark rather than a centralised investment mechanism. In GB, transmission investment is subject to regulated forward looking planning, while storage is largely developed by market participants in response to market signals. The framework therefore quantifies the potential value of improved coordination and identifies where existing investment signals may not encourage complementary storage deployment. Results across alternative transmission only, storage only and coordinated investment strategies show substantial benefits from joint planning. Compared with transmission only planning, coordinated investment reduces additional transmission capacity by 2%, cumulative expected load shedding by 97%, and total expected system cost by 36%, primarily through avoided unserved energy. Transmission preparation periods affect the timing, but not the final portfolio, of investments. Finally, the energy transition pathway materially influences investment requirements, with Electrification and Efficiency requiring 7% more transmission capacity and 45% more storage energy capacity than Falling Behind.

0.23

Co-Optimized Generation, Transmission, and Storage Expansion: System Value and Optimal Duration of Pumped-Storage Hydropower

eess.SY math.OC ·2026-08-27 ·Rafael Benchimol Klausner, Rafael Kelman
similarity 0.66
Abstract

Expansion planning models usually fix storage duration before optimization, setting how much storage power to build but not for how long it can discharge. We present a generation-transmission-storage expansion framework in which candidates of many durations compete on annualized cost, making the duration mix an optimization outcome. It is a rolling-horizon, two-stage stochastic linear program, each five-year stage is a full year at hourly resolution under ten coherent inflow, wind, and solar scenarios. We apply it to the Brazilian Interconnected System over 2030-2050, where demand roughly doubles to 1,716 TWh/year and variable renewable energy (VRE) supplies most new capacity. Two cases are compared: 36 pumped-storage hydropower (PSH) candidates over four subsystems and nine durations (4-144 h) alongside 4-h battery energy storage systems (BESS), and BESS alone. With PSH available, the model builds 31.2 GW / 755 GWh of PSH and no BESS, dominated by 12-h capacity with 4.9 GW of 72-h units. Without PSH it builds 38 GW / 152 GWh of BESS and 7.8 GW more gas-fired capacity, mostly open-cycle peakers. PSH lowers 2050 annualized system cost by US$ 5.0 billion/year (6.8%), operating cost by 23.5%, thermal generation by 34 TWh/year, and long-run marginal cost by 20%; 2035 VRE curtailment falls from 8.4% to 3.2%. The magnitudes are specific to Brazil, but the underlying mechanism is general: limiting storage candidates to a single duration understates the system's optimal energy-storage requirement and overstates its residual need for thermal capacity.

0.30

Impact of Wind-Solar-Battery Growth on Electricity Prices: Reserve Scarcity and Transmission Congestion

eess.SY ·2026-11-14 ·Haoxiang Wan, Ivan Castillo, Xingpeng Li
similarity 0.64
Abstract · 7 pages, 3 figures, 2 tables. Submitted to IEEE GECA 2027

This paper asks whether sequential wind, solar, and battery storage additions that eliminate unserved energy also remove modeled reserve scarcity and transmission congestion. Thirty-one cumulative portfolio states are evaluated on a modified IEEE 24-bus system for a constructed stressed day using a 24-hour day-ahead unit commitment model with network constraints, co-optimized energy and upward reserve, chronological battery storage, and an approximation of the Electric Reliability Council of Texas operating reserve demand curve. The thermal baseline has 106 MWh of unserved energy, whereas 450 MW of wind is sufficient to serve all demand. However, with 1,500 MW of wind, the hourly modeled reserve scarcity price still reaches \$5,000/MWh because wind output declines after the system peak. Adding 1,800 MW of solar reduces the load weighted daily average modeled reserve scarcity price from \$1,136.2/MWh to \$101.2/MWh and confines modeled reserve scarcity to three evening hours. Adding 250 MW/1,000 MWh of battery storage further lowers the average to \$4.3/MWh and reduces wind curtailment from 631 MWh to 306 MWh. Transmission congestion nevertheless remains: all residual wind curtailment occurs at bus 21, wind capture prices at buses 21 and 23 differ by \$31.8/MWh, and identical battery storage plants yield normalized net energy market revenues of \$201/(MW$\cdot$day) and \$121/(MW$\cdot$day) at buses 19 and 21, respectively. These results show that unserved energy, modeled reserve scarcity, and locational congestion effects measure distinct operating conditions and should be evaluated separately but interpreted together.

0.35

Time to AC-t: When AC-transmission changes capacity expansion planning

eess.SY math.OCphysics.soc-ph ·2026-11-02 ·Lara Booth, Shiva Madadkhani, Ruaridh Macdonald, Priya L. Donti
code/data similarity 0.64
Abstract · 35 pages, 5 figures, 3 tables; plus 16 pages of supplemental information (8 figures, 6 tables). Submitted to Joule

Capacity expansion models often dramatically simplify the physics of how power flows through a transmission network in order to preserve computational tractability. However, with the rapid growth of electrification, large loads, renewables, and storage, increased realism in planning future grids is imperative. We extend the open-source capacity expansion model GenX with AC optimal power flow physics, and analyze generation, storage, and transmission investment decisions for 20-zone, hourly models of Germany and Texas. We compare our results against those using two common approximations, the transport model and DC optimal power flow. We find that total costs and emissions largely agree across all formulations. However, we find substantial differences in outputs related to transmission, generation siting, storage, and reactive-power support between the approximate formulations and the true AC physics formulation. We identify where AC physics changes planning decisions and discuss how to potentially capture these effects without the full computational cost.

0.23

Supporting Data Center Grid Integration via Co-Optimized Battery Energy Storage Sizing and Capacity Allocation

eess.SY math.OC ·2026-11-06 ·Wei Wang, Himanshu Sharma, Thiagarajan Ramachandran
similarity 0.64
Abstract

Interconnecting large data centers can be delayed by grid requirements on demand flexibility, ramping limits, and ride-through performance. This paper proposes an optimization-based framework to size a Battery Energy Storage System (BESS) that accelerates data center grid integration by providing BESS capacity required to meet selected flexibility and grid-support requirements. The model co-optimizes BESS power rating and energy capacity while allocating capability across three services: (i) demand response over a specified duration, (ii) mitigation of high-magnitude, high-frequency load fluctuations through reserved active power with zero net state-of-charge change, and (iii) voltage support via reactive power capability at the point of common coupling. Minute-level operational scheduling enforces state-of-charge feasibility and load ramp constraints, and incorporates a controllable queue of delay-insensitive computing tasks to enhance flexibility. A case study using a real data center load profile demonstrates the proposed method and quantifies the BESS power-energy requirements and operational trade-offs needed to satisfy the multi-service constraints, providing practical guidance for interconnection planning and deployment.

0.05

Trust-Region Benders for Scalable Multiperiod Expansion Planning for Transmission and Storage

eess.SY ·2026-10-23 ·Kevin Wu, Rabab Haider, Pascal Van Hentenryck
published similarity 0.64
Abstract · Presented at PowerUp 2026, September 9-11, 2026, Boulder, Colorado

Transmission expansion planning (TEP) seeks to identify cost-effective investment strategies that enable power systems to reliably meet future demand, while accounting for the location, timing, and operational impacts of infrastructure upgrades. As demand grows and renewable penetration increases, there is growing interest in jointly modeling energy storage investments to enhance operational flexibility. This work presents a multiperiod formulation that co-optimizes transmission reconductoring and energy storage installation across multiple planning periods. To solve the resulting large-scale problem efficiently, a Benders decomposition with per-period trust-region stabilization and a relaxation-based warm-start procedure is proposed. The approach is demonstrated on a 2,000-bus Texas system, producing an investment plan spanning 2030-2045 with optimality gap below 1.0%, and is compared against a rolling-horizon approach to highlight the benefits of multiperiod coordination.

0.29