CS Paper Radar

Time to AC-t: When AC-transmission changes capacity expansion planning

Lara Booth, Shiva Madadkhani, Ruaridh Macdonald, Priya L. Donti

eess.SY math.OCphysics.soc-ph ·submitted 2026-11-02 23:57 UTC · v1
code/data

Abstract

Capacity expansion models often dramatically simplify the physics of how power flows through a transmission network in order to preserve computational tractability. However, with the rapid growth of electrification, large loads, renewables, and storage, increased realism in planning future grids is imperative. We extend the open-source capacity expansion model GenX with AC optimal power flow physics, and analyze generation, storage, and transmission investment decisions for 20-zone, hourly models of Germany and Texas. We compare our results against those using two common approximations, the transport model and DC optimal power flow. We find that total costs and emissions largely agree across all formulations. However, we find substantial differences in outputs related to transmission, generation siting, storage, and reactive-power support between the approximate formulations and the true AC physics formulation. We identify where AC physics changes planning decisions and discuss how to potentially capture these effects without the full computational cost.

Comment
35 pages, 5 figures, 3 tables; plus 16 pages of supplemental information (8 figures, 6 tables). Submitted to Joule

Closest papers

Nearest neighbours by meaning across the whole index.

Modeling of Network Constraints in Large-scale Capacity Expansion Optimization of Power Grids

eess.SY math.OC ·2026-08-28 ·Yu Weng, Lara Booth, Priya L. Donti, Ruaridh Macdonald
publishedtheoryhot direction similarity 0.77
Abstract

Capacity expansion modeling plays a critical role in optimizing the deployment of new generation, storage, and transmission, typically at national and regional levels. To support long-term planning, these models consider a large set of energy technologies and policies, along with decades of weather and demand data. Realistic capacity expansion models thus become high-dimensional optimization problems, with hundreds of millions of variables and constraints, which are challenging to solve. A common strategy to address this complexity is to omit non-linear, non-convex AC optimal power flow (ACOPF) constraints and instead use linearized power balance equations or transport formulations. While these simplifications improve tractability, they limit our understanding of how power flow and the physical properties of power networks impact investment decisions across generation, storage, and transmission infrastructure. This paper addresses this gap by extending the GenX capacity expansion model to incorporate fixed point theorem-based network constraints. These embed ACOPF-based considerations while maintaining the tractability of the planning model, nearly preserving the dimensionality of the transport formulation and incurring only modest runtime increases. This approach is much cheaper than embedding ACOPF directly, making it appropriate for large-scale capacity planning problems. We compare our approach to the original transport-based GenX model as well as a non-linear, non-convex version that incorporates the full ACOPF constraints, for a case study of the ISO New England grid.

0.47

Generation and Transmission Expansion Planning with BESS-Based Virtual Transmission Lines

eess.SY ·2026-10-02 ·Qiushi Wang, Xingpeng Li
similarity 0.64
Abstract · Submitted to Energy Conversion and Economics

This paper proposes a mathematical model for long-term Generation and Transmission Expansion Planning (GTEP) that integrates a relaxed Virtual Transmission Line (VTL) as a Storage in Place of Transmission Asset (SIPTA) strategy to address challenges posed by transmission capacity shortages and system congestion in deregulated power markets, particularly under the rapid growth of renewable energy resources and integrated data centers. The proposed VTL formulation coordinates the operation of the two battery energy storage systems (BESSs) forming a VTL pair by preventing them from charging or discharging simultaneously, thereby providing additional congestion relief without introducing an explicit congestion cost into the objective function. Base case studies on a revised IEEE 24-bus system demonstrate that VTL reduces system congestion compared with the standalone BESS case, achieving a 12.3% reduction in weighted total congestion and up to approximately 67% reduction in congestion on individual transmission branches, with only a 0.3% increase in total planning cost. Furthermore, improvements across multiple congestion metrics indicate that the benefits of VTL extend beyond reducing congested line-hours to reducing congestion rent and N-1 transmission violations in the base case. These results demonstrate the potential of VTL to provide congestion mitigation that complements standalone BESS applications.

0.17

EPIGRIDS: Documentation and Validation of Seven Open Synthetic Transmission Grid Cases

eess.SY math.OC ·2026-11-13 ·Jonathan M. Snodgrass, Scott Greene, Thomas J. Overbye, Christopher L. DeMarco, Bernard C. Lesieutre
benchmark similarity 0.63
Abstract · 10 pages, 2 figures, 6 tables. Submitted to the IEEE Open Access Journal of Power and Energy. Cases: https://doi.org/10.5281/zenodo.23814538…

This paper documents and checks EPIGRIDS, seven open synthetic transmission grid cases from four independently built networks, made with an optimization-based construction method instead of the graph-statistics method behind most large public synthetic grids. The cases range from 250 to 78,484 buses, with geolocated substations, voltages up to 765 kV, and line parameters taken from conductor data. Each ships under an open license in three common power flow formats that agree at the solved operating point, and the six larger cases have a companion hourly, bus-level load series for one year. The Texas, Florida, and Michigan, Ohio, and Indiana cases are sub-networks of the Eastern case. Every case solves an alternating-current power flow from its stored operating point. With parallel circuits merged, the Eastern and Western cases are 9 and 16% denser than the real interconnections, while graph-statistics cases on the same footprints lie within 6% and meet more published realism criteria. A full single-outage contingency analysis completes on every case, and in an optimal power flow benchmark every case except the New England base case and one of its 12 operating points solves in polar form.

0.40

Co-Optimized Generation, Transmission, and Storage Expansion: System Value and Optimal Duration of Pumped-Storage Hydropower

eess.SY math.OC ·2026-08-27 ·Rafael Benchimol Klausner, Rafael Kelman
similarity 0.63
Abstract

Expansion planning models usually fix storage duration before optimization, setting how much storage power to build but not for how long it can discharge. We present a generation-transmission-storage expansion framework in which candidates of many durations compete on annualized cost, making the duration mix an optimization outcome. It is a rolling-horizon, two-stage stochastic linear program, each five-year stage is a full year at hourly resolution under ten coherent inflow, wind, and solar scenarios. We apply it to the Brazilian Interconnected System over 2030-2050, where demand roughly doubles to 1,716 TWh/year and variable renewable energy (VRE) supplies most new capacity. Two cases are compared: 36 pumped-storage hydropower (PSH) candidates over four subsystems and nine durations (4-144 h) alongside 4-h battery energy storage systems (BESS), and BESS alone. With PSH available, the model builds 31.2 GW / 755 GWh of PSH and no BESS, dominated by 12-h capacity with 4.9 GW of 72-h units. Without PSH it builds 38 GW / 152 GWh of BESS and 7.8 GW more gas-fired capacity, mostly open-cycle peakers. PSH lowers 2050 annualized system cost by US$ 5.0 billion/year (6.8%), operating cost by 23.5%, thermal generation by 34 TWh/year, and long-run marginal cost by 20%; 2035 VRE curtailment falls from 8.4% to 3.2%. The magnitudes are specific to Brazil, but the underlying mechanism is general: limiting storage candidates to a single duration understates the system's optimal energy-storage requirement and overstates its residual need for thermal capacity.

0.30

Mitigating the Grid Impact of Gigawatt-Scale AI Data Centers via High-Fidelity Model Flexibility

eess.SY math.OC ·2026-11-18 ·Eihab E. E. Ahmed, Saeed Manshadi
hot direction similarity 0.62
Abstract

Gigawatt-scale artificial intelligence data centers (AIDCs) are being connected at a single point of interconnection (POI) faster than transmission can be reinforced, yet studies of their flexibility rely on DC power flow and simplified load envelopes that omit voltage, cooling dynamics, and workload deadlines. This paper addresses this gap by embedding a high-fidelity AIDC model, with separate inference and training pools, hall thermal mass, PV, a battery energy storage system (BESS) with reactive capability, and a STATCOM, in a five-minute multi-period AC optimal power flow. Simulations on the RTS-GMLC test system show that active-power flexibility mitigates local price spikes and relieves congestion, whereas reactive support from the BESS inverter or a STATCOM is needed to keep the POI voltage away from sagging around its 0.95~pu limit. Sensitivity analyses show that cost-driven charging of large batteries can induce new morning congestion and that storage largely substitutes for wider workload deferral.

0.30

AC Assessment of DC Power Flow Screening for Data Center Hosting Capacity and Siting

eess.SY ·2026-11-14 ·Haoxiang Wan, Jesus Silva-Rodriguez, Jonghwan Kwon, Xingpeng Li
hot direction similarity 0.62
Abstract · 5 pages, 5 figures, 1 table. Submitted to the 2027 IEEE PES General Meeting

A screening procedure based on direct current (DC) power flow estimates the data center hosting capacity of a candidate bus, termed the DC-screened capacity, and selects the generator commitment that supports it. This paper assesses that estimate under the alternating current (AC) network model. With the selected commitment fixed, an AC optimal power flow reoptimizes dispatch and voltages to find the largest data center load the bus can carry, termed the AC-assessed capacity. On a synthetic Texas system with 123 buses, the DC-screened capacity exceeds the AC-assessed capacity at 113 buses. Across all 123, the ratio of DC-screened to AC-assessed capacity has a median of 143% (a 43% overestimate) and a maximum of 1,070%. At these 113 buses, the DC-screened capacity violates a branch apparent power limit or a generator reactive power limit in the AC model, two limits the DC model omits. The overestimate changes decisions: a 1-GW project passes DC screening at every bus but exceeds the AC-assessed capacity at 37, and the bus ranked first by DC screening has 205.5 MW less AC-assessed capacity than the bus ranked second. Reporting the AC-assessed capacity beside each DC-screened capacity lets planners reject oversized projects or choose better sites.

0.39

GridForge: A Tractable Network-Flow Method for Constructing Open, Continental-Scale Synthetic Power Grids

eess.SY ·2026-11-12 ·Jonathan M. Snodgrass, Thomas J. Overbye, Christopher L. DeMarco, Bernard C. Lesieutre
similarity 0.61
Abstract · 30 pages, 10 figures, 7 tables; supplementary material as an ancillary file. Submitted to the International Journal of Electrical Power & En…

The goal of this paper is to construct open, continental-scale synthetic transmission grids with an optimization method that stays tractable. Security restrictions keep models of the real grid out of open research and machine-learning datasets, and optimization-based construction is hard at scale: the number of candidate lines grows combinatorially, so electrically faithful methods prune the candidates in advance. This paper presents GridForge, which keeps every bus pair within physical length limits as a candidate, selects lines with Garver's length-weighted network-flow linear program instead of binary decisions, and resizes them with a sequential direct-current (DC) power flow. Two stages of 13 regional networks are evaluated. Their node-degree distributions are nearly as strongly log-linear as those of the real Eastern and Western Interconnections ($R^2$ of 0.92 to 0.98 against 0.971 and 0.981), although the areas under the fitted lines differ from the real ones by 39.9% on average. On the upper Midwest and Tennessee Valley footprints, resizing lowers the DC power-flow loss from 5.89% to 4.14% and from 14.55% to 7.05%, and the DC optimal power-flow loss from 4.03% to 2.02% and from 5.54% to 2.47%. Without relaxing any line limit, the DC optimal power flow is feasible in 78.81% and 0.82% of the scenarios. Most lines are built at 69 kV. The models span 250 to 78,484 buses, were built on single machines, and are freely redistributable.

0.52

Trust-Region Benders for Scalable Multiperiod Expansion Planning for Transmission and Storage

eess.SY ·2026-10-23 ·Kevin Wu, Rabab Haider, Pascal Van Hentenryck
published similarity 0.61
Abstract · Presented at PowerUp 2026, September 9-11, 2026, Boulder, Colorado

Transmission expansion planning (TEP) seeks to identify cost-effective investment strategies that enable power systems to reliably meet future demand, while accounting for the location, timing, and operational impacts of infrastructure upgrades. As demand grows and renewable penetration increases, there is growing interest in jointly modeling energy storage investments to enhance operational flexibility. This work presents a multiperiod formulation that co-optimizes transmission reconductoring and energy storage installation across multiple planning periods. To solve the resulting large-scale problem efficiently, a Benders decomposition with per-period trust-region stabilization and a relaxation-based warm-start procedure is proposed. The approach is demonstrated on a 2,000-bus Texas system, producing an investment plan spanning 2030-2045 with optimality gap below 1.0%, and is compared against a rolling-horizon approach to highlight the benefits of multiperiod coordination.