Distributed Economic Dispatch Scheme of A BESS Network with A Switching Utility Grid in Energy Internet Paradigm via Reset Consensus Method

Yalin Zhang, Zhongxin Liu, Yulin Chen, Donglian Qi, Zengqiang Chen

eess.SY ·submitted 2026-10-11 14:24 UTC · v1
published

Abstract

This article aims to design a distributed economic dispatch (ED) scheme based on marginal cost (MC) consensus for a battery energy storage system (BESS) network considering the utility grid switching. Due to the low control accuracy and slow convergence speed of previous schemes, some important changes have been made in this article. Firstly, the feedback coupling term is introduced into the closed-loop error to further improve the stability and convergence rate of the controller. Then, a proportional integral (PI) controller with a reset mechanism is implemented in the designed scheme, which improves the speed and control accuracy of MC consensus. The performance of a control system with a reset mechanism is well guaranteed by analyzing the eigenvalues of the corresponding matrix. Finally, some tests focus on UG switching, time phased pricing, load switching, a BESS/agent plug and play, and large-scale system applications to illustrate the effectiveness and progressiveness of the design scheme.

DOI
10.1109/TII.2026.3731636

Closest papers

Nearest neighbours by meaning across the whole index.

Design of Economic Dispatch Schemes of An Isolated BESS Network Based on Distributed Discrete-time PI+Rest Consensus

eess.SY ·2026-09-17 ·Yalin Zhang, Zhongxin Liu, Zengqiang Chen
published similarity 0.83
Abstract

Battery energy storage systems (BESSs) are widely integrated into smart grids. For an isolated BESS network, however, capacity degradation and power loss of battery units increase operating costs. To alleviate this problem, two distributed economic dispatch (ED) schemes with discrete-time dynamics are developed in this paper, thus obtaining the optimal output power vector and ensuring supply-demand balance while considering dynamic line loss and capacity constraints. It is worth mentioning that proportional-integral protocols with reset mechanisms (PI+R protocols) are introduced into these schemes which can greatly improve the consensus rate and control accuracy. Specifically, a marginal cost (MC) consensus controller and an average power mismatch estimator are the core components of each scheme, where these two are coupled to each other. In this regard, the difference between the two schemes is that for the MC consensus controllers, one involves incorporating the estimated average power mismatch feedback term into the closed-loop system error to design the PI+R protocol, while the other does not. In addition, regarding to each PI+R protocol, the integral term is reset to 0 when the proportional term experiences zero crossing, in order to accelerate the convergence rate and reduce overshoot. The effectiveness, conditions under which the reset mechanism works, and stability of these schemes are all well analyzed. Finally, some simulation cases are designed and compared with an existing solution. From the simulation results, it can be seen that the designed second scheme greatly improves the performance of the previous scheme in consensus rate, convergence rate, BESS/agent plug and play, load switching, and wide area system application.

0.47

Distributed Cooperative Control with Prescribed Performance of BESSs with A Unified Discharge Constrain for Power Allocation under Dynamic Load

eess.SY ·2026-09-19 ·Yalin Zhang, Zhongxin Liucand Fuyong Wang, Zengqiang Chen
publishedhot direction similarity 0.67
Abstract

Battery energy storage system (BESS) is integrated into the smart grid to enhance scalability, economy, and greenery. And the State-of-Charge (SoC) balance is one of the basic problems of BESSs, which can maximize the utilization of capacity. BESSs with a unified relative variation rate for SoC can be simultaneously filled or empty, while real-time estimation schemes of SoC balance and power sharing states are required in this power allocation scheme. Therefore, the prescribed performance control (PPC) method is applied in this paper to design two distributed estimators based on multi-agent systems (MASs), in order to estimate the power sharing and SoC balance states in real-time under dynamic load driving. In this way, these two average values can ultimately be well estimated with almost zero error performance, and dynamic performance and steady-state performance of the two estimators can be adjusted by different parameters. Similarly, consensus performance and dynamic tracking performance are decoupled. These results provide a broader range for the selection of gains. To verify the effectiveness, robustness and progressiveness of the designed estimators, some cases with a resistance network containing 4 BESSs as load distribution are designed and discussed. Further more, to test scalability, a large-scale system containing 12 BESSs is conducted to the designed scheme.

0.60

A Distributed Step-by-step Finite-time Consensus Design for Heterogeneous Battery Energy Storage Devices with Droop Control

eess.SY ·2026-09-18 ·Yalin Zhang, Yunzhong Song, Shumin Fei
publishedhot directionhighly cited similarity 0.63
Abstract

As all generators are distributed in different areas among large scale power systems, the cooperative manipulation of the multi-generator system cannot be done well without consideration of the distance information of the generators, A distributed step-by-step finite-time consensus scheme for the heterogeneous Battery Energy Storage System (BESS) is proposed in this paper, where the coordinated consensus can be come into reality within a limited time, which is appealing for the electrical engineering community. To be concrete, at first, all BESSs are classified into several clusters according to their locations, and in each cluster, there is an active leader in charge of information receiving from outside. Then after, in order to coordinate the multi BESSs, five inputs, which are function oriented, were used to achieve energy level balancing, active/reactive power sharing, and voltage/frequency synchronization of the multi BESSs. To be further, the frequency and voltage restoration to the nominal values of the main grid was made possible by the introduction of a virtual leader, which is actually an external leader. Compared with the centralized methods, this control scheme is entirely distributed, and each BESS only utilizes the information of its own and its neighbors. Besides, this control is robust to the load perturbation and the plug-and-play of the communication topology. Finally, some simulation experiments are executed on the modified IEEE 57-bus system to verify the suggested scheme.

0.70

Distributed Multiconsensus Control of BESSs Based on Centrality of Eigenvectors

eess.SY ·2026-09-18 ·Yalin Zhang, Zhongxin Liu, Zengqiang Chen
publishedhighly cited similarity 0.62
Abstract

Secondary control and the State-of-Charge (SoC) balance control are important control objectives for battery energy storage systems (BESSs). In this brief, a communication weight allocation method based on the centrality of eigenvectors is designed for a connected and directed graph, which results in the adjacency matrix having a given eigenvector. Subsequently, a distributed secondary voltage controller and an SoC balancing controller are designed for droop-controlled BESSs to achieve voltage leader-following multiconsensus and SoC balancing, respectively. It is worth mentioning that under the designed voltage secondary control scheme, only a single leader is needed to achieve voltage multiconsensus control. In addition, the capacity information/droop coefficient does not need to be transmitted in the communication network to achieve power sharing according to capacity and SoC balance. For SoC balance control, the control gain is also well analyzed to ensure stability. The relevant simulations verify the effectiveness of the designed scheme.

0.68

Communication Delay Robust Control of BESS for AI Training Load Smoothing

eess.SY ·2026-09-18 ·Xue Lyu, Wei Du, Sheik Mohammad Mohiuddin, Brett A. Ross
hot direction similarity 0.62
Abstract · 10 pages, 17 figures

AI training loads can exhibit rapid power fluctuations because their power demand differs significantly between computational and communication phases, creating challenging ramp rates at the data center point of common coupling (PCC). Integrating battery energy storage systems (BESS) in data centers is a promising mitigation option. This paper proposes a hybrid BESS control strategy that combines droop-based grid-forming (GFM) control with instantaneous load current-based compensation to suppress high frequency load fluctuations. The GFM control loop regulates the long-term power exchange of the BESS, while the load-following control provides fast compensation for short-term AI workload fluctuations. Communication delay between the load current measurements and the BESS controller is explicitly modeled, and its impact on smoothing performance is analyzed. To mitigate delay-induced degradation, a predictor-based compensation method is incorporated into the BESS control structure. High-fidelity electromagnetic transient simulations are conducted to validate the proposed approach. Results demonstrate effective smoothing of AI training load fluctuations across different grid strength conditions and under time varying communication delays.

0.28

Optimal Coordination of Heat Pump Demand Flexibility and Battery Energy Storage Considering the Operation of Distribution Networks

eess.SY ·2026-10-06 ·Gustavo L. Aschidamini, Guilherme S. Castiglio, Mariana Resener
similarity 0.61
Abstract

Electrifying space heating with heat pumps (HP) and backup electric-resistance heaters (ERH) is incentivized to support decarbonization but increases voltage and thermal issues in distribution networks. Direct load control (DLC) of smart thermostats (ST) provide grid support, yet, to the best of our knowledge, existing methods do not co-optimize this flexibility with grid-scale battery energy storage systems (BESS) and voltage-regulation devices, and do not use ERH for preheating, limiting peak demand reduction and undervoltage mitigation. We propose a mixed-integer linear programming (MILP)-based model predictive control (MPC) framework that coordinates ST setpoints for preheating and setback, grid-scale BESS, on-load tap changers, switched capacitor banks, and step voltage regulators. The framework is evaluated on 23-node and 733-node distribution networks, including a real-data-based feeder, across multiple realized days. On the 23-node feeder with 50% HP penetration and 50% DLC participation, the proposed framework reduces the feeder peak by 23.1%, and by 27.1% with the co-optimized BESS. Rolling-horizon setpoint optimization contributes 6.5 percentage points beyond a day-ahead ST schedule (16.6%), and dispatching the ERH for preheating adds 2.7 percentage points beyond backup-only operation (20.4%). On the 733-node feeder, where thermal congestion is the binding constraint, the framework reduces overloaded branches by 94% and overloaded transformers by 47%. These results demonstrate the potential of coordinated demand flexibility and voltage regulation to accommodate heating electrification.

0.12

Optimal Coordination of Multiple Ancillary Service Provisions in Active Distribution Networks

eess.SY ·2026-11-14 ·Xinbao Jia, Yi Guo, Ognjen Stanojev, Zhen Chen, Yuning Jiang +1 more
similarity 0.59
Abstract · 16 pages

We propose a multi-rate model predictive control (MPC) framework for coordinating primary frequency control (PFC), automatic generation control (AGC), and voltage control (VC) in active distribution networks. The framework allocates distributed energy resource (DER) flexibility among these three ancillary services while retaining their different update rates. To account for the intertemporal flexibility of electric vehicle aggregations and aggregations of buildings with thermostatically controlled loads (TCLs), we incorporate time-varying power-energy envelopes into our multi-rate MPC formulation. These constraints couple the combined PFC and AGC response to the demand-side flexibility available later in the prediction horizon. Furthermore, the input-multirate structure enables coordinated ancillary service provision by DERs with different response dynamics. The controller optimizes the three services together, allowing fast regulation to be coordinated with the developing slow response within the available DER flexibility. We demonstrate the coordinated provision of the three ancillary services through closed-loop simulations on a modified IEEE 33-bus system using a nonlinear differential-algebraic model.

0.25

Tie-Line Scheduling Using Real-Time Contraction Metrics: Hierarchical Reachable Sets for Multi-Area Inverter-Dominated Grids

eess.SY ·2026-11-16 ·Richard Sherman
similarity 0.57
Abstract

Managing transmission congestion in multi-area power grids dominated by inverter-based resources (IBRs) requires bridging a severe timescale and modeling divide. Supervisory congestion optimizers -- such as Online Feedback Optimization (OFO) and two-tiered differentiable Model Predictive Control (MPC) -- rely on linearized, convex algebraic grid approximations that cannot guarantee dynamic stability during sub-second converter transients. Conversely, fast distributed consensus schemes like Alternating Direction Method of Multipliers (ADMM) depend on convex plant assumptions and iterative message exchanges that lag behind rapid tie-line surges. This paper replaces convex ADMM emergency consensus with a Distributed Nonlinear Separable Control Contraction Metric (SCCM) architecture spanning three nested tiers: the Device layer, the Area layer, and the Grid tie-line layer. By pairing online Prediction Error Method and Moving Horizon Estimation (PEM-MHE) parameter tracking with offline convex Linear Matrix Inequality (LMI) synthesis, the controller executes a closed-form nonlinear feedback law online without solving real-time optimization problems. We derive the Pontryagin attainable (reachable) ellipsoids for each layer, prove hierarchical tube containment via Schur-complement matrix inequalities, and project the certified Grid reachable tube through Power Transfer Distribution Factors (PTDFs) to supply guaranteed safe thermal limits to the supervisory coordinator. Validation on modified IEEE 39-bus (100% IBR, zero synchronous generators) and 3-area IEEE 118-bus systems demonstrates an 82.8% reduction in cumulative tie-line thermal overload while maintaining strict exponential contraction ($λ_{\max} \le -2.43$) even under a 3 s communication blackout.

0.29