CS Paper Radar

DCCB-Capability-Aware Optimal Info-Power Flow for Transmission Switching in AC/MTDC Grids

Haixiao Li, Aleksandra Lekić

eess.SY ·submitted 2026-10-12 13:34 UTC · v1

Abstract

Transmission switching is an effective approach for restoring operational flexibility and improving the economic performance of AC/multi-terminal DC (MTDC) grids following DC-side faults. Its practical implementation requires that the faulted branch be safely isolated and that the associated switching commands be successfully delivered through the communication network. However, conventional transmission switching models generally represent switching actions using binary variables, without considering the availability of communication resources or whether the corresponding DC circuit breakers (DCCBs) can interrupt the fault current affected by time delay. To address these issues, this paper develops an explicit optimal info--power flow (OIPF) formulation that incorporates information transmission into the post-fault transmission-switching optimization for AC/MTDC grids. The switching status of each DC branch is determined by the availability of its communication path and associated communication resources. In addition, binary switching decisions are supplemented by a DCCB feasibility constraint that limits the estimated delayed-interruption current to the DCCB breaking capability. The resulting problem is formulated as a mixed-integer second-order cone programming (MISOCP) model that can be efficiently solved using off-the-shelf optimization solvers. Numerical results reveal that limited communication capacity and additional routing costs may render electrically beneficial switching actions infeasible or uneconomical, while delay-aware DCCB interruption constraints may favor lower-delay communication routes despite their higher costs.

Closest papers

Nearest neighbours by meaning across the whole index.

Seeking Cost--Effective Incentive for Merchant MTDC Investment in an AC Grid: A Parametric MISOCP Model to VSC Siting and Sizing

eess.SY ·2026-10-21 ·Haixiao Li, Jure Lokar, Leopold Herman, Aleksandra Lekić
similarity 0.63
Abstract

Deploying voltage source converter (VSC)-based multi-terminal DC (MTDC) networks in existing AC grids offers a promising solution for alleviating transmission congestion, enhancing power-transfer capability, and improving operational economy. However, constructing an MTDC network requires participation from merchant investors. Therefore, the transmission system operator (TSO) responsible for the AC grid must provide an adequate economic incentive that enables merchant investors not only to recover the MTDC investment cost but also to earn a reasonable return commensurate with their risk and expectations. An insufficient incentive may fail to attract merchant investment, whereas an excessive incentive may unnecessarily reduce the economic benefits retained by the TSO. Determining an appropriate incentive that balances these competing interests therefore becomes a critical issue. To address this issue, this paper formulates a sharing-rate-parameterized mixed-integer second-order cone programming (MISOCP) model that jointly optimizes VSC siting and sizing while coordinating AC/DC system operation. A straightforward search procedure is then employed to identify the benefit-sharing rate that meets the investor's expectations while preserving sufficient benefits for the TSO. Case studies demonstrate the operating-cost benefits of MTDC integration and validate the proposed search strategy for seeking such a benefit-sharing rate.

0.20

Quantifying the Cost of Restoring AC Feasibility for Approximate Optimal Power Flow Solutions

eess.SY math.OC ·2026-11-11 ·Sanjay Johnson, Sungho Shin
theory similarity 0.59
Abstract · 5 pages, 4 figures, submitted to 2027 IEEE Power & Energy Society General Meeting

Power system operations rely on approximate solutions of the AC optimal power flow problem, most notably the DC optimal power flow used in security-constrained unit commitment and economic dispatch, while convex relaxations, machine learning surrogates, and other approximations are studied extensively in the academic literature. Because these approximations neglect or relax parts of the AC power flow equations, their solutions must be adjusted before dispatch; for example, the DC optimal power flow, which neglects transmission losses, reactive power, and voltage magnitude variations, is known to produce solutions that are always infeasible. The cost of this adjustment is not adequately understood. This paper proposes a method that quantifies, for any approximate solution, the minimum cost of the adjustments that restore AC feasibility, which is a lower bound on the cost of the heuristic adjustments used in practice. We apply it to the DC optimal power flow, the second-order cone and quadratic convex relaxations, and the AC optimal power flow solved to a loose relative tolerance of $10^{-4}$ instead of $10^{-8}$. Relative to the AC optimal power flow solution obtained from a local nonlinear optimization solver, and even with the minimum adjustment, the DC optimal power flow requires adjusting, on average, generators that account for 15.6% of total generation capacity and incurs a 1.10% cost increase; the convex relaxations require more adjustment (17.2% and 16.9%) but smaller cost increases (0.68% and 0.78%); and the loose-tolerance AC optimal power flow requires 6.1% and incurs 0.42%. These results indicate significant value in operating markets directly on the AC optimal power flow, which avoids the distortion of the dispatch and prices caused by heuristic feasibility restoration.

0.27

An Interline Multiport DC Circuit Breaker with Power Flow Controller

eess.SY ·2026-11-07 ·Maliha Ferdous, Zhi Jin Zhang, Qichen Yang, Maryam Saeedifard
published similarity 0.56
Abstract

Currently, the high-voltage multi-terminal DC (MTDC) grids face two major challenges. First, fast rise rate and lack of zero-crossing point in DC-side fault currents render AC circuit breakers inoperable. Second, DC line currents are passively determined by terminal DC voltages and line resistances, which inherently limits the capability of changing individual line currents for essential grid services such as power flow management and overloading prevention. To address these two limitations, DC circuit breakers (DCCBs) and DC power flow controllers (DCPFCs) have been developed. The conventional DCCBs are two-port devices installed in series with DC lines at their terminals in an MTDC converter substation, so that any fault current flowing through the line can be rapidly cleared. Additionally, a DCPFC can be installed at line terminals to adjust terminal voltages and power exchanges among adjacent lines. As a result, for a substation that connects to multiple lines, it needs to host multiple DCCBs and a DCPFC, which significantly increases the cost and footprint of both the substation and the MTDC grid. To this end, this work proposes an integrated equipment combining multiple DCCBs and a DCPFC, called the interline multiport DCCB with DCPFC, which can reduce the number of components and enhance the economic feasibility of MTDC networks. This paper presents the topology, operation principles, and component selection procedures of the proposed equipment, and compares it with the state-of-the-art technologies. Electromagnetic transient (EMT) simulation results validate the fault interruption and power flow control performance of the interline multiport DCCB with PFC.

0.38

AI Inference-Aware Optimal Power Flow: Converting Token Requirements into Grid Flexibility

eess.SY ·2026-11-14 ·Qianyi Ma, Dawei Qiu, Xiao Liu
similarity 0.55
Abstract

The rapid growth, temporal variability, and geographic concentration of electricity demand from artificial intelligence (AI) inference can aggravate transmission congestion near data centers (DCs). The spatial and temporal flexibility of inference workloads offers an opportunity to alleviate this congestion: requests can be routed across DCs or deferred within users' quality-of-service (QoS) requirements. However, inference routing primarily considers graphics processing unit (GPU) availability, leaving this flexibility underused in grid operation. Using GPU measurements, this paper models inference latency and DC power consumption to quantify the flexibility available under users' time-to-first-token (TTFT) and inter-token latency (ITL) requirements. These models are then incorporated into an AI inference-aware optimal power flow (OPF) that coordinates inference routing and power system operation among DC operators, the transmission system operator, and inference users. By linking user requests, token generation at DCs, and electricity delivery through the transmission network, the formulation schedules inference workloads subject to both users' QoS requirements and transmission constraints. Simulations on the PJM system show that, compared with computing-based routing and with electricity price-based routing, coordinating inference routing with network operation enables growing DC electricity demand deliverable to be met at lower cost.

0.20

Network Topology Reconfiguration: Optimal Transition Planning

eess.SY ·2026-08-12 ·Basel Morsy, Jochen Stiasny, Adolfo Anta, Jochen Cremer
similarity 0.53
Abstract · This work has been submitted to the IEEE for possible publication. Copyright may be transferred without notice, after which this version may…

Network topology reconfiguration (NTR) can reduce power system operating costs by co-optimizing generation dispatch and substation switching, but the reported savings describe a target operating point rather than a way to reach it. Reaching this operating point requires a sequence of intermediate operating points, each satisfying the AC power flow equations and thermal limits; because each topology admits its own feasible dispatch region, a naive transition that switches or redispatches first can drive intermediate flows past their thermal limits. Existing methods leave this gap open: snapshot NTR identifies a target but not a route. We formulate the Optimal Transition Planning (OTP) problem, co-optimizing the switching sequence and dispatch trajectory subject to AC feasibility at every intermediate point. We solve this problem with a receding-horizon framework: a DC planner proposes a trajectory that is certified against an AC feasibility filter, and infeasible topologies are excluded using reusable combinatorial cuts. Case studies on congested PGLib-OPF systems up to 1354-bus show that the method produces AC-feasible transitions that reduce operating cost by up to 18.4% compared to the no-switching ACOPF solution on commodity hardware.

0.06

Strengthening AC optimal power flow relaxation through offline bound tightening and linear approximations

eess.SY math.OC ·2026-10-23 ·Xiangxin An, Constance Crozier, Santanu S. Dey
similarity 0.53
Abstract · 15 pages, 4 figures

The alternating-current optimal power flow (ACOPF) problem is fundamental to power system operation and planning, but its nonconvexity makes globally optimal solutions of large-scale instances computationally challenging. Convex relaxations provide tractable lower bounds for assessing solution quality and supporting global optimization, although their effectiveness depends strongly on relaxation strength. This paper proposes an offline convexification and bound tightening framework for constructing strong linear programming (LP) relaxations for families of related ACOPF instances. Rather than repeating the tightening procedure for each instance, we compute variable bounds and second-order cone outer-approximation (SOC-OA) cuts offline using a demand-slack model and reuse them for subsequent instances with the same topology and admissible demand variations. Computational results on PGLib instances show that the fully offline approach achieves an average gap of $4.32\%$, compared with $3.80\%$ for the fully online approach, while achieving an average speedup of approximately $272\times$. The results demonstrate that offline convexification and bound tightening can recover most of the relaxation improvement of online tightening while significantly reducing the computational burden for repeated ACOPF evaluations.

0.32

Machine learning-guided real-time AC optimal transmission switching

eess.SY ·2026-10-28 ·Weimin Huang, Weiwei Yang, Bistra Dilkina, Konstantina Mellou, Ishai Menache +3 more
benchmark similarity 0.52
Abstract

The operation of power grids has substantial economic consequences, affecting generation costs and, ultimately, electricity prices. The Optimal Transmission Switching (OTS) problem seeks to reduce these costs by selectively switching off transmission lines. However, OTS gives rise to a challenging mixed-integer nonlinear optimization problem that is difficult to solve at operationally relevant timescales, particularly as rapidly changing loads create a need for real-time switching decisions. To address this challenge, we develop a machine learning-guided method that identifies high quality line switching decisions in real time. Specifically, we construct a grid-specific switching-value model that rapidly estimates the generation-cost reduction associated with opening transmission lines by fine-tuning a pretrained model for AC optimal power flow (AC-OPF). The switching-value model provides signals to guide promising switching decisions, and topologies proposed by the model are evaluated using exact AC-OPF solvers to verify feasibility and obtain the actual generation cost. We develop multiple strategies that use the ML surrogate to efficiently explore the combinatorial space of transmission topologies, including Fixed-Rank Search, Adaptive-Rank Search, and Swap-Enhanced Search. Across multiple benchmark networks, our proposed algorithms identify line switching decisions that significantly reduce generation cost within a 50s computational budget. In particular, under a realistic data center buildout scenario on the 2,000-bus synthetic Texas grid, our approach reduces generation costs by 31.97% and gross nodal load payments by 94.34%. More broadly, our results demonstrate that a fine-tuned surrogate can effectively guide search even without guaranteeing feasibility, enabling classical optimization methods to tackle large nonlinear combinatorial problems on operationally relevant timescales.

0.26

Unlocking AI Data Center Interconnection Capacity Through Coordinated Grid and Data Center Flexibility

eess.SY ·2026-10-04 ·Rida Fatima, Xingpeng Li
similarity 0.52
Abstract

The rapid growth of AI data centers is creating concentrated electricity demands that can exceed available distribution network headroom and delay interconnection. This paper investigates whether capacity can be used effectively by coordinating flexibility on both sides of the interconnection. A day-ahead mixed integer second order cone programming framework maximizes feasible AI data center IT capacity using utility side conservation voltage reduction and network topology reconfiguration, together with data center workload shifting and reserve constrained uninterruptible power supply storage. Background feeder demand uses voltage dependent ZIP models, while the data center is modeled as constant power demand using Training, Inference, and Mixed workload profiles. A two-stage solution first maximizes interconnection capacity and then minimizes feeder losses for the retained capacity, with numerical relaxation screening. Studies on a 116-bus model derived from the IEEE 123-node feeder show that, at the constrained bus-60 connection point, grid side flexibility, driven almost entirely by network reconfiguration, increases feasible IT capacity by approximately 42.5-45.0%, while data center flexibility alone provides approximately 2.1-5.4% gains. Coordinated operation increases feasible IT capacity from approximately 10.5-10.6 MW under BASE operation to 15.3-16.0 MW, corresponding to gains of approximately 45.9-50.8%; the 16.0 MW Inference result is limited by the adopted UPS reserve requirement. Benefits are strongly location dependent and influenced by workload flexibility, deferral duration, PUE, UPS energy and reserve requirements, and feeder loading. Under a combined adverse operating condition, FULL capacity decreases by only 3.4% relative to the nominal Mixed case while retaining substantial additional capacity over BASE.

0.29