Impact of Security Modeling Fidelity on Hyperscale Data Center Hosting Capacity Assessment

Haoxiang Wan, Linhan Fang, Jonghwan Kwon, Jesus Silva-Rodriguez, Jianyi Yang, Jaya Yellajosula, Fan Jiang, Xingpeng Li

eess.SY ·submitted 2026-10-13 13:50 UTC · v1
published

Abstract

This paper assesses hyperscale data center hosting capacity in transmission grids. Hosting capacity (HC) analysis quantifies the maximum additional load a bus can accommodate without violating operational constraints. This paper defines data center HC as the maximum time-invariant active power demand at a single target bus over a 24-hour peak-day horizon, and evaluates it under four models of increasing fidelity (i.e., the extent to which the model enforces real-world operational security requirements) on the modified IEEE 24-bus system: (i) DC optimal power flow (DC-OPF) without unit commitment (UC), (ii) basic SCUC (security-constrained unit commitment) without reliability constraints, (iii) SCUC with spinning reserve, and (iv) N-SCUC with both reserve and branch-contingency security. Comparing these models quantifies the impact of unit commitment, reserve requirements, and N-1 security on bus-level HC estimates. The N-SCUC yields an average HC of 444 MW; omitting N-1 security raises this to 532 MW, a 19.8% overestimation. The DC-OPF and basic SCUC models further overestimate HC, indicating a trade-off between model complexity and estimation accuracy.

Comment
5 pages, 2 figures, 1 table. Accepted to the 2027 IEEE PES Grid Edge Technologies Conference & Exposition

Closest papers

Nearest neighbours by meaning across the whole index.

Assessing Data Center Hosting Capacity Considering Electromagnetic Transient Dynamics

eess.SY ·2026-11-11 ·Fan Jiang, Xingpeng Li
hot direction similarity 0.69
Abstract

Hosting capacity is commonly assessed with steady-state optimization, which leaves the dynamic response of the data center and the grid at the resulting operating point untested. This paper assesses candidate data center capacities by coupling a unit commitment (UC) model with electromagnetic transient (EMT) simulation. During the capacity search, the UC model determines the economic dispatch for each tested data center capacity, and the resulting operating points are tested for settling with the generators committed online by the UC model and after a selected synchronous generator outage. Three nested capacities are obtained: the optimization-based steady-state capacity, the dynamic pre-outage capacity, and the post-outage dynamic capacity, each bounded by the previous one. On a test system with a detailed data center model, both dynamic capacities fall well below the optimization capacity, and the ranking of connection locations changes with the assessment stage and with the outage. In the most severe outage case at each candidate bus, the capacity is about 30% below the steady-state capacity. Thus, the dynamic response of the data center and the grid should be part of the hosting capacity assessment, and the comparison of connection locations should be made on the post-outage dynamic capacity.

0.34

AC Assessment of DC Power Flow Screening for Data Center Hosting Capacity and Siting

eess.SY ·2026-11-14 ·Haoxiang Wan, Jesus Silva-Rodriguez, Jonghwan Kwon, Xingpeng Li
hot direction similarity 0.68
Abstract · 5 pages, 5 figures, 1 table. Submitted to the 2027 IEEE PES General Meeting

A screening procedure based on direct current (DC) power flow estimates the data center hosting capacity of a candidate bus, termed the DC-screened capacity, and selects the generator commitment that supports it. This paper assesses that estimate under the alternating current (AC) network model. With the selected commitment fixed, an AC optimal power flow reoptimizes dispatch and voltages to find the largest data center load the bus can carry, termed the AC-assessed capacity. On a synthetic Texas system with 123 buses, the DC-screened capacity exceeds the AC-assessed capacity at 113 buses. Across all 123, the ratio of DC-screened to AC-assessed capacity has a median of 143% (a 43% overestimate) and a maximum of 1,070%. At these 113 buses, the DC-screened capacity violates a branch apparent power limit or a generator reactive power limit in the AC model, two limits the DC model omits. The overestimate changes decisions: a 1-GW project passes DC screening at every bus but exceeds the AC-assessed capacity at 37, and the bus ranked first by DC screening has 205.5 MW less AC-assessed capacity than the bus ranked second. Reporting the AC-assessed capacity beside each DC-screened capacity lets planners reject oversized projects or choose better sites.

0.39

Unlocking AI Data Center Interconnection Capacity Through Coordinated Grid and Data Center Flexibility

eess.SY ·2026-10-04 ·Rida Fatima, Xingpeng Li
similarity 0.64
Abstract

The rapid growth of AI data centers is creating concentrated electricity demands that can exceed available distribution network headroom and delay interconnection. This paper investigates whether capacity can be used effectively by coordinating flexibility on both sides of the interconnection. A day-ahead mixed integer second order cone programming framework maximizes feasible AI data center IT capacity using utility side conservation voltage reduction and network topology reconfiguration, together with data center workload shifting and reserve constrained uninterruptible power supply storage. Background feeder demand uses voltage dependent ZIP models, while the data center is modeled as constant power demand using Training, Inference, and Mixed workload profiles. A two-stage solution first maximizes interconnection capacity and then minimizes feeder losses for the retained capacity, with numerical relaxation screening. Studies on a 116-bus model derived from the IEEE 123-node feeder show that, at the constrained bus-60 connection point, grid side flexibility, driven almost entirely by network reconfiguration, increases feasible IT capacity by approximately 42.5-45.0%, while data center flexibility alone provides approximately 2.1-5.4% gains. Coordinated operation increases feasible IT capacity from approximately 10.5-10.6 MW under BASE operation to 15.3-16.0 MW, corresponding to gains of approximately 45.9-50.8%; the 16.0 MW Inference result is limited by the adopted UPS reserve requirement. Benefits are strongly location dependent and influenced by workload flexibility, deferral duration, PUE, UPS energy and reserve requirements, and feeder loading. Under a combined adverse operating condition, FULL capacity decreases by only 3.4% relative to the nominal Mixed case while retaining substantial additional capacity over BASE.

0.08

Impact of Data Center Load on Co-Optimized Generation and Transmission Expansion Planning with Embedded Unit Commitment

eess.SY ·2026-10-13 ·Haoxiang Wan, Xingpeng Li, Jonghwan Kwon
published similarity 0.64
Abstract · 6 pages, 2 figures, 3 tables. Accepted to the 2027 IEEE Texas Power and Energy Conference (TPEC)

The rapid growth of hyperscale data centers challenges grid expansion planning, yet existing studies focus largely on operational flexibility rather than long-term investment decisions. This paper examines how large data center loads sited at multiple buses affect co-optimized Transmission Expansion Planning (TEP) and Generation Expansion Planning (GEP). The problem is formulated as a multi-year, Unit Commitment (UC)-embedded mixed-integer linear program on the modified IEEE 24-bus Reliability Test System (RTS-24) with Electric Reliability Council of Texas (ERCOT)-calibrated renewable energy profiles. A 500 MW data center load, about 17.5% of the base-year peak, is allocated across four buses by voltage level, generation headroom, renewable co-location, and network connectivity. Integrating this load raises the 15-year net present value of total system cost by 1,794 million USD (+61.6%) and the system-average locational marginal price (LMP) by 45.2%, with operating cost dominating capital investment (84.2% versus 15.8%). Renewable curtailment remains negligible: existing renewables are already near full utilization, so the added demand is served almost entirely by incremental thermal generation. Most notably, the load shifts the optimal plan from transmission-only to generation-only, replacing the base-case 230 kV reinforcement with a new 400 MW combined-cycle gas turbine and showing that strategically sited generation can substitute for network reinforcement.

0.27

Service-Aware Hosting Capacity Assessment of Edge Data Centers with Workload Flexibility

eess.SY ·2026-10-13 ·Linhan Fang, Haoxiang Wan, Anurag Srivastava, Xingpeng Li
similarity 0.64
Abstract

The growing demand for edge computing, content delivery, and AI services is driving the interconnection of edge data centers (DCs) with distribution networks. Before interconnection, utilities evaluate how much DC capacity can be accommodated without violating feeder current and voltage limits. Fixed peak load representations can overlook service dependent demand patterns, cooling related facility demand, and delay tolerant computing tasks. This paper develops a hosting capacity (HC) assessment model for edge DCs with shiftable workload scheduling. Three representative types are considered: mobile edge computing (MEC), content delivery network (CDN), and AI DCs. Facility demand is modeled by combining fixed base demand, service driven demand, prescribed cooling-overhead coefficient, and a shiftable workload component. Workload execution is optimized under arrival causality, maximum delay, daily energy balance constraints, and the resulting active and reactive loads are embedded in a distribution power flow model. Compared with the baseline without load shifting, the maximum bus level HC gain on the IEEE 33-bus system reaches 4.46% for MEC DCs and 9.89% for AI DCs, while CDN case shows negligible gain under the assumed cache management windows.

0.28

Data Center Load Accommodation under QoS and Checkpoint-Induced Frequency Security Constraints

eess.SY ·2026-10-16 ·Ruolan Cui, Ziang Liu, Chenxi Hu, Francis Yunhe Hou
benchmark similarity 0.63
Abstract · 10 pages

The rapid growth of artificial intelligence workloads is accelerating the expansion and grid interconnection of data centers (DCs). Existing data center load accommodation (DCLA) assessments primarily focus on grid and resource adequacy and often imply that greater workload flexibility always increases accommodable capacity. However, workload flexibility has a dual effect. Workload deferral and temporal shifting can alleviate network congestion, whereas synchronized checkpointing of training workloads can cause large and rapid load reductions, threatening frequency stability. Therefore, DCLA cannot be determined solely by grid adequacy. This paper develops an optimal DCLA method that jointly accounts for workload quality of service (QoS), checkpoint-induced frequency security (FS), and grid adequacy. First, a QoS-aware model characterizes workload-dependent flexibility while ensuring service feasibility. Second, checkpoint-induced FS constraints are developed for periodic and event-triggered power variations, with key frequency-security limits reformulated in algebraic form. Third, a two-stage lexicographic model is developed to maximize DCLA and minimizes the required energy storage (ES) deployment, and then optimizes system operation under the given DC and ES siting and sizing decisions. Case studies show that the proposed method avoids a 40.3% overestimation of DCLA compared with the grid-adequacy benchmark. QoS is the primary limiting factor, while checkpoint-induced frequency-security constraints become more restrictive as training workloads increase. These findings highlight that reliable DCLA should account for both its grid-support value and the associated QoS and FS risks.

0.16

Frequency-Security-Aware Real-Time Economic Dispatch with Data Center UPS Flexibility for Inertia and Primary Frequency Response Services

eess.SY ·2026-11-13 ·Shengyi Wang, Liang Du
hot direction similarity 0.61
Abstract

The increasing penetration of renewable energy and the rapid growth of AI data centers are introducing significant challenges to power system frequency security. There is an urgent need to identify grid-compatible resources capable of providing fast frequency support. This paper proposes a frequency-security-aware real-time economic dispatch (RTED) model that enables data center (DC) uninterruptible power supply (UPS) systems to provide steady-state power balancing, inertia response, and primary frequency response (PFR) services. Specifically, tractable analytical frequency-security constraints are derived and incorporated into the RTED framework through second-order cone programming (SOCP) formulation. The proposed model jointly optimizes energy, reserve, and inertia to minimize system operation cost while preventing under-frequency load shedding (UFLS). Numerical validation on a modified IEEE 39-bus system demonstrates that the proposed RTED model with UPS flexibility can economically support system operation and significantly improve frequency security under active-power deficit disturbances.

0.39

Minimizing Grid Interconnection Capacity Requirements for AI Data Centers: A Developer-Side Planning Framework with Onsite Resources and Workload Flexibility

eess.SY ·2026-08-29 ·Hassan Zahid Butt, Rida Fatima, Xingpeng Li
similarity 0.60
Abstract

Securing grid interconnection capacity has become a bottleneck for AI data center projects and can take longer than constructing the facilities themselves. This mismatch can delay deployment for years, making early interconnection planning essential. This paper develops ICP-AI, an interconnection capacity planning framework from a data center developer's perspective. The framework minimizes grid import capacity under a prescribed onsite investment budget while jointly sizing photovoltaic (PV) and battery energy storage system (BESS) resources and scheduling deadline constrained workload flexibility. A secondary refinement fixes the minimum grid capacity and selects the minimum-investment PV-BESS portfolio among solutions that achieve that capacity. The framework is evaluated using monthly composite stress profiles across varying temporal assumptions, load shapes, flexible load fractions, and deferral windows. Results show that interconnection capacity reduction depends strongly on the planning environment: at a $100M budget, it is about 6% for the high load factor baseline, exceeds 10% under monthly average solar availability, and reaches 13.3% for a more diurnal load. At a $10M budget, 5% flexible load with a 1 h workload deferral window reduces BESS capacity from 15.30 to 4.87 MWh while increasing capacity reduction from 4.43% to 4.84%. To test sensitivity to temporal compression, the model is also solved over the full 8,760 h chronology, which preserves the main capacity and flexibility trends. Overall, ICP-AI quantifies the interconnection capacity and infrastructure substitution value of workload flexibility, providing an investment-interconnection frontier to support capital allocation and early project planning in constrained grid environments.

0.12