Assessing Data Center Hosting Capacity Considering Electromagnetic Transient Dynamics

Fan Jiang, Xingpeng Li

eess.SY ·submitted 2026-11-11 16:43 UTC · v1
hot direction

Abstract

Hosting capacity is commonly assessed with steady-state optimization, which leaves the dynamic response of the data center and the grid at the resulting operating point untested. This paper assesses candidate data center capacities by coupling a unit commitment (UC) model with electromagnetic transient (EMT) simulation. During the capacity search, the UC model determines the economic dispatch for each tested data center capacity, and the resulting operating points are tested for settling with the generators committed online by the UC model and after a selected synchronous generator outage. Three nested capacities are obtained: the optimization-based steady-state capacity, the dynamic pre-outage capacity, and the post-outage dynamic capacity, each bounded by the previous one. On a test system with a detailed data center model, both dynamic capacities fall well below the optimization capacity, and the ranking of connection locations changes with the assessment stage and with the outage. In the most severe outage case at each candidate bus, the capacity is about 30% below the steady-state capacity. Thus, the dynamic response of the data center and the grid should be part of the hosting capacity assessment, and the comparison of connection locations should be made on the post-outage dynamic capacity.

Closest papers

Nearest neighbours by meaning across the whole index.

Impact of Security Modeling Fidelity on Hyperscale Data Center Hosting Capacity Assessment

eess.SY ·2026-10-13 ·Haoxiang Wan, Linhan Fang, Jonghwan Kwon, Jesus Silva-Rodriguez, Jianyi Yang +3 more
published similarity 0.69
Abstract · 5 pages, 2 figures, 1 table. Accepted to the 2027 IEEE PES Grid Edge Technologies Conference & Exposition

This paper assesses hyperscale data center hosting capacity in transmission grids. Hosting capacity (HC) analysis quantifies the maximum additional load a bus can accommodate without violating operational constraints. This paper defines data center HC as the maximum time-invariant active power demand at a single target bus over a 24-hour peak-day horizon, and evaluates it under four models of increasing fidelity (i.e., the extent to which the model enforces real-world operational security requirements) on the modified IEEE 24-bus system: (i) DC optimal power flow (DC-OPF) without unit commitment (UC), (ii) basic SCUC (security-constrained unit commitment) without reliability constraints, (iii) SCUC with spinning reserve, and (iv) N-SCUC with both reserve and branch-contingency security. Comparing these models quantifies the impact of unit commitment, reserve requirements, and N-1 security on bus-level HC estimates. The N-SCUC yields an average HC of 444 MW; omitting N-1 security raises this to 532 MW, a 19.8% overestimation. The DC-OPF and basic SCUC models further overestimate HC, indicating a trade-off between model complexity and estimation accuracy.

0.60

Impact of Data Center Load on Co-Optimized Generation and Transmission Expansion Planning with Embedded Unit Commitment

eess.SY ·2026-10-13 ·Haoxiang Wan, Xingpeng Li, Jonghwan Kwon
published similarity 0.68
Abstract · 6 pages, 2 figures, 3 tables. Accepted to the 2027 IEEE Texas Power and Energy Conference (TPEC)

The rapid growth of hyperscale data centers challenges grid expansion planning, yet existing studies focus largely on operational flexibility rather than long-term investment decisions. This paper examines how large data center loads sited at multiple buses affect co-optimized Transmission Expansion Planning (TEP) and Generation Expansion Planning (GEP). The problem is formulated as a multi-year, Unit Commitment (UC)-embedded mixed-integer linear program on the modified IEEE 24-bus Reliability Test System (RTS-24) with Electric Reliability Council of Texas (ERCOT)-calibrated renewable energy profiles. A 500 MW data center load, about 17.5% of the base-year peak, is allocated across four buses by voltage level, generation headroom, renewable co-location, and network connectivity. Integrating this load raises the 15-year net present value of total system cost by 1,794 million USD (+61.6%) and the system-average locational marginal price (LMP) by 45.2%, with operating cost dominating capital investment (84.2% versus 15.8%). Renewable curtailment remains negligible: existing renewables are already near full utilization, so the added demand is served almost entirely by incremental thermal generation. Most notably, the load shifts the optimal plan from transmission-only to generation-only, replacing the base-case 230 kV reinforcement with a new 400 MW combined-cycle gas turbine and showing that strategically sited generation can substitute for network reinforcement.

0.47

Unlocking AI Data Center Interconnection Capacity Through Coordinated Grid and Data Center Flexibility

eess.SY ·2026-10-04 ·Rida Fatima, Xingpeng Li
similarity 0.66
Abstract

The rapid growth of AI data centers is creating concentrated electricity demands that can exceed available distribution network headroom and delay interconnection. This paper investigates whether capacity can be used effectively by coordinating flexibility on both sides of the interconnection. A day-ahead mixed integer second order cone programming framework maximizes feasible AI data center IT capacity using utility side conservation voltage reduction and network topology reconfiguration, together with data center workload shifting and reserve constrained uninterruptible power supply storage. Background feeder demand uses voltage dependent ZIP models, while the data center is modeled as constant power demand using Training, Inference, and Mixed workload profiles. A two-stage solution first maximizes interconnection capacity and then minimizes feeder losses for the retained capacity, with numerical relaxation screening. Studies on a 116-bus model derived from the IEEE 123-node feeder show that, at the constrained bus-60 connection point, grid side flexibility, driven almost entirely by network reconfiguration, increases feasible IT capacity by approximately 42.5-45.0%, while data center flexibility alone provides approximately 2.1-5.4% gains. Coordinated operation increases feasible IT capacity from approximately 10.5-10.6 MW under BASE operation to 15.3-16.0 MW, corresponding to gains of approximately 45.9-50.8%; the 16.0 MW Inference result is limited by the adopted UPS reserve requirement. Benefits are strongly location dependent and influenced by workload flexibility, deferral duration, PUE, UPS energy and reserve requirements, and feeder loading. Under a combined adverse operating condition, FULL capacity decreases by only 3.4% relative to the nominal Mixed case while retaining substantial additional capacity over BASE.

0.28

Quantifying the hosting capacity value of workload flexibility for AI data centers: A two-stage electricity-computation co-optimization framework

eess.SY ·2026-11-18 ·Jiakai Wu, Wei Sun, Pengyu Ren, Yifan Wang
hot direction similarity 0.65
Abstract

Grid connection constraints increasingly limit the expansion of AI data centers, yet the additional hosting capacity enabled by computational workload flexibility remains insufficiently quantified. This paper develops a two-stage electricity--computation co-optimization framework to quantify the individual and coordinated hosting capacity values of spatial and temporal workload flexibility. Data center capacities are determined endogenously, with computational task arrivals scaling with admitted capacity. Spatial routing of eligible interactive requests and temporal deferral of batch workloads are linked to server operation and facility power demand, subject to workload completion requirements and transmission constraints. The first stage maximizes aggregate hosting capacity; the second fixes the resulting site capacities and optimizes annual workload scheduling and generation dispatch to minimize generation and carbon costs. An 8760-hour case study with three data centers on a modified IEEE 118-bus system shows that temporal and spatial flexibility individually increase hosting capacity by 21.26\% and 5.37\%, respectively. Their coordinated use raises hosting capacity from 4635.1~MW to 6231.5~MW, a 34.44\% increase without network reinforcement. The coordinated gain exceeds the sum of the individual gains by 361.9~MW, demonstrating complementarity between spatial migration and temporal deferral. By redistributing computational demand across locations and operating hours, these mechanisms enable fuller utilization of existing transmission capacity. The findings establish workload flexibility as a quantifiable planning resource for accommodating additional data center capacity within existing transmission networks.

0.28

Modeling and Stability of Power Systems With Coupled Data Center and Grid Dynamics

eess.SY ·2026-11-17 ·Guido Cavraro
similarity 0.63
Abstract

The growing deployment of data centers poses challenges for power-system operation. However, data centers possess flexible resources that can be leveraged to mitigate their impact on the grid and provide grid services. This paper develops a linear-affine dynamic model of a transmission network with multiple data centers, explicitly coupling electromechanical grid dynamics with data center power demand and computational backlog. Grid-aware computing policies are incorporated to represent how data centers adjust their computational power in response to grid frequency deviations and workload backlog. The proposed framework provides a tractable means of investigating the interactions between multiple data centers and the transmission grid and assessing the potential of flexible computing to support power-system stability.

0.22

U.S. Data Center Growth Through 2030: A Critical Review of Grid Adequacy and Transmission Expansion Planning

eess.SY ·2026-11-10 ·Babak Porkar, Mona Ghassemi
hot direction similarity 0.62
Abstract

The growth of large data centers raises questions about both supply adequacy and the suitability of load representations used in connection studies. This paper critically reviews the U.S. demand, generation, and transmission outlook through 2030 and examines the implications for transmission expansion planning (TEP). Comparison of public forecasts highlights distinctions among annual average demand, peak demand, and grid connection capacity. National generating-capacity totals cannot establish a dependable surplus because resource availability, regional adequacy, transmission constraints, and project timing determine supply capability. Recent grid events and published dynamic studies demonstrate that faults can trigger substantial data-center transfers to backup supply, followed by delayed or coordinated demand recovery. These behaviors require appropriate representation within the conventional planning framework, alongside assessment of the requested maximum grid import. The selected literature reveals limited integration of validated data-center dynamic models into the technical screening and economic comparison of expansion alternatives. The review identifies the need to establish whether fault response and recovery change feasible connection capacity, required reinforcement, or the preferred transmission investment.

0.28

Hosting Capacity Assessment of Data Centers with Voltage Ride-Through Capability in Power Systems

eess.SY ·2026-09-02 ·Pengyu Ren, Wei Sun, Fei Teng
similarity 0.62
Abstract

Large data centers are emerging as concentrated, power-electronic grid loads whose abrupt disconnection or transfer to on-site backup supply during voltage disturbances can remove large demand from the power system, and may create a system-level stability problem. Their interconnection feasibility therefore depends not only on steady-state thermal and voltage limits, but also on whether internal power-conditioning systems can maintain IT service while limiting customer-initiated load reduction. This paper presents a voltage ride-through (VRT)-aware data center and grid co-planning framework that couples transmission-level fault simulation with an internal data center ride-through model. Python-based dynamic simulations generate point-of-interconnection (POI) voltage trajectories under selected network faults, and the resulting waveforms drive an internal model incorporating IT and cooling-load dynamics, DC-link, Uninterruptible Power Supply (UPS) response, and converter apparent power limits. The IEEE 118-bus case study shows that internal VRT capability can become a binding interconnection constraint: steady-state planning alone can overestimate feasible data center capacity, whereas increased UPS converter headroom progressively restores hosting capacity. Under the reduced-order response models studied, the grid-forming mode provides greater ride-through margin than the current-limited grid-following mode under the same network fault conditions. The results further show that VRT constraints can materially change both the total hosting capacity of data centers and its spatial allocation across candidate interconnection buses.

0.16

Reliability-based Sizing of Energy Storage for Large Load Integration

eess.SY ·2026-11-18 ·Atri Bera, Chandan Chaudhary, Dilip Pandit, Cody J. Newlun, Tu A. Nguyen +2 more
published similarity 0.62
Abstract · 12 pages, 1 figure, published as part of the proceedings of the 2026 Grid of the Future Symposium organized by the CIGRE US National Committ…

The number of large loads connected to the bulk power system has been increasing rapidly worldwide. Emerging high-demand facilities, particularly AI data centers, are introducing new challenges for power system planners. In absence of appropriate planning mechanisms, the addition of high volumes of data center loads will lead to an increase in outages, thus degrading reliability of the system. Energy storage systems (ESS) offer a promising solution to mitigate the reliability impacts of these large loads, due to their flexibility and fast-ramping characteristics. However, ESS should be judiciously sized and sited to maximize the reliability benefits to the grid. This paper presents a framework for the optimal sizing and siting of ESS to minimize the adverse reliability impacts of large load additions. First, a stochastic semi-Markov model is developed to model the load of AI data centers and generate profiles for several such facilities. These profiles are then incorporated into a Markov-chain Monte Carlo simulation-based composite system reliability assessment framework. A detailed nodal network model is used to quantify the reliability impacts of adding data centers and to identify buses most affected by large loads. Resource adequacy metrics are used to evaluate the overall system reliability impacts. ESS are then strategically sized and sited based on this analysis to mitigate the negative impacts of large loads on overall system reliability. The proposed framework is demonstrated using the RTS-GMLC 72-bus test system. The results show how ESS can effectively enhance system reliability in the presence of rapidly growing large-load demand. This framework provides system planners, utilities, and regulators with a practical tool for maintaining reliable power system operation using energy storage as more large loads are integrated into the grid.

0.46