Market Efficiency and Capacity Investment under Flexible Price-Making Loads: A Computational Study

Aron Brenner, Deepjyoti Deka, Saurabh Amin

eess.SY ·submitted 2026-10-30 03:18 UTC · v1

Abstract

Large flexible loads such as data centers can shift consumption across locations and hours to lower their bills. We model a price-making consumer leading the system operator in a Stackelberg game and compare its shifts with a cost-minimizing planner's over a simulated RTS-GMLC year. Strategic temporal and spatial shifting capture 75% and 93% of the planner's savings, forgoing the rest mostly by withholding flexibility to protect favorable prices. Scarce capacity and abundant renewables raise this share for temporal shifting; scarce transmission lowers it for spatial shifting. Temporal and spatial flexibility substitute for thermal and transmission capacity, respectively, and complement renewables.

Closest papers

Nearest neighbours by meaning across the whole index.

Shift or curtail? How much data-center flexibility is worth depends on the host power grid

eess.SY physics.soc-ph ·2026-08-20 ·Saroj Khanal, Geon Roh, Boyu Yao, Abraham Silverman, Dennice Gayme +3 more
similarity 0.64
Abstract · Submitted to Nature Energy

Data-center growth risks overbuilding power grid infrastructure and stranding capital. Flexible data-center operation can defer infrastructure investments, but its value depends on the flexibility mechanism and the host power grid characteristics. We classify data-center load as firm, flexible or interruptible, and embed them in capacity expansion applied to market-organized, fossil-heavy PJM and carbon-capped, centrally coordinated Korea. In PJM, the flexibility value is spatial: shifting workloads between zones reduces system cost by 6% in 2028 and 19% in 2038, avoiding 4.4 GW and 8.9 GW of gas and nuclear generation. In Korea, it is temporal: shifting load into midday solar hours makes 0.5 GW of additional solar worth building in 2028 and avoids 1.2 GW of gas and 0.3 GW of batteries in 2038. In both, realistic event-shape limits diminish the value of curtailment. The results show that flexibility procurement and its value are driven by grid characteristics and policy objectives.

0.46

Extended Version: Storage-Based Strategic Manipulation of Constraint-Binding Patterns in Power Networks

eess.SY econ.GN ·2026-09-14 ·Mehdi Davoudi, Minghao Mou, Junjie Qin
similarity 0.63
Abstract · Extended version of our paper submitted to IEEE Transactions on Power Systems

This paper studies the strategic market participation of a monopolistic energy storage aggregator (ESA) in a day-ahead electricity market. The ESA coordinates geographically distributed storage units, submits a coordinated bid for its portfolio, and may hold financial transmission rights (FTRs). The system operator clears the market through a network-constrained, multi-period economic dispatch, determining generation and load schedules, nodal prices, energy-market payments, and FTR payoffs. We formulate the ESA--system-operator interaction as a Stackelberg game and characterize its equilibrium through a constraint-binding-pattern decomposition of the market-clearing problem. Beyond enabling equilibrium computation, the framework reveals how the ESA can increase its profit by strategically inducing or avoiding particular constraint-binding patterns. It also establishes a novel welfare result: although strategic storage without FTRs is known to weakly improve social welfare relative to the no-storage case, certain FTR positions can overturn this guarantee by strengthening the ESA's incentive to induce particular patterns, causing social welfare to fall below the no-storage level. Motivated by these findings, we develop two system-operator mechanisms for limiting undesirable ESA behavior and its adverse effects on market outcomes and social welfare. Finally, a three-bus study illustrates the theoretical findings, while IEEE test systems demonstrate the scalability of the proposed method.

0.18

Strategic Arbitrage in Electricity Markets: A Multi-Agent Policy Optimization Framework

eess.SY ·2026-10-21 ·Eli Brock, Srikar Babu Gadipudi, Somayeh Sojoudi, Javad Lavaei
publishedbenchmark similarity 0.60
Abstract · Accepted to the 65th IEEE Conference on Decision and Control (CDC 2026). 8 pages, 6 figures

Grid-scale storage and load aggregators are growing quickly in wholesale electricity markets. If highly consolidated, these new participants may distort the competitive market equilibrium through strategic withholding behavior. Traditional market power mitigation techniques are ill-suited to arbitrage-based participants. We provide a multi-agent policy optimization model to study game-theoretic equilibria for real-time markets with consolidated storage and/or aggregators. The model is designed to facilitate natural first-order equilibrium-seeking update rules. We analyze the theoretical properties of different supply functions and their implications on the convergence of the gradient dynamics. Finally, we train equilibrium policies for a modified version of the IEEE RTS-GMLC benchmark across different levels of storage fleet consolidation, to demonstrate the potential of the framework as a tool to characterize and quantify strategic arbitrage.

0.33

Locational Marginal Pricing of Compute: Co-optimizing Compute and Energy for Transparent Data Center Flexibility

eess.SY cs.AI ·2026-11-15 ·Vladimir Pyltsov, Teng Zeng
similarity 0.60
Abstract

Demand from data centers and AI compute is growing rapidly and is increasing stress on the power grid. This load could be flexible through user adjustments and provide relief during energy scarcity events, yet today its flexibility is provided through utility call-ups or system-operator load shedding, and is invisible to the users whose workloads are being curtailed. In this work, we propose to quantify and couple the prices of compute and energy in a single optimization problem. The resulting compute price reflects the marginal cost of the binding constraints and decomposes into components indicating which grid, power, hardware, or service requirement causes a price surge. The economic interpretation updates the price with real-time conditions and gives users a signal for potential flexibility provision. The co-optimization ultimately connects compute and energy markets while providing a signal for relief of stress on both the grid and the compute resources.

0.32

Scarcity Pricing for State-of-Charge Management in Real-Time Markets Under Intra-Day Uncertainty

eess.SY ·2026-11-09 ·Shailesh Wasti, Aravind Retna Kumar, Sushant Varghese, Anthony Giacomoni, Parviz Alivand +2 more
similarity 0.59
Abstract

The growth in renewable resources will increase net load variability and forecast error. Energy storage resources can provide flexibility when ramp capability is limited and contribute to load leveling over the day. The challenge for system operators is how to balance these two functions in real time, when updated net load forecasts are available for a limited lookahead horizon. U.S. electricity markets are seeking ways to manage state-of-charge (SoC) within their energy markets to more efficiently utilize these resources. We propose a method to manage energy storage SoC in a real-time market by extending Hogan's (2013) scarcity pricing framework. A day-ahead SoC schedule is modified using existing multi-interval real-time unit commitment engines as net load forecasts change. To address 30-minute-ahead forecast errors, an updated 5-minute SoC target and a dynamically updated shortage price for violating the constraint are provided to each economic dispatch. We simulate PJM's energy markets for 365 days and demonstrate reliability improvements relative to a strategy that enforces the day-ahead schedule. We show cost reductions and improved price formation relative to a strategy that updates target quantities but uses an administratively chosen shortage penalty.

0.30

Robust Procurement Planning for Community Choice Aggregators: Managing Market Price Uncertainty

eess.SY ·2026-10-20 ·Manar Jaradat, James Himelic, Neha Patankar
code/data similarity 0.59
Abstract

Community Choice Aggregators (CCAs) play an important role in the energy transition by procuring renewable electricity for local communities while balancing affordability, resource adequacy, and clean-energy requirements. In California, these long-term procurement decisions are coordinated through integrated resource planning (IRP). However, conventional IRP frameworks typically represent wholesale electricity prices deterministically, even though price uncertainty can expose CCAs to substantial financial risk by affecting the cost of market imports and, particularly, the value of export opportunities. This paper develops a robust optimization framework for CCA resource procurement that hedges against uncertainty in wholesale import and export prices. We extend the open-source GenX capacity expansion model with a budgeted robust optimization formulation that protects procurement decisions against adverse price realizations while remaining computationally tractable for large-scale, multistage planning studies. Using data from a California CCA, we show that market price uncertainty can materially change optimal procurement strategies. Rather than aggressively expanding renewable capacity based on expected export revenues, robust portfolios reduce dependence on uncertain market revenues, leading to more conservative renewable investments and less reliance on market exports. We demonstrate that moderate uncertainty budgets provide most of the risk-reduction benefits of robust planning at limited additional cost, whereas higher robustness levels yield diminishing benefits as portfolio conservatism increases. These findings provide guidance for selecting uncertainty budgets in IRP studies and demonstrate how robust optimization can support affordable and resilient procurement decisions as CCAs contribute to the transition toward low-carbon electricity systems.

0.40

AI for AI: Optimizing Additional Infrastructure Build-out to Power Artificial Intelligence Data Centers

cs.AI q-fin.GNecon.GN ·2026-09-08 ·Alexander Crosier, Kyle Onghai, Ronnie Sircar
similarity 0.59
Abstract

The twenty-first century's transformative technology, artificial intelligence, is increasingly constrained by the twentieth century's transformative technology, the electricity grid. Rapid growth in electricity demand from data centers is leading to higher electricity prices, without a compensating supply-side response. We develop a framework linking data-center load growth, available generation capacity, and market-clearing prices to understand this phenomenon. We first analyze a deterministic model to show how differing estimates of demand and supply growth rates affect prices. We then model the expansion of new data centers and their associated electricity demand, together with build-outs of new electricity supply, as stochastic processes,resulting in probabilistic distributions of supply, demand, and prices rather than a single forecast. Finally, we formulate generation expansion as a stochastic control problem in which a revenue-maximizing investor dynamically chooses the intensity of supply-side investments. The analysis highlights a central challenge of the data-center build-out: even when rapid demand growth increases the need for new generation, the uncertainties related to load forecasts, development execution risks, and value cannibalization from overbuilding capacity may weaken incentives to invest at the pace required to keep electricity prices stable.

0.22

Data-center growth impacts household electricity costs more through wholesale prices than through grid reinforcement

eess.SY econ.GN ·2026-11-11 ·Lingdong Zhou, Wenjia Xia, Jiyu Wang, Fei Ding, Xiangqi Zhu
hot direction similarity 0.59
Abstract · 22 pages, 8 figures, 1 table. Lingdong Zhou and Wenjia Xia contributed equally to this work

Rapid data-center expansion is raising concerns about electricity affordability, yet how the costs of serving these large new loads reach residential customers remains poorly understood. Here, we quantify the potential impact of 371 announced Texas data-center projects, totaling 38.9 GW by 2030, on residential electricity costs by linking power system expansion, wholesale electricity markets, transmission reinforcement, and retail cost allocation. We find that accommodating this demand increases modeled residential electricity costs in one representative case by 1.64 cents/kWh, with 68% arising from higher wholesale electricity prices and 32% from regulated transmission charges. Allowing new gas generation near data centers reduces the 2023 residential cost increase to 0.92 cents/kWh, whereas excluding data centers from the transmission cost-sharing base raises it to 1.87 cents/kWh. These findings reveal that the residential cost burden of data-center growth is driven primarily by wholesale electricity price increases, rather than direct transmission investment costs, and depends critically on generation siting, infrastructure planning, and cost allocation.

0.37