Compressing the Lawler-Moore Dynamic Program for Weighted Tardy Jobs

Klaus Jansen, Björn Schumacher, Corinna Wambsganz

cs.DS ·submitted 2026-10-30 14:41 UTC · v1

Abstract

The classic scheduling problem of minimizing the total weight of tardy jobs ($P_m||\sum_jw_jU_j$) asks for a schedule of jobs each with a processing time, weight, and due date on a constant number of parallel identical machines. A job is late in a schedule if it completes after its due date, and an optimal schedule is one where the total weight of all late jobs is minimized. The classic dynamic programming algorithm of Lawler and Moore [Manag. Sci., 1969] solves this problem in $O(nd_{\max}^m)$ where $n$ is the number of jobs, $d_{\max}$ is the maximum due date of any job, and $m$ is the number of identical machines. We show that it is sufficient to only compute part of the dynamic program and obtain the running time $\tilde{O}(n + d_{\max}^{m + 1})$ where $\tilde{O}$ suppresses polylogarithmic factors. This affirmatively answers the open question posed by Hermelin, Molter, and Shabtay [INFORMS J. Comput., 2024], whether a running time of $\tilde{O}(n + d_{\max}^2)$ is possible on a single machine.

Closest papers

Nearest neighbours by meaning across the whole index.

Asymmetric Weighted Earliness-Tardiness: Scheduling with a Nonrestrictive Common Due Date

cs.CC math.OCcs.DMmath.CO ·2026-09-12 ·Nicholas G. Hall, Hans Kellerer, Miao Song
similarity 0.64
Abstract · 268 pages, 12 figures, 29 tables

Single-machine asymmetric weighted earliness--tardiness (AWET) scheduling asks how to sequence jobs around a common synchronization date when early and late completion incur unrelated job-dependent penalties. At the boundary nonrestrictive date $d=\sum_jp_j$, a compact V-shaped schedule reduces the continuous-time problem to a quadratic choice of a nonempty early set. We establish four complementary results for this model. First, the positive-integer problem is strongly NP-complete by a unary-polynomial reduction from Restricted Exact Cover by 3-Sets. Second, unrestricted AWET admits a polynomial-time $(3+2\sqrt2+\varepsilon)$-approximation based on an anchored semidefinite relaxation and deterministic marginal thresholding. Third, when the earliness and tardiness ratio orders are strict reversals, the problem is weakly NP-complete but has an exact two-resource pseudopolynomial dynamic program. Fourth, for fixed total refinements whose ratio permutation is separable, an exact separating-tree recurrence and coordinated geometric trimming yield an FPTAS. The proofs use different manifestations of the same canonical objective: scale-separated prefix penalties, positive-semidefinite minimum-kernel covariance, a dominant completed load square, and a bounded four-coordinate decomposition interface. Together, the results show that the decisive issue is not merely whether the two ratio orders agree, but whether their interaction can be controlled by a global certificate or compressed into a bounded constructive interface.

0.21

Serial-batch scheduling to minimise the total weighted late work

cs.DS ·2026-09-16 ·Yao-Wen Sang, Naiming Xie, Jian Chen, Malgorzata Sterna, Jacek Blazewicz
similarity 0.63
Abstract

We study the problem of scheduling jobs on a serial-batch machine with the aim of minimising the total weighted late work. In a serial-batch setting, jobs within a batch are processed sequentially, and none are removed from the machine until the last job in the batch completes its processing. The processing time of a batch is the sum of the processing times of the jobs within it, and the completion time for each job in the batch is equal to the makespan of the jobs in the batch. When a new batch begins, a constant setup time is required for the machine. We show that minimising the total weighted late work in this environment is $NP$-hard even if all jobs have a common due date and unit weight. For the general problem, we present a pseudo-polynomial time dynamic programming algorithm. Additionally, we explore two special cases, i.e., one with a common due date and another with an agreeable condition among due dates, processing times and weights. For both special cases, we develop specialised pseudo-polynomial time dynamic programming algorithms. The proposed approaches are equipped with specialised acceleration techniques to enhance their computational performance. The extended experiments demonstrate that the dynamic programming algorithms outperform Gurobi in time efficiency.

0.13

Coordinating Boundaries: Improved Approximation Algorithms for Unweighted Non-Preemptive Throughput Maximization

cs.DS ·2026-10-26 ·Weitian Tong, Yao Xu
similarity 0.61
Abstract · 34 pages, 8 figures

We study unweighted nonpreemptive throughput maximization: given jobs with processing times, release times, and deadlines, schedule a maximum-cardinality subset on identical machines. For every fixed $\varepsilon>0$, we give randomized algorithms with expected approximation ratios $17/13+\varepsilon$ in polynomial time and $21/17+\varepsilon$ in pseudopolynomial time. These improve the respective $4/3+\varepsilon$ and $5/4+\varepsilon$ guarantees of Armbruster, Grandoni, Tinguely, and Wiese [STOC'26]. Both results hold for an arbitrary number of identical machines. Our algorithms build on their configuration-LP and matching framework, which partitions time into blocks. For a job whose window meets multiple blocks, its boundary blocks are the first and last such blocks. Crossing boundary pairs, whose endpoints strictly interleave, permit additional assignments to sampled execution slots, while a noncrossing family can be coordinated using consistent joint distributions on at most three blocks. The exchange analysis accounts for fractional job assignments that must be erased before inserting an additional job. For the pseudopolynomial implementation, we project configurations onto selected job identities and use separate configuration distributions with common placement marginals. This retains efficient pricing while enforcing the correlations needed for coordination.

0.15

Approximation algorithms for identical parallel machine scheduling with assignment costs

cs.DS ·2026-10-24 ·Wei Li
similarity 0.61
Abstract

We study non-preemptive scheduling on identical parallel machines in which assigning job $j$ to machine $M_i$ incurs the cost $c_{ij}=a_iw_j+b_j$. The processing times $p_j$ and the cost weights $w_j$ are independent, and the number of machines is part of the input. For every fixed $\varepsilon\in(0,1]$ and every deadline $T$ for which a schedule with makespan at most $T$ exists, we give a polynomial-time algorithm that computes a schedule with makespan at most $(1+\varepsilon)T$ whose total assignment cost does not exceed the minimum under the deadline $T$. Using this algorithm as a subroutine, we obtain a polynomial-time approximation scheme for minimizing the makespan under a total cost budget whose schedules always satisfy the budget; this answers an open question for costs $c_{ij}=l_ic_j$ with $c_j$ independent of $p_j$. For the lexicographic problem, in which the total assignment cost is minimized among all schedules of minimum makespan, we obtain in polynomial time a schedule with makespan at most $1+\varepsilon$ times the minimum and total assignment cost at most that of a lexicographically optimal schedule; this improves the makespan guarantees of earlier algorithms for additive and multiplicative costs. For costs $c_{ij}=s_i+a_iw_j$, where $s_i$ is charged for each job processed on $M_i$, the same guarantees are obtained in quasi-polynomial time.

0.24

A QPTAS for Stochastic Scheduling of Bernoulli Jobs

cs.DS cs.CCmath.OC ·2026-10-08 ·Junho Hwang
benchmark similarity 0.61
Abstract · 23 pages, 1 figure

We study the classical problem of scheduling jobs with random processing times on $m$ identical machines to minimize the expected sum of completion times, for Bernoulli jobs: job $j$ takes time $p_j$ with probability $q_j$ and time $0$ otherwise, and its outcome is revealed when it starts. The benchmark is an optimal adaptive policy. We give a quasi-polynomial-time approximation scheme for every number of machines. Previously, quasi-polynomial time was known to give an $O(\log N)$-approximation, and approximation schemes were known only for a constant number of distinct sizes. The scheme rests on a simple observation: it suffices to round the times at which machines become free, rather than the times at which jobs start, to a grid whose width is proportional to the job size, and an optimal policy stretched by a factor close to one already respects such grids. We also show that every policy that fixes the order of the jobs in advance loses a factor $Ω(\log N)$, already on two machines, so a constant factor requires adapting the order to the observed outcomes. Further results include a polynomial-time adaptive rule with ratio $\min\{m,1+\sum_j q_j\}$, a simpler approximation scheme for a constant number of sizes, and #P-hardness of computing the optimal expected cost on two machines.

0.25

Faster Exponential Algorithms for Multi-Machine Scheduling Problems

cs.DS ·2026-08-12 ·Anubhav Dhar, Anita Dürr, Ahmed Ghazy, Jakob Greilhuber, Karol Węgrzycki
published similarity 0.61
Abstract

Minimizing the weighted completion times ($P \mid \mid Σw_j C_j$) and weighted number of tardy jobs ($P \mid \mid Σw_j U_j$) on multiple identical machines are two classical NP-hard scheduling problems. As shown by Lenté et al. (2014), both problems can be solved in time ${O}^{\star}(3^n)$. In this paper, we improve these bounds to ${O}(2.755^n)$ and ${O}^{\star}(2^n)$, respectively. Our algorithm for $P \mid \mid Σw_j C_j$ exploits the meet-in-the-middle paradigm and an efficient data structure answering linear programming queries. Additionally, when the number of machines is at most $6$, we show that the running time for $P \mid \mid Σw_j C_j$ can further be improved. Both scheduling problems are generalizations of the classical Bin Packing problem, which can be solved in ${O}^{\star}(2^n)$ time. Improving this running time is an important open question. We show that, when assuming the Asymptotic Rank Conjecture (ARC), Bin Packing can be solved in time ${O}((2-\varepsilon)^n)$ for some $\varepsilon >0$. Our algorithm makes use of two main ingredients: the recent ${O}((2-\varepsilon)^n)$-time algorithm of Nederlof et al. [SICOMP'23] for Bin Packing when the number of bins is a fixed constant, and the ${O}((2-\varepsilon)^n)$-time algorithm of Björklund et al. [SODA'25] for special instances of the $3$-way Partitioning problem when assuming ARC.

0.50

Speed-Robust Scheduling for Total Completion Time

cs.DS cs.DM ·2026-11-16 ·Moritz Buchem, Nicole Megow, Morten Weber
similarity 0.60
Abstract

We study two-stage speed-robust scheduling for minimizing total completion time. Jobs must be partitioned into $M$ bags before an adversary reveals the speeds of at most $M$ machines. Each bag is then assigned to one available machine, and the jobs on each machine may be processed in any order independent of the bags. We compare with an optimal schedule that knows the speeds in advance and assigns jobs individually. This model has been studied for makespan minimization. We initiate its study for total completion time, as suggested by Stein and Zhong (TALG 2020). For an unknown number of identical machines, we show that the optimal deterministic robustness factor is exactly~$13/12$, both for unit-size jobs and for arbitrary processing times. For infinitesimally small jobs, the factor lies between $31/30\approx1.0333$ and $28/27\approx1.0370$, well below the optimal makespan factor of about $1.2071$. General speeds make the problem strictly harder: no deterministic algorithm is better than $1.2669$-robust, already for infinitesimally small jobs. We give a $25/16$-robust algorithm for arbitrary processing times and improve the guarantee to $1681/1152\approx1.4592$ for infinitesimally small jobs. Our main tools are a layer decomposition that extends guarantees from unit-size jobs to arbitrary processing times when one assignment satisfies them for every prefix in non-increasing processing-time order, and a threshold analysis of the bag counts produced by greedy assignment rules.

0.32

Batch-Dynamic Coreness and Applications with Logarithmic Work via Balanced Pressures

cs.DS ·2026-11-18 ·Quinten De Man, Laxman Dhulipala, Kishen N Gowda, Zhongqi Wang
similarity 0.58
Abstract

We give a parallel algorithm that maintains a one-sided $(2+\varepsilon)$-approximation of all core numbers under batches of edge insertions and deletions. For fixed $\varepsilon>0$, the expected amortized work is $O(\log n)$ per edge update, and each batch has deterministic polylogarithmic depth. This improves on the previously known $(4+\varepsilon)$-approximation and $O(\log^2 n)$ amortized work bounds. This approximation factor approaches the factor-two limit for polylogarithmic update and query time under the OMv conjecture. Our algorithm is based on assigning each vertex a "pressure" and splits each edge's unit load smoothly between its endpoints according to their pressures. After each batch of updates, our dynamic algorithm adjusts the pressures of vertices in parallel to restore balance between the pressures and loads. We show that by maintaining balanced pressures we can obtain good approximations of core numbers. Our construction also gives a $(1+\varepsilon)$-approximation of the densest-subgraph value with logarithmic expected amortized work and supports batch-dynamic maximal matching, clique counting, forest decomposition, and coloring in low-arboricity graphs with improved or matching work bounds. We give a practical implementation of our batch-dynamic coreness algorithm and find that it is able to achieve smaller empirical error than the state-of-the-art parallel batch-dynamic implementation, while running faster. On six real-world graphs, it runs $32\times$ faster than that implementation in geometric mean and $4.1\times$ faster than a state-of-the-art heuristic baseline. On three graphs with up to 1.8 billion edges, it is $9.2\times$ faster than the heuristic baseline.

0.40