Abstract

Building electrification projections are typically developed at aggregated geographic levels to support bulk power system analysis, even though a significant portion of the infrastructure investments required to accommodate electrification occurs within distribution systems. Existing methodologies to disaggregate load growth projections onto distribution networks are based on context-specific analyses that require detailed data on building electricity consumption, distribution feeders, and geographic parcels, which are often proprietary and unavailable for policy and economic impact studies. This paper presents a methodology to disaggregate county-level building electrification projections onto representative distribution feeders and evaluate their impact on distribution upgrade costs. The proposed approach combines bulk system end-use electrification projections with representative feeder sets to generate building-level electrification measures. These measures are then used to create load profiles that are consistent with county-level projections while preserving the spatial diversity of electrification demand required for distribution infrastructure analysis. Using a case study of Genesee County, in Michigan, the results show that the proposed methodology is able to capture a diversity of feeder-level responses to electrification and represent the different realities that building electrification produces within the distribution system. This allows to represent localized load variations and capture more realistic distribution system upgrade costs driven by electrification.

Closest papers

Nearest neighbours by meaning across the whole index.

Computation of Price Signals for Controlling Flexible Prosumers in Distribution Grids Incorporating Stochasticity and Fairness

eess.SY ·2026-10-13 ·Plouton Grammatikos, Chloé Voirol, Pierre Roduit, Fabrizio Sossan
similarity 0.64
Abstract

This paper proposes a method for distribution system operators (DSOs) to design spatially fair dynamic price signals for flexible prosumers, accounting for both distribution grid constraints and the stochastic behavior of prosumers. Since locational pricing can introduce price unfairness when grid constraints are active, the proposed approach includes mechanisms to enforce price fairness across the network. The method involves the DSO solving a scenario-based optimal power flow (OPF) problem to derive, similarly to locational marginal prices in transmission systems, the Lagrange multipliers associated with grid constraints and to compute individualized price signals for each prosumer under various PV generation and demand scenarios. Subsequently, two methods are introduced to aggregate these individualized prices into a single fair price across prosumers. Their performance is evaluated through simulations on a model distribution grid, comparing prosumer revenues, grid constraint violations, and analyzing the impact of fairness on reducing cost variance among prosumers.

0.22

Data-center growth impacts household electricity costs more through wholesale prices than through grid reinforcement

eess.SY econ.GN ·2026-11-11 ·Lingdong Zhou, Wenjia Xia, Jiyu Wang, Fei Ding, Xiangqi Zhu
hot direction similarity 0.62
Abstract · 22 pages, 8 figures, 1 table. Lingdong Zhou and Wenjia Xia contributed equally to this work

Rapid data-center expansion is raising concerns about electricity affordability, yet how the costs of serving these large new loads reach residential customers remains poorly understood. Here, we quantify the potential impact of 371 announced Texas data-center projects, totaling 38.9 GW by 2030, on residential electricity costs by linking power system expansion, wholesale electricity markets, transmission reinforcement, and retail cost allocation. We find that accommodating this demand increases modeled residential electricity costs in one representative case by 1.64 cents/kWh, with 68% arising from higher wholesale electricity prices and 32% from regulated transmission charges. Allowing new gas generation near data centers reduces the 2023 residential cost increase to 0.92 cents/kWh, whereas excluding data centers from the transmission cost-sharing base raises it to 1.87 cents/kWh. These findings reveal that the residential cost burden of data-center growth is driven primarily by wholesale electricity price increases, rather than direct transmission investment costs, and depends critically on generation siting, infrastructure planning, and cost allocation.

0.37

U.S. Data Center Growth Through 2030: A Critical Review of Grid Adequacy and Transmission Expansion Planning

eess.SY ·2026-11-10 ·Babak Porkar, Mona Ghassemi
hot direction similarity 0.59
Abstract

The growth of large data centers raises questions about both supply adequacy and the suitability of load representations used in connection studies. This paper critically reviews the U.S. demand, generation, and transmission outlook through 2030 and examines the implications for transmission expansion planning (TEP). Comparison of public forecasts highlights distinctions among annual average demand, peak demand, and grid connection capacity. National generating-capacity totals cannot establish a dependable surplus because resource availability, regional adequacy, transmission constraints, and project timing determine supply capability. Recent grid events and published dynamic studies demonstrate that faults can trigger substantial data-center transfers to backup supply, followed by delayed or coordinated demand recovery. These behaviors require appropriate representation within the conventional planning framework, alongside assessment of the requested maximum grid import. The selected literature reveals limited integration of validated data-center dynamic models into the technical screening and economic comparison of expansion alternatives. The review identifies the need to establish whether fault response and recovery change feasible connection capacity, required reinforcement, or the preferred transmission investment.

0.35

Analyzing Simultaneous Charging Factors of Electric Vehicles Using Monte Carlo Simulation: A Case Study in Phu Quoc City, Vietnam

eess.SY ·2026-11-04 ·Tien Khai Nguyen, Trong Nghia Le
published similarity 0.59
Abstract · 11 pages, 17 figures. Accepted for publication in GMSARN International Journal (expected in Issue 3, 2027). Author-prepared accepted manuscr…

This study estimates the simultaneous charging factor (SCF) of electric vehicles (EVs) in Phu Quoc City, Vietnam, using a Monte Carlo simulation. Three planning scenarios (2030, 2035, and 2040) are developed from population-based EV uptake assumptions and vehicle-specific charging probability profiles over 24 hours, reflecting distinct operating patterns of motorbikes, cars, taxis, and buses. For each vehicle class and scenario, 1,000 simulation runs are performed to compute SCF and its uncertainty, reported via 95% confidence intervals. Results indicate that SCF decreases as EV penetration increases, implying more temporally dispersed charging demand and a reduced likelihood of extreme coincidence. For electric buses, SCF declines from 0.76 (2030) to 0.59 (2040), and other vehicle groups show similarly decreasing trends across the horizon. These SCF estimates provide practical inputs for grid-aware charging infrastructure planning, including diversity factors for sizing distribution transformers and feeders, identifying peak-hour stress, and informing demand management measures such as time of use tariffs and basic smart charging controls.

0.68

Modeling of Network Constraints in Large-scale Capacity Expansion Optimization of Power Grids

eess.SY math.OC ·2026-08-28 ·Yu Weng, Lara Booth, Priya L. Donti, Ruaridh Macdonald
publishedtheoryhot direction similarity 0.59
Abstract

Capacity expansion modeling plays a critical role in optimizing the deployment of new generation, storage, and transmission, typically at national and regional levels. To support long-term planning, these models consider a large set of energy technologies and policies, along with decades of weather and demand data. Realistic capacity expansion models thus become high-dimensional optimization problems, with hundreds of millions of variables and constraints, which are challenging to solve. A common strategy to address this complexity is to omit non-linear, non-convex AC optimal power flow (ACOPF) constraints and instead use linearized power balance equations or transport formulations. While these simplifications improve tractability, they limit our understanding of how power flow and the physical properties of power networks impact investment decisions across generation, storage, and transmission infrastructure. This paper addresses this gap by extending the GenX capacity expansion model to incorporate fixed point theorem-based network constraints. These embed ACOPF-based considerations while maintaining the tractability of the planning model, nearly preserving the dimensionality of the transport formulation and incurring only modest runtime increases. This approach is much cheaper than embedding ACOPF directly, making it appropriate for large-scale capacity planning problems. We compare our approach to the original transport-based GenX model as well as a non-linear, non-convex version that incorporates the full ACOPF constraints, for a case study of the ISO New England grid.

0.47

EPIGRIDS: Documentation and Validation of Seven Open Synthetic Transmission Grid Cases

eess.SY math.OC ·2026-11-13 ·Jonathan M. Snodgrass, Scott Greene, Thomas J. Overbye, Christopher L. DeMarco, Bernard C. Lesieutre
benchmark similarity 0.58
Abstract · 10 pages, 2 figures, 6 tables. Submitted to the IEEE Open Access Journal of Power and Energy. Cases: https://doi.org/10.5281/zenodo.23814538…

This paper documents and checks EPIGRIDS, seven open synthetic transmission grid cases from four independently built networks, made with an optimization-based construction method instead of the graph-statistics method behind most large public synthetic grids. The cases range from 250 to 78,484 buses, with geolocated substations, voltages up to 765 kV, and line parameters taken from conductor data. Each ships under an open license in three common power flow formats that agree at the solved operating point, and the six larger cases have a companion hourly, bus-level load series for one year. The Texas, Florida, and Michigan, Ohio, and Indiana cases are sub-networks of the Eastern case. Every case solves an alternating-current power flow from its stored operating point. With parallel circuits merged, the Eastern and Western cases are 9 and 16% denser than the real interconnections, while graph-statistics cases on the same footprints lie within 6% and meet more published realism criteria. A full single-outage contingency analysis completes on every case, and in an optimal power flow benchmark every case except the New England base case and one of its 12 operating points solves in polar form.

0.40

MAC+: Mobility-Aware Co-Expansion Planning for Distribution Grid and Electric Vehicle Charging Infrastructure

eess.SY ·2026-11-09 ·Yi Ju, Lunlong Li, Jingchun Wang, Scott Moura
similarity 0.58
Abstract · 20 pages, 6 figures, 7 tables

We study the least-cost co-expansion of power distribution networks and public charging ports to accommodate the growth of electric vehicles (EVs). Our approach, MAC+, exploits the flexibility of charging along each EV's itinerary and coordinates it across the fleet to reduce the peak violations of each feeder's hosting capacity and port capacity. This coordination is an extremely large, spatio-temporally coupled optimization problem with binary plug-in variables. We solve it by iterated price response (IPR), which repeatedly posts a two-tier tariff on feeder load and port occupancy, lets millions of EVs best-respond in parallel, and certifies the optimality gap at every iteration. We develop a custom exact dynamic-programming algorithm that solves each EV's best-response problem, a mixed-integer quadratic program, about 20 times faster than off-the-shelf solvers. The case study covers the San Francisco Bay Area at 30% EV adoption, with 1.8 million EVs on week-long itineraries and 1,303 feeder service regions, each with a utility-published hosting capacity and a port capacity set by its existing public ports. On this instance, IPR reaches a certified gap below 10% in a few hours. MAC+ saves about $15 billion of the upgrade investment that unmanaged charging would require. It also needs over 90% less investment than charging that is fully coordinated but flexible only within each session, and over 80% less than charging that is flexible along the itinerary but uncoordinated.

0.33

Data Center Agglomeration and Power Infrastructure Capacity in the United States

cs.AR ·2026-11-04 ·Yutong Ma
published similarity 0.57
Abstract · 10 pages, 4 figures, 2 tables, conference paper that have been accepted after peer-review

The continuous expansion of digital infrastructure, especially data centers, has imposed unprecedented, geographically concentrated stress on existing power grids. However, rigorous causal evidence quantifying how these facilities reshape local power-infrastructure supply remains limited. This study builds a comprehensive county-level US panel dataset spanning 2010-2024, uniquely integrating individual data center building footprints and power-plant additions. To mitigate endogeneity and high-dimensional confounding, this study deploys Double Machine Learning with five-fold cross-fitting, conditioning on county and year fixed effects alongside regional socioeconomic covariates. Baseline estimation identifies a significant positive causal effect robust across multiple rigorous specifications. The result holds following 1%-99% winsorization that downweights mega-clusters including Loudoun County: growth in data-center floor area drives meaningful increases in nearby power-generation capacity (ATE=1.982, P=0.000, CI: [1.25, 2.72]). Outcomes remain statistically significant using a one-year lagged treatment to address reverse causality, and are stable under state-level fixed-effect alternatives. An event-study framework augmented with historical agglomeration controls validates clear parallel trends and detects a sharp causal spike at t = 3, matching typical utility-scale grid-construction lead times. A placebo test further verifies these causal estimates cannot emerge from random chance. Substantial regional heterogeneity emerges: strong positive impacts concentrate in the West, while significant negative displacement-related effects appear within resource-constrained Northeastern counties. These results deliver timely insights for urban planners and energy regulators, stressing the importance of forward-looking grid-capacity investment to support ongoing digital transformation.

0.42