Planning-Stage Assessment of Battery-Supported Regional Islanding: A South Australian Case Study

Yunqi Wang, Nanduni Nimalsiri, Ghulam Mohy-ud-din, Thomas Brinsmead

eess.SY ·submitted 2026-11-11 11:45 UTC · v1

Abstract

Power systems with high shares of renewable generation may face increased operational vulnerability under regional islanding caused by the loss of major inter-area transmission interfaces. This paper presents a planning-stage transmission-level assessment of regional islanding with battery storage, using a South Australian case study based on a synthetic representation of the Australian National Electricity Market (NEM). An interconnected planning baseline is compared with a stress test scenario involving complete regional-islanding over a 24-hour chronological horizon. The framework quantifies peak unserved power, total unserved energy, and the duration of unserved demand, while characterising battery redispatch and the synchronous inertia accessible to the subsystem.

Closest papers

Nearest neighbours by meaning across the whole index.

Autonomous agents for electricity-system planning

cs.AI cs.CL ·2026-11-04 ·Yoon Pyo Lee, Samrendra Roy, Jay Phil Yoo, Kazuma Kobayashi, Souvik Chakraborty +1 more
similarity 0.58
Abstract

Planning electricity systems requires repeated decisions that connect regional resources, investment, operation and network constraints. Here we present an autonomous planning framework that carries prepared regional scenarios through proposal, numerical evaluation, feedback interpretation, redesign and final plan selection. Agents propose investment bounds, storage operating conditions and feeder interventions, interpret numerical feedback, and decide how to revise designs and when to stop. The framework automatically executes annual investment-and-dispatch optimization and representative-feeder verification, applies fixed acceptance criteria and retains the lowest-cost accepted candidate. We evaluate forty carbon-constrained trajectories across ten system-year scenarios in five electricity systems and four countries, using two model deployments and single- and multi-agent architectures. All forty retain candidates satisfying the implemented physical and fixed annual operational carbon-budget checks. Twenty-eight of forty matched reference designs exceed the new scenario ceilings. A separate archive of ninety-six trajectories under a common 1,000 Mt annual ceiling provides matched references and broader regional coverage. The results demonstrate autonomous planning under explicit emissions constraints using public regional data and published institutional demand outlooks.

0.20

On the Optimal Co-location of Data Centers with Renewable Energy Sources in SIDS

eess.SY math.OC ·2026-09-16 ·Shankar Ramharack, Patrick Hosein, Rajiv Sahadeo
top venue similarity 0.57
Abstract · 6 pages, 4 figures, accepted to 2026 IEEE Caribbean Conference (CaribCon) - Track 3 - Smart Systems, Robotics, and Automation

The rapid expansion of data centers presents both economic opportunities and systemic risks for Caribbean Small Island Developing States~(SIDS). This paper develops a PyPSA-based capacity expansion framework for optimal co-location of data centers with renewable energy infrastructure, incorporating behind-the-meter battery storage, workload flexibility (70\%/30\% inflexible/flexible split), and multi-bus transmission topology. Two case studies are examined: Trinidad~\&~Tobago (single-bus, 92\,MW Brechin Castle solar, 5\,MW data center) and Jamaica (4-bus 138\,kV JPS network, 15\,MW data center at Kingston). Jamaica's optimum deploys 405\,MW solar, 278\,MW wind, 800\,MWh grid-scale BESS, and 84\,MWh behind-the-meter BESS, achieving 42.5\% renewable penetration; Trinidad's gas-anchored optimum builds no new RE, and a sensitivity analysis shows solar entering at gas costs above \$65--70/MWh, a carbon price of \$25--50/tCO$_2$, or solar CAPEX of \$800/kW. A post-hoc distributionally robust stress test evaluates hurricane resilience, and a novel 10-factor siting framework addresses the regulatory gap in SIDS that lack data-center-specific zoning. Results show that energy-optimal locations may score poorly on societal criteria---noise, freshwater stress, zoning readiness. This demonstrates the need for integrated planning tools in small island contexts.

0.33

Trust-Region Benders for Scalable Multiperiod Expansion Planning for Transmission and Storage

eess.SY ·2026-10-23 ·Kevin Wu, Rabab Haider, Pascal Van Hentenryck
published similarity 0.56
Abstract · Presented at PowerUp 2026, September 9-11, 2026, Boulder, Colorado

Transmission expansion planning (TEP) seeks to identify cost-effective investment strategies that enable power systems to reliably meet future demand, while accounting for the location, timing, and operational impacts of infrastructure upgrades. As demand grows and renewable penetration increases, there is growing interest in jointly modeling energy storage investments to enhance operational flexibility. This work presents a multiperiod formulation that co-optimizes transmission reconductoring and energy storage installation across multiple planning periods. To solve the resulting large-scale problem efficiently, a Benders decomposition with per-period trust-region stabilization and a relaxation-based warm-start procedure is proposed. The approach is demonstrated on a 2,000-bus Texas system, producing an investment plan spanning 2030-2045 with optimality gap below 1.0%, and is compared against a rolling-horizon approach to highlight the benefits of multiperiod coordination.

0.29

Readiness-Constrained Pre-Islanding Dispatch for Military Microgrids

eess.SY math.OC ·2026-10-29 ·Aidan Looney, Annie Weathers, Nicholas Judson
similarity 0.55
Abstract · 32 pages, 5 figures, 3 tables, submitted to Military Operations Research

Military installation energy readiness depends on having sufficient resources to sustain mission-critical loads throughout a prolonged utility outage. This paper develops a method to help operators manage energy resources during normal grid-connected operation while preserving islanded readiness. A robust viability kernel identifies combinations of battery energy, fuel, and load-shifting capability sufficient to sustain critical load under uncertain demand and photovoltaic generation. A probability bound translates stochastic generator start failures and recovery into a deterministic generator count selected to meet a specified availability requirement at islanding. Case studies for a fourteen-day islanding requirement at 0.999 islanding-entry availability show that advance warning of an outage can be used to prepare resources to meet a higher readiness requirement before islanding begins. The case studies further demonstrate that economic-only operation and the evaluated fixed battery reserve policy can fail to sustain critical load for the required duration, whereas enforcing the resource-dependent requirement preserves readiness at a modest increase in modeled grid-connected operating cost. These results demonstrate how active resource management can preserve long-duration energy readiness. The framework also helps commanders understand how readiness changes with operating conditions, even when the available resources remain the same.

0.32

Transmission Expansion and Energy Storage Planning under Great Britain's Uncertain Energy Transition Pathways

eess.SY math.OC ·2026-11-17 ·Shengming Cao, Runsheng He, Waqquas Bukhsh
benchmark similarity 0.54
Abstract · 49 pages, 10 figures

Long term power system planning must account for uncertainty in electricity demand and generation, while recognising the different investment and commissioning characteristics of transmission and energy storage. This paper develops a multi year stochastic framework for coordinated transmission expansion and energy storage planning and applies it to the Great Britain electricity system to assess investment needs through to 2050. The framework integrates multiple energy transition pathways with an enhanced representation of the GB transmission network and captures the different characteristics of transmission and storage investment over time. The coordinated treatment of transmission and storage is considered as a system level benchmark rather than a centralised investment mechanism. In GB, transmission investment is subject to regulated forward looking planning, while storage is largely developed by market participants in response to market signals. The framework therefore quantifies the potential value of improved coordination and identifies where existing investment signals may not encourage complementary storage deployment. Results across alternative transmission only, storage only and coordinated investment strategies show substantial benefits from joint planning. Compared with transmission only planning, coordinated investment reduces additional transmission capacity by 2%, cumulative expected load shedding by 97%, and total expected system cost by 36%, primarily through avoided unserved energy. Transmission preparation periods affect the timing, but not the final portfolio, of investments. Finally, the energy transition pathway materially influences investment requirements, with Electrification and Efficiency requiring 7% more transmission capacity and 45% more storage energy capacity than Falling Behind.

0.22

State-of-Charge Targets for Storage Participation in Two-Settlement Markets: Reliability, Price, and Compensation Impacts

eess.SY ·2026-11-13 ·Yichen Li, Alexandre Moreira, Ruiwei Jiang, Miguel Heleno, Julie Mulvaney-Kemp
hot direction similarity 0.54
Abstract

As energy storage assumes a larger role in electricity systems, market operation must coordinate its use across time to support reliability during periods of system stress. Minimum state-of-charge (SOC) targets provide a means of preserving energy for these periods, but their design shapes reliability, operating efficiency, and storage compensation. This paper evaluates alternative SOC target designs in a California-based day-ahead and real-time electricity market model. The comparison examines targets based on day-ahead schedules or rolling centralized dispatch, enforced at the individual-resource or system level, across seasons, stress conditions, and participant information settings. The results show that retaining more energy does not necessarily reduce load shedding: targets that restrict discharge can limit storage support during shortages. Under critical summer conditions, individual targets derived from rolling centralized dispatch reduce weekly load shedding by approximately 83--84\% relative to operation without targets. Lower RT clearing costs and average prices can coexist with higher storage compensation, reflecting the role of day-ahead positions and real-time deviations in determining settlement outcomes. These findings highlight the importance of coordinating energy retention with timely discharge and network deliverability when designing SOC requirements for storage participation in electricity markets.

0.25

Generation and Transmission Expansion Planning with BESS-Based Virtual Transmission Lines

eess.SY ·2026-10-02 ·Qiushi Wang, Xingpeng Li
similarity 0.53
Abstract · Submitted to Energy Conversion and Economics

This paper proposes a mathematical model for long-term Generation and Transmission Expansion Planning (GTEP) that integrates a relaxed Virtual Transmission Line (VTL) as a Storage in Place of Transmission Asset (SIPTA) strategy to address challenges posed by transmission capacity shortages and system congestion in deregulated power markets, particularly under the rapid growth of renewable energy resources and integrated data centers. The proposed VTL formulation coordinates the operation of the two battery energy storage systems (BESSs) forming a VTL pair by preventing them from charging or discharging simultaneously, thereby providing additional congestion relief without introducing an explicit congestion cost into the objective function. Base case studies on a revised IEEE 24-bus system demonstrate that VTL reduces system congestion compared with the standalone BESS case, achieving a 12.3% reduction in weighted total congestion and up to approximately 67% reduction in congestion on individual transmission branches, with only a 0.3% increase in total planning cost. Furthermore, improvements across multiple congestion metrics indicate that the benefits of VTL extend beyond reducing congested line-hours to reducing congestion rent and N-1 transmission violations in the base case. These results demonstrate the potential of VTL to provide congestion mitigation that complements standalone BESS applications.

0.17

Quantifying the Unintentional Islanding Risk: A Comparative Study on Active Distribution Network

eess.SY ·2026-09-10 ·Harshit Nayak, Edoardo Daccò, Jose Luis Rueda Torres, Davide Falabretti
similarity 0.53
Abstract

The growing share of Inverter-Based Resources (IBRs) is changing the operation of modern Active Distribution Networks (ADNs), raising concerns for grid stability, protection, and reliability. In this paper, we investigate the dynamic behavior of a Medium-Voltage (MV) portion of an ADN during the transition from grid-connected to islanded operation. The study considers a Grid-Following (GFL) converter and Synchronous Generators (SGs) operated under two distinct regulation modes: a fixed-setpoint, non-regulating condition representative of present-day distribution networks, and an active frequency/voltage-regulating condition representative of SGs equipped with governor and AVR control. Detailed electromagnetic transient (EMT) models of both technologies have been developed in DIgSILENT PowerFactory that quantifies the sensitivity of island persistence to SG regulation mode and inertia. The results show that when DERs operate at a fixed power setpoint, the risk of forming a sustained, undetected electrical island is limited, since the isolated network drifts out of the protection thresholds within tens of seconds. Conversely, enabling frequency and voltage regulation on the SGs is sufficient to sustain an unintentional island indefinitely without triggering conventional protection, regardless of system inertia.

0.28