CS Paper Radar

Stochastic Crew Placement for Winter Storm Restoration of Rural Distribution Feeders Considering Building Cooling Deadlines

Rajkumar Silwal, Shambhu Marasini, Bo Tu

eess.SY ·submitted 2026-11-18 21:53 UTC · v1

Abstract

Winter storm outages on rural distribution feeders may leave electrically heated houses cooling below acceptable indoor temperatures. This paper proposes a two-stage stochastic mixed-integer linear program for pre-storm crew placement that considers the building cooling deadline. Crews are placed before the storm, and repairs and reconnection are scheduled in each damage scenario to minimize the expected cost. Specifically, outage house-hours beyond the deadline are penalized, and feeder voltage and loading constraints account for cold load pickup at each reconnection. A case study on a synthetic rural feeder shows that the penalty shifts one of two crews toward a remote village, reducing expected house-hours beyond the deadline by 39 percent for 5.3 percent more outage house-hours. With three crews, the penalty does not change crew placement. Immediate reconnection would violate the voltage limit in four of six scenarios.

Closest papers

Nearest neighbours by meaning across the whole index.

Resilience Enhancement of Distribution Grids Through a Three-Stage Framework for Scheduling Mobile Energy Storage Systems

eess.SY ·2026-09-24 ·Ali Abbasi, Kyri Baker
similarity 0.59
Abstract

As high-impact, low-probability disturbances such as extreme weather events increase in frequency, enhancing power grid resilience has become a critical priority. Mobile Energy Storage Systems (MESSs) have strong potential for helping with this purpose due to their high operational flexibility and fast deployability. They can be rapidly relocated to supply critical loads, support islanded operation, and adapt to changing conditions of the grid, making them a promising addition or alternative to conventional resilience-providing methods. This paper proposes a three-stage framework for scheduling MESS units. In the first stage (Normal Operation), charging/discharging scheduling of MESSs at buses is optimized for economic arbitrage. Upon receiving an early warning signal, the second stage (Proactive Positioning) shifts the focus to resilience. Here, the model determines the optimal staging points within the transportation network to minimize the expected time of arrival at critical loads, considering the probability distribution of line outages. The third stage (Dynamic Relocation) addresses the post-event restoration phase, in which MESSs are relocated in response to grid updates, such as subsequent line failures. Furthermore, a graph neural network-based solution approach is proposed to further enhance computational efficiency in determining the optimal placing of MESS units during the pre-allocation and relocation stages. The simulation results demonstrate that the proposed framework reduces expected energy not served and improves the restoration speed.

0.21

Feeder-Aware Service-Conditioned Flexibility of Grid-Interactive Buildings

eess.SY ·2026-10-22 ·Dafang Zhao, Ittetsu Taniguchi, Takao Onoye
similarity 0.59
Abstract

Grid-interactive buildings can adjust demand, but building-feasible power budgets may differ from accepted feeder-head offers. This study addresses a practical question: to what extent can the adjustable electricity consumption of buildings be translated into deliverable flexibility services while satisfying feeder-head operating requirements? To enable a fair comparison, we adopt the same baseline operating schedule, equipment conditions, and post-service recovery requirements for indoor temperature and battery state of charge (SOC). Flexibility is then evaluated under two settings: one considering only building-level constraints, and the other additionally accounting for feeder-head constraints. We first use a simplified network model with explicit security margins to determine a preliminary amount of flexibility that can be committed. The resulting schedule is then validated using a more detailed network simulation via Modelica. If network losses cause the actual response to deviate from the committed response, the electricity consumption of individual buildings is rescheduled. If the required response still cannot be achieved, the committed flexibility level is reduced. The experiments cover multiple service activation times, regulation directions, and service durations. For comparative purposes, we retain the initial optimization result as the reference estimate of the maximum potentially available flexibility, rather than interpreting the failure of a particular subsequent realization attempt as evidence that a larger flexibility level is inherently infeasible. The results demonstrated that 24.51\% of nonzero flexibility contracts were rejected due to feeder-head constraints, 67.04\% of contracts were accepted with some rescheduling and building redispatch, and only 8.09\% of contracts were accepted without any changes.

0.16

State-of-Charge Targets for Storage Participation in Two-Settlement Markets: Reliability, Price, and Compensation Impacts

eess.SY ·2026-11-13 ·Yichen Li, Alexandre Moreira, Ruiwei Jiang, Miguel Heleno, Julie Mulvaney-Kemp
hot direction similarity 0.58
Abstract

As energy storage assumes a larger role in electricity systems, market operation must coordinate its use across time to support reliability during periods of system stress. Minimum state-of-charge (SOC) targets provide a means of preserving energy for these periods, but their design shapes reliability, operating efficiency, and storage compensation. This paper evaluates alternative SOC target designs in a California-based day-ahead and real-time electricity market model. The comparison examines targets based on day-ahead schedules or rolling centralized dispatch, enforced at the individual-resource or system level, across seasons, stress conditions, and participant information settings. The results show that retaining more energy does not necessarily reduce load shedding: targets that restrict discharge can limit storage support during shortages. Under critical summer conditions, individual targets derived from rolling centralized dispatch reduce weekly load shedding by approximately 83--84\% relative to operation without targets. Lower RT clearing costs and average prices can coexist with higher storage compensation, reflecting the role of day-ahead positions and real-time deviations in determining settlement outcomes. These findings highlight the importance of coordinating energy retention with timely discharge and network deliverability when designing SOC requirements for storage participation in electricity markets.

0.20

Stochastic Distribution Network Reconfiguration under Load Uncertainty

eess.SY ·2026-10-08 ·Celso Cavellucci, Fábio Luiz Usberti
similarity 0.58
Abstract

This paper investigates distribution network reconfiguration under demand uncertainty using a two-stage stochastic formulation. The network topology is selected in the first stage, whereas the electrical variables are determined separately for each scenario. The deterministic equivalent is formulated as a MISOCP problem that accounts for power balances, losses, voltage constraints, and radiality. Experiments on 12 networks, ranging from 17 to 10,561 nodes, consider three demand scenarios. Reconfiguration reduced expected losses in all instances, with reductions ranging from 3.23% to 65.23% and averaging 31.76%, while also reducing the number of voltage violations in the ex post evaluation by approximately 55%. Eleven of the 12 problems were solved to optimality within the prescribed time limit. However, the additional benefit of stochastic modeling was negligible because of the homothetic structure of the scenarios considered, which preserves the spatial distribution of loads. The results show that spatially heterogeneous scenarios are important for the representation of uncertainty to meaningfully affect reconfiguration decisions.

0.27

Forecast lead time and the timing of crew deployment for weather-driven power outages using AI weather models

cs.AI physics.ao-ph ·2026-10-14 ·Mohammad Kian Golkar, Luciano Alves de Oliveira, Mohamad Alipour
similarity 0.56
Abstract

Utilities request mutual aid crews to restore power after severe storms, and requesting early secures more crews but relies on less accurate forecasts. We examined how forecast lead time affects the value of outage predictions for crew deployment, using operational forecasts from two AI weather models, GraphCast and FourCastNet, to predict outage occurrence for counties across the contiguous United States 24 to 120 hours ahead. Forecasts were evaluated by the share of outage burden captured by the counties where crews would be staged. Captured burden declined with lead time: the loss between three and five days was significant in all analyses, whereas the loss within three days was significant only for outages that had not yet started. Early deployment with all requested crews outperformed late deployment with fewer, and we report the availability ratio at which the two break even. Antecedent land surface predictors computed at forecast valid time include weather from the forecast period, which inflates their skill by 42 to 53% and reverses their apparent advantage over forecast meteorology at long lead times. Computed correctly, they improved occurrence skill by 17.5% at 24 hours but did not significantly change captured burden, a gap that attribution analysis linked to their static component. Prediction intervals covered only 0.476 of tropical cyclone events against a nominal 0.90. Calibration by hazard class corrected most of this shortfall at an 11% cost in interval width, as a diagnostic only, because hazard class is known only after the event.

0.21

A multi-stage probabilistic framework to estimate gas-fired generator performance during extreme winter weather

cs.LG stat.ML ·2026-10-03 ·Sajjad Uddin Mahmud, Anamika Dubey
similarity 0.56
Abstract

Extreme winter weather has repeatedly disrupted gas-fired power generation in the United States, yet the plant-level data needed to systematically quantify outage risk remain proprietary. Using publicly available weather and electricity demand data together with anonymized generator contingency records from the North American Electric Reliability Corporation (NERC), we develop a three-stage Bayesian probabilistic framework for estimating winter-driven generator performance. Applied to New York State (2013--2022), the framework sequentially estimates: the hourly probability of a generator contingency event, the expected net available capacity conditioned on an event occurring, and the event duration. Colder conditions and higher electricity demand are associated with higher failure probability, lower retained capacity, and longer event duration. Under the most severe observed stress conditions, estimated mean hourly event probability reaches 24\% , while expected mean net available capacity falls to 13\% of nameplate rating. Full outage events have a median duration of 12.7 hours, while partial derating event duration increases from 2.4 to 7.1 hours with capacity loss severity. The proposed framework establishes a transferable baseline that utilities with access to plant-level records can directly extend to obtain more precise reliability estimates for operational planning and resource adequacy assessment.

0.24

Compound Climate Risk-Aware Electricity Dispatch: Trajectory-Based Modeling for Power System Resilience

eess.SY ·2026-10-29 ·Feiyu Cai, Jing Qiu, Chenxi Zhang, Yi Yang, Yuechuan Tao +1 more
similarity 0.55
Abstract · 10 pages, 8 figures

In recent decades, emerging compound hazards in a changing climate have increasingly threatened power system resilience and posed new challenges to electricity dispatch. Conventional Value-at-Risk (VaR)-based risk-aware dispatch provides a tractable means of managing stochastic net demand deviations caused by distribution feeder outages. However, when applied to temporally compounding events such as tropical cyclone (TC)--blackout--heatwave, conventional net demand risk formulations may assign similar risk levels to a brief outage and an outage with the same instantaneous net demand impact that persists into a subsequent hazard, despite their different requirements for sustained operational flexibility. Moreover, directly incorporating compound risk into electricity dispatch models faces a structural mismatch: the risk is defined by the joint distribution of feeder restoration and subsequent hazards over exponentially many joint states, whereas dispatch models require risk formulations that are tractable in the scheduling decisions. To address these issues, this paper proposes a compound climate risk-aware dispatch framework with a trajectory-based compound risk model, which defines the loss on operating deviations determined by entire feeder connection trajectories, parameterized by uncertain restoration times and coupled with subsequent hazards. Analytical moment-generating functions and equivalent exponential-cone reformulations provide a compact representation of the resulting risk constraints, preserving the relevant dependencies without explicit joint-state enumeration. By leveraging a physics-based spatiotemporal TC--blackout--heatwave hazard model, case studies demonstrate the effectiveness of the proposed method with real-world time-series power outage data from Puerto Rico, including data collected during Hurricane Fiona in 2022.

0.34

Continuous-Time Aggregation of Massive Flexible HVAC Loads Considering Uncertainty for Reserve Provision in Power System Dispatch

eess.SY ·2026-09-02 ·Jingguan Liu, Xiaomeng Ai, Jiakun Fang, Shichang Cui, Shengshi Wang +2 more
top venuehot directionhighly cited similarity 0.54
Abstract · Published in: IEEE Transactions on Smart Grid (vol. 15, no. 5, pp. 4835-4849, 2024)

Heating, ventilation, and air conditioning (HVAC) loads, with their rapid response capabilities, can provide considerable intra-hour flexibility on the demand side for reserve provision in order to follow the fast variations of renewables. However, scheduling massive HVACs is challenging due to computation complexity and the uncertainty of outdoor temperature. In this paper, we first introduce a novel continuous-time (CT) aggregation model to reveal the potential intra-hour flexibility of HVACs. For accurate aggregation, a new affine transformation is designed to handle the heterogeneity in high-dimensional feasible region. Further, for reliable aggregation in practical environment, the outdoor temperature uncertainty is constructed by distributionally robust chance constrains and integrated into the aggregation model. Secondly, for the tractable calculation of the proposed CT aggregation model, a cascade of tailored reformulation techniques is proposed, including the Bernstein polynomial spline, polytope projection, and linearization transformation. Thirdly, a customized hierarchical dispatch framework is proposed via incorporating the proposed CT aggregation model into reserve provision in power system dispatch, so as to efficiently schedule massive HVACs to cope with the renewable uncertainty. Case studies verify the effectiveness and scalability of the proposed CT aggregation model in aggregation accuracy, intra-hour flexibility utilization, and uncertainty handling.

0.67