CS Paper Radar

Which Model Belongs in the Loop? Evaluating Fitness Functions for Network Topology Optimization with a Quality-Diversity Algorithm

Paul Bannmüller, Olayiwola Arowolo, Jochen Stiasny, Jochen Cremer

cs.NE eess.SY ·submitted 2026-11-21 16:41 UTC · v1

Abstract

Network topology optimization (NTO) can reduce redispatch cost by rerouting power flows in transmission systems. To approach NTO, a complex combinatorial problem, gradient-free optimization algorithms that leverage diversity have shown promising results. These algorithms rely on frequent evaluations of candidate topologies by fitness functions. Recent work has shown that fast DC power flow-based fitness functions can serve this purpose. However, DC power flow fitness functions can misjudge the cost and feasibility of topologies, potentially leading to wrong operational decisions. Understanding the impact of fitness function accuracy on optimization performance is therefore crucial. This study compares the optimization performance of four fitness functions based on DC and AC power flow and on DC and AC optimal power flow. Furthermore, we propose a ranking-based metric to estimate the optimization performance of a fitness function on a curated dataset. Case studies cover the IEEE 118-bus case with 50 congested operating points and a 793-bus case for validation. Results show that optimal power flow-based fitness functions perform better in the optimization loop than power flow-based ones. Additionally, the results indicate that the metric can predict the optimization performance order of the fitness functions, but only if the distribution shift between the curated dataset and the search path of the optimization is small.

Comment
This preprint is currently under peer review

Closest papers

Nearest neighbours by meaning across the whole index.

Grid Topology Optimization for Congestion Management Under High Renewable Penetrations and Discrete Load Growth

eess.SY ·2026-09-13 ·Giacomo Bastianel, Hakan Ergun, Line Roald
similarity 0.64
Abstract

Transmission grids are increasingly stressed by the fluctuating nature of renewable energy sources and by increasing electricity demand. Such grids were mainly built for a different generation fleet and load conditions. Grid topology optimization offers the possibility to redistribute power flows by modifying the busbar topology of substations in the grid. However, the combinatorial explosion of feasible busbar configurations makes topology optimization impractical for system operators. This paper proposes a methodology to identify a small subset of high-value busbar topologies to capture the economic benefit of topology optimization across a range of renewable-demand patterns. The optimization model is based on a LPAC approximation of the optimal power flow formulation, and AC-feasibility checks of the optimal topology applied to the IEEE 118-bus test case. In the test case, we select two distinct pairs of substations (46-49 and 24-69) and we optimize their topology separately over 365 clustered timesteps with different wind and load conditions. For each pair, we identify the four most recurrent optimal topologies and evaluate their performance under standard, and congested conditions, with and without a discrete load growth. Results show that selecting from this reduced set of topologies reduces total generation costs by up to 0.147% compared to a plain AC-OPF. In addition, we show the influence of topology optimization on the hosting capacity of selected busbars under discrete load growth. Our findings provide a practical methodology for system operators to select a subset of optimal busbar topologies to be used in their grid for different wind-load conditions, resulting in decreasing generation costs without the computational and operational risks of real-time switching decisions.

0.24

Distribution Grid Reconfiguration and Restoration via Linearizable Multi-phase Power Flow Modeling

eess.SY ·2026-10-26 ·Young-ho Cho, Hao Zhu
similarity 0.62
Abstract

Accurate and tractable power-flow (PF) modeling is essential for distribution grid topology optimization, where the presence of discrete branch-status decisions therein significantly increase the computational complexity. To tackle this challenge, we develop a topology-adaptive, low-complexity neural piecewise-linear (N-PWL) PF model. We propose a sequential layer design that can directly incorporate branch status variables into the PF mapping from branch flows to nodal injections. As a result, our N-PWL model not only preserves the PF branch-node consistency but also facilitates the representation of any unseen topologies without retraining. A low-complexity model design is further pursued to attain a linear NN parameter scaling by using a fixed-size area partition of the feeder. The resulting scalable N-PWL model enables mixed-integer linear programming (MILP) formulations of feeder topology optimization tasks, including distribution network reconfiguration (DNR) and restoration ordering problems (ROP). Numerical studies on the unbalanced, multi-phase IEEE 123-bus feeder demonstrate our N-PWL model outperforms existing end-to-end baselines in PF prediction and, more importantly, can fill the gap by achieving accurate representation of any unseen topologies. For solving DNR/ROP, our model can significantly improve the AC feasibility over linearized PF models, with a notable reduction of computation time compared with AC-PF based nonlinear formulations, particularly under a large number of topology decisions.

0.20

Co-Optimization of Network Topology and Variable Impedance Devices under Dynamic Line Ratings Using Iterative McCormick Relaxation

eess.SY ·2026-10-27 ·Junseon Park, Hyeongon Park, Rahul K. gupta
benchmark similarity 0.61
Abstract

Grid Enhancing Technologies (GETs), such as Network Topology Optimization (NTO), Dynamic Line Rating (DLR), and Variable Impedance Devices (VIDs) are increasingly deployed in power transmission grids to address congestion and improve grid utilization. However, their growing adoption necessitates coordinated operation to fully exploit their benefits. This paper presents a unified co-optimization framework that integrates NTO, DLR, and VID to alleviate congestion and minimize operational costs. NTO is modeled using a node-breaker formulation to provide enhanced switching granularity, while DLR incorporates weather-dependent parameters, including wind speed and ambient temperature, to dynamically adjust transmission limits. The resulting formulation is a mixed-integer nonlinear program due to power flow constraints with bilinear VID terms, and discrete topology decisions. To improve tractability, we propose using a McCormick relaxation approach to linearize bilinear terms. Furthermore, we propose an iterative refinement of the McCormick relaxation scheme to enhance solution accuracy. The proposed framework is validated through detailed analyses on the IEEE 118-bus system, along with additional case studies on other benchmark systems to assess scalability. Results demonstrate that the proposed approach improves solution accuracy compared to standard McCormick relaxation, achieves solution quality close to the nonlinear formulation, and maintains computational efficiency.

0.29

AC Assessment of DC Power Flow Screening for Data Center Hosting Capacity and Siting

eess.SY ·2026-11-14 ·Haoxiang Wan, Jesus Silva-Rodriguez, Jonghwan Kwon, Xingpeng Li
hot direction similarity 0.59
Abstract · 5 pages, 5 figures, 1 table. Submitted to the 2027 IEEE PES General Meeting

A screening procedure based on direct current (DC) power flow estimates the data center hosting capacity of a candidate bus, termed the DC-screened capacity, and selects the generator commitment that supports it. This paper assesses that estimate under the alternating current (AC) network model. With the selected commitment fixed, an AC optimal power flow reoptimizes dispatch and voltages to find the largest data center load the bus can carry, termed the AC-assessed capacity. On a synthetic Texas system with 123 buses, the DC-screened capacity exceeds the AC-assessed capacity at 113 buses. Across all 123, the ratio of DC-screened to AC-assessed capacity has a median of 143% (a 43% overestimate) and a maximum of 1,070%. At these 113 buses, the DC-screened capacity violates a branch apparent power limit or a generator reactive power limit in the AC model, two limits the DC model omits. The overestimate changes decisions: a 1-GW project passes DC screening at every bus but exceeds the AC-assessed capacity at 37, and the bus ranked first by DC screening has 205.5 MW less AC-assessed capacity than the bus ranked second. Reporting the AC-assessed capacity beside each DC-screened capacity lets planners reject oversized projects or choose better sites.

0.30

Quantifying the Cost of Restoring AC Feasibility for Approximate Optimal Power Flow Solutions

eess.SY math.OC ·2026-11-11 ·Sanjay Johnson, Sungho Shin
theory similarity 0.58
Abstract · 5 pages, 4 figures, submitted to 2027 IEEE Power & Energy Society General Meeting

Power system operations rely on approximate solutions of the AC optimal power flow problem, most notably the DC optimal power flow used in security-constrained unit commitment and economic dispatch, while convex relaxations, machine learning surrogates, and other approximations are studied extensively in the academic literature. Because these approximations neglect or relax parts of the AC power flow equations, their solutions must be adjusted before dispatch; for example, the DC optimal power flow, which neglects transmission losses, reactive power, and voltage magnitude variations, is known to produce solutions that are always infeasible. The cost of this adjustment is not adequately understood. This paper proposes a method that quantifies, for any approximate solution, the minimum cost of the adjustments that restore AC feasibility, which is a lower bound on the cost of the heuristic adjustments used in practice. We apply it to the DC optimal power flow, the second-order cone and quadratic convex relaxations, and the AC optimal power flow solved to a loose relative tolerance of $10^{-4}$ instead of $10^{-8}$. Relative to the AC optimal power flow solution obtained from a local nonlinear optimization solver, and even with the minimum adjustment, the DC optimal power flow requires adjusting, on average, generators that account for 15.6% of total generation capacity and incurs a 1.10% cost increase; the convex relaxations require more adjustment (17.2% and 16.9%) but smaller cost increases (0.68% and 0.78%); and the loose-tolerance AC optimal power flow requires 6.1% and incurs 0.42%. These results indicate significant value in operating markets directly on the AC optimal power flow, which avoids the distortion of the dispatch and prices caused by heuristic feasibility restoration.

0.27

GridForge: A Tractable Network-Flow Method for Constructing Open, Continental-Scale Synthetic Power Grids

eess.SY ·2026-11-12 ·Jonathan M. Snodgrass, Thomas J. Overbye, Christopher L. DeMarco, Bernard C. Lesieutre
similarity 0.58
Abstract · 30 pages, 10 figures, 7 tables; supplementary material as an ancillary file. Submitted to the International Journal of Electrical Power & En…

The goal of this paper is to construct open, continental-scale synthetic transmission grids with an optimization method that stays tractable. Security restrictions keep models of the real grid out of open research and machine-learning datasets, and optimization-based construction is hard at scale: the number of candidate lines grows combinatorially, so electrically faithful methods prune the candidates in advance. This paper presents GridForge, which keeps every bus pair within physical length limits as a candidate, selects lines with Garver's length-weighted network-flow linear program instead of binary decisions, and resizes them with a sequential direct-current (DC) power flow. Two stages of 13 regional networks are evaluated. Their node-degree distributions are nearly as strongly log-linear as those of the real Eastern and Western Interconnections ($R^2$ of 0.92 to 0.98 against 0.971 and 0.981), although the areas under the fitted lines differ from the real ones by 39.9% on average. On the upper Midwest and Tennessee Valley footprints, resizing lowers the DC power-flow loss from 5.89% to 4.14% and from 14.55% to 7.05%, and the DC optimal power-flow loss from 4.03% to 2.02% and from 5.54% to 2.47%. Without relaxing any line limit, the DC optimal power flow is feasible in 78.81% and 0.82% of the scenarios. Most lines are built at 69 kV. The models span 250 to 78,484 buses, were built on single machines, and are freely redistributable.

0.62

A Rollout-Based Approach to Real-Time Topology and Dispatch Control in the AI4RealNet L2RPN Benchmark

eess.SY math.OC ·2026-11-16 ·David Krame Kadurha, Robbert van der Burg, Alessandro Zocca, Sandjai Bhulai
benchmarkcode/data similarity 0.58
Abstract

Operating transmission networks under uncertain outages requires coordinating discrete network topology actions with continuous adjustments to generation and storage, while respecting operational constraints and real-time computational limits. We present a rollout-based controller that combines discrete and continuous decisions under the uncertain contingency policy of the L2RPN AI4RealNet 2026 challenge. Power-flow approximations and convex optimization identify the most promising actions, followed by short-horizon simulations to predict their effect on congestion, renewable curtailment, and redispatching costs. A further policy exploits the benchmark's specific attack protocol: keeping selected lines disconnected prevents some adversarial outages from being initiated. On the benchmark's $118$-bus network, the controller completed $189$ of $208$ final-test scenarios (score $64.39$) and achieved the second-best ratio of score to computation time among the five top-ranked entries, behind one that scored lower. Our results show that combining structured optimization with simulation-based action selection is effective even without a learned decision rule, and fast enough for real-time control. Code and reproduction material: https://github.com/DavidKrame/RAD_agent__AI4RealNet_competition.

0.51

TANGCO: Learning Topology-Aware Capacity Allocation for Overload-driven Cascading Failures

cs.LG cs.SI ·2026-08-13 ·Orkun Irsoy, Leman Akoglu, Osman Yagan
similarity 0.58
Abstract

Networked systems, from power grids to traffic networks and cloud clusters, carry loads across nodes with limited capacity. A node whose load exceeds its capacity fails and sheds its load onto its neighbors, which can trigger a system-wide cascade. We study how to allocate a fixed capacity budget across nodes to resist these cascades under local load redistribution. The problem is difficult because no optimal allocation is known, and the fail-or-survive objective is non-differentiable and piecewise constant, so exact and gradient-based optimization methods do not directly apply. We introduce TANGCO (Topology-Aware Neural Graph-Guided Capacity Optimization), which uses a graph neural network policy trained through the cascade simulator with policy-gradient learning and a heuristic anchor. We evaluate TANGCO on five synthetic graph families and five real networks spanning power, road, air, and Internet topologies. The learned policy improves on the best of four hand-designed heuristics in all 450 synthetic instances and in 40 of 45 real-network conditions, with robustness gains ranging from 1.6% to 246%. The learned policies transfer to unseen graphs within a family and partially across related topologies, and TANGCO$^{pre}$, pre-trained on synthetic graphs, matches per-network training on unseen real networks. Training scales near-linearly with graph size, and TANGCO$^{pre}$ allocates on a new network with no per-target training, matching the deployment cost of a hand-designed heuristic. Free-vector variants without the GNN, stay close to the heuristics, so the graph representation carries the gain beyond numerical search. Finally, analysis of the learned allocations identifies when local risk is sufficient, leads to an improved closed-form heuristic, and reveals the regimes where a topology-aware learned policy remains necessary.

0.04