Transmission grids are increasingly stressed by the fluctuating nature of renewable energy sources and by increasing electricity demand. Such grids were mainly built for a different generation fleet and load conditions. Grid topology optimization offers the possibility to redistribute power flows by modifying the busbar topology of substations in the grid. However, the combinatorial explosion of feasible busbar configurations makes topology optimization impractical for system operators. This paper proposes a methodology to identify a small subset of high-value busbar topologies to capture the economic benefit of topology optimization across a range of renewable-demand patterns. The optimization model is based on a LPAC approximation of the optimal power flow formulation, and AC-feasibility checks of the optimal topology applied to the IEEE 118-bus test case. In the test case, we select two distinct pairs of substations (46-49 and 24-69) and we optimize their topology separately over 365 clustered timesteps with different wind and load conditions. For each pair, we identify the four most recurrent optimal topologies and evaluate their performance under standard, and congested conditions, with and without a discrete load growth. Results show that selecting from this reduced set of topologies reduces total generation costs by up to 0.147% compared to a plain AC-OPF. In addition, we show the influence of topology optimization on the hosting capacity of selected busbars under discrete load growth. Our findings provide a practical methodology for system operators to select a subset of optimal busbar topologies to be used in their grid for different wind-load conditions, resulting in decreasing generation costs without the computational and operational risks of real-time switching decisions.

Closest papers

Nearest neighbours by meaning across the whole index.

Co-Optimization of Network Topology and Variable Impedance Devices under Dynamic Line Ratings Using Iterative McCormick Relaxation

eess.SY ·2026-10-27 ·Junseon Park, Hyeongon Park, Rahul K. gupta
benchmark similarity 0.68
Abstract

Grid Enhancing Technologies (GETs), such as Network Topology Optimization (NTO), Dynamic Line Rating (DLR), and Variable Impedance Devices (VIDs) are increasingly deployed in power transmission grids to address congestion and improve grid utilization. However, their growing adoption necessitates coordinated operation to fully exploit their benefits. This paper presents a unified co-optimization framework that integrates NTO, DLR, and VID to alleviate congestion and minimize operational costs. NTO is modeled using a node-breaker formulation to provide enhanced switching granularity, while DLR incorporates weather-dependent parameters, including wind speed and ambient temperature, to dynamically adjust transmission limits. The resulting formulation is a mixed-integer nonlinear program due to power flow constraints with bilinear VID terms, and discrete topology decisions. To improve tractability, we propose using a McCormick relaxation approach to linearize bilinear terms. Furthermore, we propose an iterative refinement of the McCormick relaxation scheme to enhance solution accuracy. The proposed framework is validated through detailed analyses on the IEEE 118-bus system, along with additional case studies on other benchmark systems to assess scalability. Results demonstrate that the proposed approach improves solution accuracy compared to standard McCormick relaxation, achieves solution quality close to the nonlinear formulation, and maintains computational efficiency.

0.29

Modeling of Network Constraints in Large-scale Capacity Expansion Optimization of Power Grids

eess.SY math.OC ·2026-08-28 ·Yu Weng, Lara Booth, Priya L. Donti, Ruaridh Macdonald
publishedtheoryhot direction similarity 0.63
Abstract

Capacity expansion modeling plays a critical role in optimizing the deployment of new generation, storage, and transmission, typically at national and regional levels. To support long-term planning, these models consider a large set of energy technologies and policies, along with decades of weather and demand data. Realistic capacity expansion models thus become high-dimensional optimization problems, with hundreds of millions of variables and constraints, which are challenging to solve. A common strategy to address this complexity is to omit non-linear, non-convex AC optimal power flow (ACOPF) constraints and instead use linearized power balance equations or transport formulations. While these simplifications improve tractability, they limit our understanding of how power flow and the physical properties of power networks impact investment decisions across generation, storage, and transmission infrastructure. This paper addresses this gap by extending the GenX capacity expansion model to incorporate fixed point theorem-based network constraints. These embed ACOPF-based considerations while maintaining the tractability of the planning model, nearly preserving the dimensionality of the transport formulation and incurring only modest runtime increases. This approach is much cheaper than embedding ACOPF directly, making it appropriate for large-scale capacity planning problems. We compare our approach to the original transport-based GenX model as well as a non-linear, non-convex version that incorporates the full ACOPF constraints, for a case study of the ISO New England grid.

0.47

Distribution Grid Reconfiguration and Restoration via Linearizable Multi-phase Power Flow Modeling

eess.SY ·2026-10-26 ·Young-ho Cho, Hao Zhu
similarity 0.62
Abstract

Accurate and tractable power-flow (PF) modeling is essential for distribution grid topology optimization, where the presence of discrete branch-status decisions therein significantly increase the computational complexity. To tackle this challenge, we develop a topology-adaptive, low-complexity neural piecewise-linear (N-PWL) PF model. We propose a sequential layer design that can directly incorporate branch status variables into the PF mapping from branch flows to nodal injections. As a result, our N-PWL model not only preserves the PF branch-node consistency but also facilitates the representation of any unseen topologies without retraining. A low-complexity model design is further pursued to attain a linear NN parameter scaling by using a fixed-size area partition of the feeder. The resulting scalable N-PWL model enables mixed-integer linear programming (MILP) formulations of feeder topology optimization tasks, including distribution network reconfiguration (DNR) and restoration ordering problems (ROP). Numerical studies on the unbalanced, multi-phase IEEE 123-bus feeder demonstrate our N-PWL model outperforms existing end-to-end baselines in PF prediction and, more importantly, can fill the gap by achieving accurate representation of any unseen topologies. For solving DNR/ROP, our model can significantly improve the AC feasibility over linearized PF models, with a notable reduction of computation time compared with AC-PF based nonlinear formulations, particularly under a large number of topology decisions.

0.20

Coordinated Conservation Voltage Reduction and Network Topology Reconfiguration in Active Distribution Networks

eess.SY ·2026-10-12 ·Rida Fatima, Hassan Zahid Butt, Xingpeng Li
similarity 0.62
Abstract

Distribution networks rely on conservation voltage reduction (CVR) and network topology reconfiguration (NTR) to manage demand, distributed energy resources (DERs), and tighter operating margins. Yet these strategies are typically deployed independently, despite coupled effects on feeder voltages, losses, and loading. This paper addresses that gap by developing a day-ahead mixed-integer second order cone programming (MISOCP) framework that jointly optimizes feeder head voltage control and network reconfiguration. The formulation incorporates AC branch flow constraints, ZIP load models, DERs, battery energy storage systems, and multi substation radiality. Using modified IEEE 33 bus and 123 bus systems, four configurations isolate the individual and coordinated effects of CVR and NTR. On the 33-bus system under mixed ZIP loading, NTR reduces active energy loss by 2.50%, while coordinated operation reduces it by 2.91% relative to SDN and produces a 2.46% CVR induced active load reduction relative to SDNTR. Under constant impedance loading, coordinated operation reduces active energy loss by 17.65% relative to SDN, while CVR reduces active load by 14.61% relative to SDNTR. DER portfolio scaling shows a nonmonotonic coordinated load reduction response, strongest at 20% penetration and decreasing at higher levels. On the 123 bus system, NTR reduces losses by 19.3%, while CVR reduces voltage dependent load energy by 2.3 to 2.4%. Under loading stress, SDN becomes infeasible at 120% loading, whereas CEDNTR remains feasible. Overall, the results demonstrate complementary, operating condition dependent benefits shaped by load composition, DER portfolio scaling, feeder topology, voltage margins, and source constraints, highlighting the value of joint optimization.

0.29

Network Topology Reconfiguration: Optimal Transition Planning

eess.SY ·2026-08-12 ·Basel Morsy, Jochen Stiasny, Adolfo Anta, Jochen Cremer
similarity 0.62
Abstract · This work has been submitted to the IEEE for possible publication. Copyright may be transferred without notice, after which this version may…

Network topology reconfiguration (NTR) can reduce power system operating costs by co-optimizing generation dispatch and substation switching, but the reported savings describe a target operating point rather than a way to reach it. Reaching this operating point requires a sequence of intermediate operating points, each satisfying the AC power flow equations and thermal limits; because each topology admits its own feasible dispatch region, a naive transition that switches or redispatches first can drive intermediate flows past their thermal limits. Existing methods leave this gap open: snapshot NTR identifies a target but not a route. We formulate the Optimal Transition Planning (OTP) problem, co-optimizing the switching sequence and dispatch trajectory subject to AC feasibility at every intermediate point. We solve this problem with a receding-horizon framework: a DC planner proposes a trajectory that is certified against an AC feasibility filter, and infeasible topologies are excluded using reusable combinatorial cuts. Case studies on congested PGLib-OPF systems up to 1354-bus show that the method produces AC-feasible transitions that reduce operating cost by up to 18.4% compared to the no-switching ACOPF solution on commodity hardware.

0.06

Generation and Transmission Expansion Planning with BESS-Based Virtual Transmission Lines

eess.SY ·2026-10-02 ·Qiushi Wang, Xingpeng Li
similarity 0.62
Abstract · Submitted to Energy Conversion and Economics

This paper proposes a mathematical model for long-term Generation and Transmission Expansion Planning (GTEP) that integrates a relaxed Virtual Transmission Line (VTL) as a Storage in Place of Transmission Asset (SIPTA) strategy to address challenges posed by transmission capacity shortages and system congestion in deregulated power markets, particularly under the rapid growth of renewable energy resources and integrated data centers. The proposed VTL formulation coordinates the operation of the two battery energy storage systems (BESSs) forming a VTL pair by preventing them from charging or discharging simultaneously, thereby providing additional congestion relief without introducing an explicit congestion cost into the objective function. Base case studies on a revised IEEE 24-bus system demonstrate that VTL reduces system congestion compared with the standalone BESS case, achieving a 12.3% reduction in weighted total congestion and up to approximately 67% reduction in congestion on individual transmission branches, with only a 0.3% increase in total planning cost. Furthermore, improvements across multiple congestion metrics indicate that the benefits of VTL extend beyond reducing congested line-hours to reducing congestion rent and N-1 transmission violations in the base case. These results demonstrate the potential of VTL to provide congestion mitigation that complements standalone BESS applications.

0.17

EPIGRIDS: Documentation and Validation of Seven Open Synthetic Transmission Grid Cases

eess.SY math.OC ·2026-11-13 ·Jonathan M. Snodgrass, Scott Greene, Thomas J. Overbye, Christopher L. DeMarco, Bernard C. Lesieutre
benchmark similarity 0.60
Abstract · 10 pages, 2 figures, 6 tables. Submitted to the IEEE Open Access Journal of Power and Energy. Cases: https://doi.org/10.5281/zenodo.23814538…

This paper documents and checks EPIGRIDS, seven open synthetic transmission grid cases from four independently built networks, made with an optimization-based construction method instead of the graph-statistics method behind most large public synthetic grids. The cases range from 250 to 78,484 buses, with geolocated substations, voltages up to 765 kV, and line parameters taken from conductor data. Each ships under an open license in three common power flow formats that agree at the solved operating point, and the six larger cases have a companion hourly, bus-level load series for one year. The Texas, Florida, and Michigan, Ohio, and Indiana cases are sub-networks of the Eastern case. Every case solves an alternating-current power flow from its stored operating point. With parallel circuits merged, the Eastern and Western cases are 9 and 16% denser than the real interconnections, while graph-statistics cases on the same footprints lie within 6% and meet more published realism criteria. A full single-outage contingency analysis completes on every case, and in an optimal power flow benchmark every case except the New England base case and one of its 12 operating points solves in polar form.

0.40

Virtual Transmission Lines from Data Center Workload Migration: Coordinated Multi-Year Transmission Expansion Planning

eess.SY ·2026-10-09 ·Mengxin Zhu, Qian Kai, Yadong Liu, Yingjie Yan, Haoyu Zhao
similarity 0.59
Abstract

The rapid growth of electricity demand from AI data centers is creating a dual mismatch in power systems: a temporal mismatch between fast-rising demand and slow transmission expansion, and a spatial mismatch between concentrated data-center loads and geographically dispersed renewable resources. These mismatches can exacerbate transmission congestion, resulting in unserved data-center load and renewable-energy curtailment. This study models geographic workload migration as a virtual transmission line (VTL) that changes nodal data-center demand without transferring physical electricity. A mixed-integer linear programming model is then developed to co-optimize multi-year candidate-line construction and workload migration, subject to construction delays, renewable-energy curtailment, unserved data-center load, workload-balance requirements, communication-bandwidth constraints, and link-latency limits. The model is evaluated over an eight-year planning horizon on a modified IEEE 14-bus system. The results show that coordinating VTL with physical transmission expansion reduces total system cost, unserved data-center load, and renewable-energy curtailment while alleviating transmission congestion. VTL-aware planning also requires one fewer candidate line than build-only planning. However, VTL alone cannot meet system demand and does not eliminate the need for physical transmission reinforcement. Sensitivity analysis indicates that VTL provides the greatest value when transfer capacity is tight, construction costs are high, load growth is rapid, and data-center flexibility is greater. Additional validation on the IEEE 118-bus system over a five-year planning horizon shows that coordinated planning retains its cost and reliability benefits while reducing physical expansion requirements.

0.06