Grid Enhancing Technologies (GETs), such as Network Topology Optimization (NTO), Dynamic Line Rating (DLR), and Variable Impedance Devices (VIDs) are increasingly deployed in power transmission grids to address congestion and improve grid utilization. However, their growing adoption necessitates coordinated operation to fully exploit their benefits. This paper presents a unified co-optimization framework that integrates NTO, DLR, and VID to alleviate congestion and minimize operational costs. NTO is modeled using a node-breaker formulation to provide enhanced switching granularity, while DLR incorporates weather-dependent parameters, including wind speed and ambient temperature, to dynamically adjust transmission limits. The resulting formulation is a mixed-integer nonlinear program due to power flow constraints with bilinear VID terms, and discrete topology decisions. To improve tractability, we propose using a McCormick relaxation approach to linearize bilinear terms. Furthermore, we propose an iterative refinement of the McCormick relaxation scheme to enhance solution accuracy. The proposed framework is validated through detailed analyses on the IEEE 118-bus system, along with additional case studies on other benchmark systems to assess scalability. Results demonstrate that the proposed approach improves solution accuracy compared to standard McCormick relaxation, achieves solution quality close to the nonlinear formulation, and maintains computational efficiency.

Closest papers

Nearest neighbours by meaning across the whole index.

Grid Topology Optimization for Congestion Management Under High Renewable Penetrations and Discrete Load Growth

eess.SY ·2026-09-13 ·Giacomo Bastianel, Hakan Ergun, Line Roald
similarity 0.68
Abstract

Transmission grids are increasingly stressed by the fluctuating nature of renewable energy sources and by increasing electricity demand. Such grids were mainly built for a different generation fleet and load conditions. Grid topology optimization offers the possibility to redistribute power flows by modifying the busbar topology of substations in the grid. However, the combinatorial explosion of feasible busbar configurations makes topology optimization impractical for system operators. This paper proposes a methodology to identify a small subset of high-value busbar topologies to capture the economic benefit of topology optimization across a range of renewable-demand patterns. The optimization model is based on a LPAC approximation of the optimal power flow formulation, and AC-feasibility checks of the optimal topology applied to the IEEE 118-bus test case. In the test case, we select two distinct pairs of substations (46-49 and 24-69) and we optimize their topology separately over 365 clustered timesteps with different wind and load conditions. For each pair, we identify the four most recurrent optimal topologies and evaluate their performance under standard, and congested conditions, with and without a discrete load growth. Results show that selecting from this reduced set of topologies reduces total generation costs by up to 0.147% compared to a plain AC-OPF. In addition, we show the influence of topology optimization on the hosting capacity of selected busbars under discrete load growth. Our findings provide a practical methodology for system operators to select a subset of optimal busbar topologies to be used in their grid for different wind-load conditions, resulting in decreasing generation costs without the computational and operational risks of real-time switching decisions.

0.24

Coordinated Conservation Voltage Reduction and Network Topology Reconfiguration in Active Distribution Networks

eess.SY ·2026-10-12 ·Rida Fatima, Hassan Zahid Butt, Xingpeng Li
similarity 0.62
Abstract

Distribution networks rely on conservation voltage reduction (CVR) and network topology reconfiguration (NTR) to manage demand, distributed energy resources (DERs), and tighter operating margins. Yet these strategies are typically deployed independently, despite coupled effects on feeder voltages, losses, and loading. This paper addresses that gap by developing a day-ahead mixed-integer second order cone programming (MISOCP) framework that jointly optimizes feeder head voltage control and network reconfiguration. The formulation incorporates AC branch flow constraints, ZIP load models, DERs, battery energy storage systems, and multi substation radiality. Using modified IEEE 33 bus and 123 bus systems, four configurations isolate the individual and coordinated effects of CVR and NTR. On the 33-bus system under mixed ZIP loading, NTR reduces active energy loss by 2.50%, while coordinated operation reduces it by 2.91% relative to SDN and produces a 2.46% CVR induced active load reduction relative to SDNTR. Under constant impedance loading, coordinated operation reduces active energy loss by 17.65% relative to SDN, while CVR reduces active load by 14.61% relative to SDNTR. DER portfolio scaling shows a nonmonotonic coordinated load reduction response, strongest at 20% penetration and decreasing at higher levels. On the 123 bus system, NTR reduces losses by 19.3%, while CVR reduces voltage dependent load energy by 2.3 to 2.4%. Under loading stress, SDN becomes infeasible at 120% loading, whereas CEDNTR remains feasible. Overall, the results demonstrate complementary, operating condition dependent benefits shaped by load composition, DER portfolio scaling, feeder topology, voltage margins, and source constraints, highlighting the value of joint optimization.

0.29

Machine learning-guided real-time AC optimal transmission switching

eess.SY ·2026-10-28 ·Weimin Huang, Weiwei Yang, Bistra Dilkina, Konstantina Mellou, Ishai Menache +3 more
benchmark similarity 0.61
Abstract

The operation of power grids has substantial economic consequences, affecting generation costs and, ultimately, electricity prices. The Optimal Transmission Switching (OTS) problem seeks to reduce these costs by selectively switching off transmission lines. However, OTS gives rise to a challenging mixed-integer nonlinear optimization problem that is difficult to solve at operationally relevant timescales, particularly as rapidly changing loads create a need for real-time switching decisions. To address this challenge, we develop a machine learning-guided method that identifies high quality line switching decisions in real time. Specifically, we construct a grid-specific switching-value model that rapidly estimates the generation-cost reduction associated with opening transmission lines by fine-tuning a pretrained model for AC optimal power flow (AC-OPF). The switching-value model provides signals to guide promising switching decisions, and topologies proposed by the model are evaluated using exact AC-OPF solvers to verify feasibility and obtain the actual generation cost. We develop multiple strategies that use the ML surrogate to efficiently explore the combinatorial space of transmission topologies, including Fixed-Rank Search, Adaptive-Rank Search, and Swap-Enhanced Search. Across multiple benchmark networks, our proposed algorithms identify line switching decisions that significantly reduce generation cost within a 50s computational budget. In particular, under a realistic data center buildout scenario on the 2,000-bus synthetic Texas grid, our approach reduces generation costs by 31.97% and gross nodal load payments by 94.34%. More broadly, our results demonstrate that a fine-tuned surrogate can effectively guide search even without guaranteeing feasibility, enabling classical optimization methods to tackle large nonlinear combinatorial problems on operationally relevant timescales.

0.26

Volt-VAr-Watt Optimization in Four-Wire Low-Voltage Networks: Exact Nonlinear Models and Smooth Approximations - Extended Version

eess.SY ·2026-09-14 ·Sleiman Mhanna, Frederik Geth, Lucas Quiertant, Pierluigi Mancarella
top venue similarity 0.61
Abstract · Extended version of the article published in IEEE Transactions on Power Systems, vol. 41, no. 5, pp. 3663-3677, 2026. DOI: 10.1109/TPWRS.202…

The proliferation of distributed energy resources is increasing the prevalence of both overvoltages and undervoltages in low-voltage (LV) distribution networks. Smart inverter functionalities, such as Volt-VAr and Volt-Watt control, can regulate voltage at the consumer level but are challenging to capture in optimization models due to their nondifferentiability. This paper proposes three nonlinear models for four-wire unbalanced optimal power flow that incorporate these nonsmooth functions without binary or integer variables. The first model encodes these nonsmooth functions directly as user-defined functions using control flow, a feat enabled by many state-of-the-art algebraic modeling languages. The second and third introduce bespoke smooth approximations with tunable approximation errors to address potential numerical issues arising from nondifferentiability, improving reliability while maintaining accuracy. All three methods are evaluated on real four-wire unbalanced LV networks with varying rooftop solar adoption levels, including a 539-bus system with 302 smart inverters. This paper is not only the first to demonstrate accurate, reliable, and tractable Volt-Var-Watt optimization (VVWO) on real four-wire unbalanced LV network models, but it also establishes that optimization-based, non-incremental methods offer superior reliability compared to commonly used incremental (quasi-steady-state) approaches.

0.61

GridForge: A Tractable Network-Flow Method for Constructing Open, Continental-Scale Synthetic Power Grids

eess.SY ·2026-11-12 ·Jonathan M. Snodgrass, Thomas J. Overbye, Christopher L. DeMarco, Bernard C. Lesieutre
similarity 0.61
Abstract · 30 pages, 10 figures, 7 tables; supplementary material as an ancillary file. Submitted to the International Journal of Electrical Power & En…

The goal of this paper is to construct open, continental-scale synthetic transmission grids with an optimization method that stays tractable. Security restrictions keep models of the real grid out of open research and machine-learning datasets, and optimization-based construction is hard at scale: the number of candidate lines grows combinatorially, so electrically faithful methods prune the candidates in advance. This paper presents GridForge, which keeps every bus pair within physical length limits as a candidate, selects lines with Garver's length-weighted network-flow linear program instead of binary decisions, and resizes them with a sequential direct-current (DC) power flow. Two stages of 13 regional networks are evaluated. Their node-degree distributions are nearly as strongly log-linear as those of the real Eastern and Western Interconnections ($R^2$ of 0.92 to 0.98 against 0.971 and 0.981), although the areas under the fitted lines differ from the real ones by 39.9% on average. On the upper Midwest and Tennessee Valley footprints, resizing lowers the DC power-flow loss from 5.89% to 4.14% and from 14.55% to 7.05%, and the DC optimal power-flow loss from 4.03% to 2.02% and from 5.54% to 2.47%. Without relaxing any line limit, the DC optimal power flow is feasible in 78.81% and 0.82% of the scenarios. Most lines are built at 69 kV. The models span 250 to 78,484 buses, were built on single machines, and are freely redistributable.

0.52

Distribution Grid Reconfiguration and Restoration via Linearizable Multi-phase Power Flow Modeling

eess.SY ·2026-10-26 ·Young-ho Cho, Hao Zhu
similarity 0.60
Abstract

Accurate and tractable power-flow (PF) modeling is essential for distribution grid topology optimization, where the presence of discrete branch-status decisions therein significantly increase the computational complexity. To tackle this challenge, we develop a topology-adaptive, low-complexity neural piecewise-linear (N-PWL) PF model. We propose a sequential layer design that can directly incorporate branch status variables into the PF mapping from branch flows to nodal injections. As a result, our N-PWL model not only preserves the PF branch-node consistency but also facilitates the representation of any unseen topologies without retraining. A low-complexity model design is further pursued to attain a linear NN parameter scaling by using a fixed-size area partition of the feeder. The resulting scalable N-PWL model enables mixed-integer linear programming (MILP) formulations of feeder topology optimization tasks, including distribution network reconfiguration (DNR) and restoration ordering problems (ROP). Numerical studies on the unbalanced, multi-phase IEEE 123-bus feeder demonstrate our N-PWL model outperforms existing end-to-end baselines in PF prediction and, more importantly, can fill the gap by achieving accurate representation of any unseen topologies. For solving DNR/ROP, our model can significantly improve the AC feasibility over linearized PF models, with a notable reduction of computation time compared with AC-PF based nonlinear formulations, particularly under a large number of topology decisions.

0.20

Unlocking AI Data Center Interconnection Capacity Through Coordinated Grid and Data Center Flexibility

eess.SY ·2026-10-04 ·Rida Fatima, Xingpeng Li
similarity 0.60
Abstract

The rapid growth of AI data centers is creating concentrated electricity demands that can exceed available distribution network headroom and delay interconnection. This paper investigates whether capacity can be used effectively by coordinating flexibility on both sides of the interconnection. A day-ahead mixed integer second order cone programming framework maximizes feasible AI data center IT capacity using utility side conservation voltage reduction and network topology reconfiguration, together with data center workload shifting and reserve constrained uninterruptible power supply storage. Background feeder demand uses voltage dependent ZIP models, while the data center is modeled as constant power demand using Training, Inference, and Mixed workload profiles. A two-stage solution first maximizes interconnection capacity and then minimizes feeder losses for the retained capacity, with numerical relaxation screening. Studies on a 116-bus model derived from the IEEE 123-node feeder show that, at the constrained bus-60 connection point, grid side flexibility, driven almost entirely by network reconfiguration, increases feasible IT capacity by approximately 42.5-45.0%, while data center flexibility alone provides approximately 2.1-5.4% gains. Coordinated operation increases feasible IT capacity from approximately 10.5-10.6 MW under BASE operation to 15.3-16.0 MW, corresponding to gains of approximately 45.9-50.8%; the 16.0 MW Inference result is limited by the adopted UPS reserve requirement. Benefits are strongly location dependent and influenced by workload flexibility, deferral duration, PUE, UPS energy and reserve requirements, and feeder loading. Under a combined adverse operating condition, FULL capacity decreases by only 3.4% relative to the nominal Mixed case while retaining substantial additional capacity over BASE.

0.08

Polynomial-time algorithms for setting tight big-M coefficients in transmission expansion planning with disconnected buses

cs.DM ·2026-09-08 ·Behnam Jabbari-Marand, Adolfo R. Escobedo
published similarity 0.59
Abstract · 16 pages, 8 figures. Published in Optimization Letters

The increasing penetration of renewable energy and rising electricity demand are driving the need to integrate new buses and transmission lines into transmission grids. These trends are reshaping transmission expansion planning (TEP), motivating the development of effective methodologies to manage the resulting complexity. This paper introduces the longest shortest-path connection (LSPC) algorithm, a graph-based method to enhance the mixed-integer linear programming disjunctive formulation of TEP using valid inequalities (VIs). Traditional approaches for determining big-M coefficients in disconnected TEP networks typically rely on solving the computationally intensive longest path problem (LPP). In contrast, LSPC circumvents these limitations by efficiently identifying relevant power-flow paths between disconnected buses within the expansion network. We demonstrate that the VIs generated from these identified paths dominate those derived from LPP-based methods and other existing approaches.

0.55