Transmission Expansion with Large, Discrete Data Center Realization Uncertainty

Lin Dong, Samuel Talkington, Le Xie

eess.SY ·submitted 2026-11-04 04:50 UTC · v1

Abstract

Large data center projects introduce a distinct transmission planning uncertainty because of their large scale, discrete project realization nature, and strong locational impacts on the transmission network. On the one hand, conventional deterministic treatments can either overbuild the network by assuming that all candidate projects materialize; on the other, they can leave the system underprepared by prematurely screening out projects. This paper develops a project-realization-based framework for systematically modeling, planning, and evaluating transmission expansion under uncertain data center realization. Candidate data center projects are represented through alternative realization scenarios and associated probabilities, enabling different planning strategies to be modeled and quantitatively assessed under a common framework. Within this framework, numerical case studies demonstrate the effectiveness of the proposed framework and the benefits of stochastic planning approach. The results show that stochastic planning can use realization probabilities to hedge multiple plausible futures, providing a more balanced tradeoff between transmission investment and reliability exposure than deterministic approaches under correctly specified and misspecified realization probabilities.

Closest papers

Nearest neighbours by meaning across the whole index.

Transmission Expansion and Energy Storage Planning under Great Britain's Uncertain Energy Transition Pathways

eess.SY math.OC ·2026-11-17 ·Shengming Cao, Runsheng He, Waqquas Bukhsh
benchmark similarity 0.59
Abstract · 49 pages, 10 figures

Long term power system planning must account for uncertainty in electricity demand and generation, while recognising the different investment and commissioning characteristics of transmission and energy storage. This paper develops a multi year stochastic framework for coordinated transmission expansion and energy storage planning and applies it to the Great Britain electricity system to assess investment needs through to 2050. The framework integrates multiple energy transition pathways with an enhanced representation of the GB transmission network and captures the different characteristics of transmission and storage investment over time. The coordinated treatment of transmission and storage is considered as a system level benchmark rather than a centralised investment mechanism. In GB, transmission investment is subject to regulated forward looking planning, while storage is largely developed by market participants in response to market signals. The framework therefore quantifies the potential value of improved coordination and identifies where existing investment signals may not encourage complementary storage deployment. Results across alternative transmission only, storage only and coordinated investment strategies show substantial benefits from joint planning. Compared with transmission only planning, coordinated investment reduces additional transmission capacity by 2%, cumulative expected load shedding by 97%, and total expected system cost by 36%, primarily through avoided unserved energy. Transmission preparation periods affect the timing, but not the final portfolio, of investments. Finally, the energy transition pathway materially influences investment requirements, with Electrification and Efficiency requiring 7% more transmission capacity and 45% more storage energy capacity than Falling Behind.

0.21

Impact of Data Center Load on Co-Optimized Generation and Transmission Expansion Planning with Embedded Unit Commitment

eess.SY ·2026-10-13 ·Haoxiang Wan, Xingpeng Li, Jonghwan Kwon
published similarity 0.57
Abstract · 6 pages, 2 figures, 3 tables. Accepted to the 2027 IEEE Texas Power and Energy Conference (TPEC)

The rapid growth of hyperscale data centers challenges grid expansion planning, yet existing studies focus largely on operational flexibility rather than long-term investment decisions. This paper examines how large data center loads sited at multiple buses affect co-optimized Transmission Expansion Planning (TEP) and Generation Expansion Planning (GEP). The problem is formulated as a multi-year, Unit Commitment (UC)-embedded mixed-integer linear program on the modified IEEE 24-bus Reliability Test System (RTS-24) with Electric Reliability Council of Texas (ERCOT)-calibrated renewable energy profiles. A 500 MW data center load, about 17.5% of the base-year peak, is allocated across four buses by voltage level, generation headroom, renewable co-location, and network connectivity. Integrating this load raises the 15-year net present value of total system cost by 1,794 million USD (+61.6%) and the system-average locational marginal price (LMP) by 45.2%, with operating cost dominating capital investment (84.2% versus 15.8%). Renewable curtailment remains negligible: existing renewables are already near full utilization, so the added demand is served almost entirely by incremental thermal generation. Most notably, the load shifts the optimal plan from transmission-only to generation-only, replacing the base-case 230 kV reinforcement with a new 400 MW combined-cycle gas turbine and showing that strategically sited generation can substitute for network reinforcement.

0.47

U.S. Data Center Growth Through 2030: A Critical Review of Grid Adequacy and Transmission Expansion Planning

eess.SY ·2026-11-10 ·Babak Porkar, Mona Ghassemi
hot direction similarity 0.56
Abstract

The growth of large data centers raises questions about both supply adequacy and the suitability of load representations used in connection studies. This paper critically reviews the U.S. demand, generation, and transmission outlook through 2030 and examines the implications for transmission expansion planning (TEP). Comparison of public forecasts highlights distinctions among annual average demand, peak demand, and grid connection capacity. National generating-capacity totals cannot establish a dependable surplus because resource availability, regional adequacy, transmission constraints, and project timing determine supply capability. Recent grid events and published dynamic studies demonstrate that faults can trigger substantial data-center transfers to backup supply, followed by delayed or coordinated demand recovery. These behaviors require appropriate representation within the conventional planning framework, alongside assessment of the requested maximum grid import. The selected literature reveals limited integration of validated data-center dynamic models into the technical screening and economic comparison of expansion alternatives. The review identifies the need to establish whether fault response and recovery change feasible connection capacity, required reinforcement, or the preferred transmission investment.

0.28

Virtual Transmission Lines from Data Center Workload Migration: Coordinated Multi-Year Transmission Expansion Planning

eess.SY ·2026-10-09 ·Mengxin Zhu, Qian Kai, Yadong Liu, Yingjie Yan, Haoyu Zhao
similarity 0.55
Abstract

The rapid growth of electricity demand from AI data centers is creating a dual mismatch in power systems: a temporal mismatch between fast-rising demand and slow transmission expansion, and a spatial mismatch between concentrated data-center loads and geographically dispersed renewable resources. These mismatches can exacerbate transmission congestion, resulting in unserved data-center load and renewable-energy curtailment. This study models geographic workload migration as a virtual transmission line (VTL) that changes nodal data-center demand without transferring physical electricity. A mixed-integer linear programming model is then developed to co-optimize multi-year candidate-line construction and workload migration, subject to construction delays, renewable-energy curtailment, unserved data-center load, workload-balance requirements, communication-bandwidth constraints, and link-latency limits. The model is evaluated over an eight-year planning horizon on a modified IEEE 14-bus system. The results show that coordinating VTL with physical transmission expansion reduces total system cost, unserved data-center load, and renewable-energy curtailment while alleviating transmission congestion. VTL-aware planning also requires one fewer candidate line than build-only planning. However, VTL alone cannot meet system demand and does not eliminate the need for physical transmission reinforcement. Sensitivity analysis indicates that VTL provides the greatest value when transfer capacity is tight, construction costs are high, load growth is rapid, and data-center flexibility is greater. Additional validation on the IEEE 118-bus system over a five-year planning horizon shows that coordinated planning retains its cost and reliability benefits while reducing physical expansion requirements.

0.06

Stochastic Distribution Network Reconfiguration under Load Uncertainty

eess.SY ·2026-10-08 ·Celso Cavellucci, Fábio Luiz Usberti
similarity 0.55
Abstract

This paper investigates distribution network reconfiguration under demand uncertainty using a two-stage stochastic formulation. The network topology is selected in the first stage, whereas the electrical variables are determined separately for each scenario. The deterministic equivalent is formulated as a MISOCP problem that accounts for power balances, losses, voltage constraints, and radiality. Experiments on 12 networks, ranging from 17 to 10,561 nodes, consider three demand scenarios. Reconfiguration reduced expected losses in all instances, with reductions ranging from 3.23% to 65.23% and averaging 31.76%, while also reducing the number of voltage violations in the ex post evaluation by approximately 55%. Eleven of the 12 problems were solved to optimality within the prescribed time limit. However, the additional benefit of stochastic modeling was negligible because of the homothetic structure of the scenarios considered, which preserves the spatial distribution of loads. The results show that spatially heterogeneous scenarios are important for the representation of uncertainty to meaningfully affect reconfiguration decisions.

0.27

Trust-Region Benders for Scalable Multiperiod Expansion Planning for Transmission and Storage

eess.SY ·2026-10-23 ·Kevin Wu, Rabab Haider, Pascal Van Hentenryck
published similarity 0.53
Abstract · Presented at PowerUp 2026, September 9-11, 2026, Boulder, Colorado

Transmission expansion planning (TEP) seeks to identify cost-effective investment strategies that enable power systems to reliably meet future demand, while accounting for the location, timing, and operational impacts of infrastructure upgrades. As demand grows and renewable penetration increases, there is growing interest in jointly modeling energy storage investments to enhance operational flexibility. This work presents a multiperiod formulation that co-optimizes transmission reconductoring and energy storage installation across multiple planning periods. To solve the resulting large-scale problem efficiently, a Benders decomposition with per-period trust-region stabilization and a relaxation-based warm-start procedure is proposed. The approach is demonstrated on a 2,000-bus Texas system, producing an investment plan spanning 2030-2045 with optimality gap below 1.0%, and is compared against a rolling-horizon approach to highlight the benefits of multiperiod coordination.

0.29

Post-Hoc Conformal Prediction for Reliable Wireless Communications

eess.SP ·2026-09-22 ·Xin Su, Meiyi Zhu, Osvaldo Simeone, Carlo Fischione
similarity 0.51
Abstract

Deploying artificial intelligence (AI) in high-stakes wireless applications such as autonomous transportation requires guarantees of reliable operation. Such guarantees can often be obtained by designing systems that act on a set of predictions via conservative policies catering to all possible outcomes within the set. For instance, in location-based beam selection, a base station may identify a set of plausible locations and select a beam that ensures high capacity over the set. The miscoverage probability of the set with respect to the true outcome (e.g., the true user location) then quantifies the outage probability, while the size of the set determines the final performance or resource budget (e.g., the transmission capacity). Conventional conformal prediction (CP) applies when the target miscoverage level is prescribed in advance. However, in practical wireless systems, prediction sets may instead be selected under prescribed operational constraints, requiring the resulting miscoverage probability to be quantified post hoc. This paper develops a formal statistical framework for the data-driven selection of prediction sets that provides a reliable estimate of the resulting miscoverage probability. The methodology builds on backward CP and probably approximately correct CP, yielding distribution-free reliability guarantees on the miscoverage probability. We apply the framework on three distinct wireless applications: narrowband interference detection, near-field localization, and codebook-based beam identification. Numerical results validate the reliability guarantees and show that the proposed post-hoc conformal methods achieve accuracy comparable to the naive probability-based approach across all considered applications.

0.38

Congestion Price Uncertainty From Interconnection Queue by Monte Carlo Sampling

eess.SY ·2026-10-14 ·William A. Wheeler, Samuel Chevalier, Amritanshu Pandey
similarity 0.51
Abstract · 8 pages, 9 figures

The generation interconnection queue adds discrete uncertainty to power grid congestion price estimates on the project planning timescale. The conventional approach to this uncertainty is to make an informed guess of the single or few most likely configurations of generators that interconnect. In this paper, we show that Monte Carlo sampling is a more effective alternative. Given an estimate of the joint probability distribution of generator interconnections, a small number of samples yields good estimates of the congestion distribution. Crucially, this problem is not about rare events, but rather about the expected congestion over the worst times of the year, which makes congestion a common outcome over the distribution of interconnection events. We give empirical results on a 2000-bus network, averaging price outcomes from security-constrained DCOPF over eight different loading scenarios. For each line and contingency of the network, we estimate the full distribution as well as mean price and probability of exceeding a price threshold. Single-point estimates are unreliable and can be misleading about whether a line is likely to be congested. Combining the top k probability configurations yields improved estimates; however, sampling the same number from a distribution gives a more robust result of similar accuracy, as well as error estimates. Including correlation in the distribution model introduces small changes, showing that standard Bernoulli distributions suffice in most cases. The sampling approach is also applicable to large-load interconnection and should be of interest for planning both generation and large-load projects.

0.31