Abstract
We study the minimum total busy time problem: jobs with fixed processing intervals must be assigned to identical machines, each of which can process at most g jobs at a time, so that the total time during which the machines are busy is minimized. The problem is NP-hard already for g=2, and, to the best of our knowledge, no approximation ratio below 2 was known for general instances with g=2, where the ratio 2 is attained by giving every job its own machine. We present a combinatorial 3/2-approximation algorithm for g=2. The algorithm applies the two-phase local-ratio technique to the known pair formulation of the problem, processing the overlapping job pairs in order of the right ends of their overlaps. The cost of its schedule is at most $L-λ/2$, where L is the total processing time and $λ$ is the optimal value of the linear relaxation of the pair formulation; hence the integrality gaps of this relaxation and of the configuration LP are at most 3/2. The result extends to temporal bin packing with items larger than one third of the bin capacity. For general g, we show that optimal schedules correspond exactly to maximum-weight forests of a special kind, which we call g-caterpillar forests; this yields an exact integer program and a linear relaxation of polynomial size for every fixed g. We also observe that securing a (1-1/g) fraction of the optimal savings suffices for a (2-1/g)-approximation. On random instances with g=2, evaluated with exact optima or tight lower bounds obtained from the pair formulation, the average ratio of the algorithm to the optimum is at most 1.075 for 100 jobs and at most 1.070 for 200 jobs.