Integrated Transmission and Distribution Expansion Planning Considering Customer Actions and Distributed Energy Resources

Abhinav Ayri, Haotian Yao, Mostafa Farrokhabadi, Hamidreza Zareipour

eess.SY ·submitted 2026-08-30 18:20 UTC · v1
published

Abstract

The continued integration of distributed energy resources (DERs) motivates research into integrated system planning. While existing literature shows that DERs can reduce system costs, it often overlooks customer behaviour, particularly DER adoption driven by cost savings and incentives. System cost allocation can influence these decisions, affecting DER uptake, grid injections, and overall system efficiency. Therefore, integrated system planning should consider both system- and customer-level benefits of DERs. This paper proposes a multi-step framework that combines an integrated planning model with cost allocation and retailer business models. The integrated planning model minimizes total system costs subject to network constraints, while the cost allocation and retailer models capture customer responses to costs and DER opportunities. By coordinating these models, the framework represents how customer behaviour influences planning outcomes. The proposed approach is demonstrated on a 36-bus system, with results showing that incorporating customer decision-making reduces overall system costs, lowers reliance on transmission-connected generation, and supports more realistic system planning.

Comment
5 pages, 5 figures 5 equations, accepted for presentation at the CIGRE Energy conference happening on September 21 to September 24 in Calgary, Alberta, Canada

Closest papers

Nearest neighbours by meaning across the whole index.

Impact of Data Center Load on Co-Optimized Generation and Transmission Expansion Planning with Embedded Unit Commitment

eess.SY ·2026-10-13 ·Haoxiang Wan, Xingpeng Li, Jonghwan Kwon
published similarity 0.61
Abstract · 6 pages, 2 figures, 3 tables. Accepted to the 2027 IEEE Texas Power and Energy Conference (TPEC)

The rapid growth of hyperscale data centers challenges grid expansion planning, yet existing studies focus largely on operational flexibility rather than long-term investment decisions. This paper examines how large data center loads sited at multiple buses affect co-optimized Transmission Expansion Planning (TEP) and Generation Expansion Planning (GEP). The problem is formulated as a multi-year, Unit Commitment (UC)-embedded mixed-integer linear program on the modified IEEE 24-bus Reliability Test System (RTS-24) with Electric Reliability Council of Texas (ERCOT)-calibrated renewable energy profiles. A 500 MW data center load, about 17.5% of the base-year peak, is allocated across four buses by voltage level, generation headroom, renewable co-location, and network connectivity. Integrating this load raises the 15-year net present value of total system cost by 1,794 million USD (+61.6%) and the system-average locational marginal price (LMP) by 45.2%, with operating cost dominating capital investment (84.2% versus 15.8%). Renewable curtailment remains negligible: existing renewables are already near full utilization, so the added demand is served almost entirely by incremental thermal generation. Most notably, the load shifts the optimal plan from transmission-only to generation-only, replacing the base-case 230 kV reinforcement with a new 400 MW combined-cycle gas turbine and showing that strategically sited generation can substitute for network reinforcement.

0.47

Data-center growth impacts household electricity costs more through wholesale prices than through grid reinforcement

eess.SY econ.GN ·2026-11-11 ·Lingdong Zhou, Wenjia Xia, Jiyu Wang, Fei Ding, Xiangqi Zhu
hot direction similarity 0.60
Abstract · 22 pages, 8 figures, 1 table. Lingdong Zhou and Wenjia Xia contributed equally to this work

Rapid data-center expansion is raising concerns about electricity affordability, yet how the costs of serving these large new loads reach residential customers remains poorly understood. Here, we quantify the potential impact of 371 announced Texas data-center projects, totaling 38.9 GW by 2030, on residential electricity costs by linking power system expansion, wholesale electricity markets, transmission reinforcement, and retail cost allocation. We find that accommodating this demand increases modeled residential electricity costs in one representative case by 1.64 cents/kWh, with 68% arising from higher wholesale electricity prices and 32% from regulated transmission charges. Allowing new gas generation near data centers reduces the 2023 residential cost increase to 0.92 cents/kWh, whereas excluding data centers from the transmission cost-sharing base raises it to 1.87 cents/kWh. These findings reveal that the residential cost burden of data-center growth is driven primarily by wholesale electricity price increases, rather than direct transmission investment costs, and depends critically on generation siting, infrastructure planning, and cost allocation.

0.29

Generation and Transmission Expansion Planning with BESS-Based Virtual Transmission Lines

eess.SY ·2026-10-02 ·Qiushi Wang, Xingpeng Li
similarity 0.57
Abstract · Submitted to Energy Conversion and Economics

This paper proposes a mathematical model for long-term Generation and Transmission Expansion Planning (GTEP) that integrates a relaxed Virtual Transmission Line (VTL) as a Storage in Place of Transmission Asset (SIPTA) strategy to address challenges posed by transmission capacity shortages and system congestion in deregulated power markets, particularly under the rapid growth of renewable energy resources and integrated data centers. The proposed VTL formulation coordinates the operation of the two battery energy storage systems (BESSs) forming a VTL pair by preventing them from charging or discharging simultaneously, thereby providing additional congestion relief without introducing an explicit congestion cost into the objective function. Base case studies on a revised IEEE 24-bus system demonstrate that VTL reduces system congestion compared with the standalone BESS case, achieving a 12.3% reduction in weighted total congestion and up to approximately 67% reduction in congestion on individual transmission branches, with only a 0.3% increase in total planning cost. Furthermore, improvements across multiple congestion metrics indicate that the benefits of VTL extend beyond reducing congested line-hours to reducing congestion rent and N-1 transmission violations in the base case. These results demonstrate the potential of VTL to provide congestion mitigation that complements standalone BESS applications.

0.17

Market Efficiency and Capacity Investment under Flexible Price-Making Loads: A Computational Study

eess.SY ·2026-10-30 ·Aron Brenner, Deepjyoti Deka, Saurabh Amin
similarity 0.56
Abstract

Large flexible loads such as data centers can shift consumption across locations and hours to lower their bills. We model a price-making consumer leading the system operator in a Stackelberg game and compare its shifts with a cost-minimizing planner's over a simulated RTS-GMLC year. Strategic temporal and spatial shifting capture 75% and 93% of the planner's savings, forgoing the rest mostly by withholding flexibility to protect favorable prices. Scarce capacity and abundant renewables raise this share for temporal shifting; scarce transmission lowers it for spatial shifting. Temporal and spatial flexibility substitute for thermal and transmission capacity, respectively, and complement renewables.

0.24

Spatial LLM Workload Shifting Needs Foresight: Model Commitment for AI Data Center Operation under Power Grid Constraints

eess.SY ·2026-09-09 ·Bojun Du, Hongyang Jia, Tonghui Li, Qingchun Hou, Ze Wang +2 more
similarity 0.56
Abstract · 3 pages, 2 figures

AI data centers may face power supply shortages during certain periods, requiring operators to shift large language model (LLM) inference workloads spatially to maintain service rates. However, existing workload-shifting methods typically assume that any data center with sufficient computing resources can immediately serve shifted requests, which may lead to infeasible transfers and unserved demand. This letter proposes model commitment (MC), a mixed-integer linear programming framework that jointly schedules model deployment and cross-site request routing under power constraints and electricity-price signals. First, MC formulates the intertemporal coupling introduced by model replica loading. Second, it translates prefill and decode latency requirements into the amount of demand that each replica can serve. Case studies based on real-world data show that MC enables AI data center operators to achieve a 100% service rate under time-varying grid conditions and reduce total operating cost by 29.0%.

0.44

Optimal Coordination of Multiple Ancillary Service Provisions in Active Distribution Networks

eess.SY ·2026-11-14 ·Xinbao Jia, Yi Guo, Ognjen Stanojev, Zhen Chen, Yuning Jiang +1 more
similarity 0.56
Abstract · 16 pages

We propose a multi-rate model predictive control (MPC) framework for coordinating primary frequency control (PFC), automatic generation control (AGC), and voltage control (VC) in active distribution networks. The framework allocates distributed energy resource (DER) flexibility among these three ancillary services while retaining their different update rates. To account for the intertemporal flexibility of electric vehicle aggregations and aggregations of buildings with thermostatically controlled loads (TCLs), we incorporate time-varying power-energy envelopes into our multi-rate MPC formulation. These constraints couple the combined PFC and AGC response to the demand-side flexibility available later in the prediction horizon. Furthermore, the input-multirate structure enables coordinated ancillary service provision by DERs with different response dynamics. The controller optimizes the three services together, allowing fast regulation to be coordinated with the developing slow response within the available DER flexibility. We demonstrate the coordinated provision of the three ancillary services through closed-loop simulations on a modified IEEE 33-bus system using a nonlinear differential-algebraic model.

0.26

Prosumer Synchronisation Risk: Impacts of Time-Varying Tariffs on Distribution Network Expansion

eess.SY ·2026-09-02 ·Dillon Zadoks, Alfredo Oneto, Carlo Tajoli, Yi Guo, Philipp Heer +2 more
published similarity 0.56
Abstract

The rapid deployment of distributed energy resources, including heat pumps, electric vehicles, photovoltaics, and battery storage, is reshaping the operation of low-voltage networks. While distribution system operators often aim to develop time-varying tariffs to incentivise network-friendly behaviour and defer reinforcements, they risk triggering prosumer synchronisation. As prosumers follow price signals, their behaviour may synchronise, avoiding existing load peaks while creating undesirable peaks at other times. This paper quantifies the impact on low-voltage network reinforcement needs when shifting from flat tariffs to two time-varying tariffs: Time-of-Use and Real-Time Pricing. Applying a mixed-integer linear model across 471 low-voltage reference networks in Switzerland, we evaluate expansion requirements under projections of distributed energy resource deployment for 2050. In the model, prosumers operate their distributed energy resources in accordance with their subscribed electricity tariff to minimise costs, and the distribution system operator subsequently optimises reinforcements. Our results demonstrate that while adopting time-varying tariffs can reduce reinforcement investment costs by more than 50%, high adoption rates can reverse this declining trend. Specifically, once prosumer adoption exceeds the optimal thresholds of 50% for Time-of-Use and 40% for Real-Time Pricing, reinforcement needs increase by 39% and 134%, respectively, for an additional 20% of tariff adoption.

0.24

Planning electric bus systems with solar photovoltaic integration using open transit data: A case study of the Dakar BRT

eess.SY ·2026-09-24 ·Jérémy Dumoulin, Cheikh Mouhamed Fadel Kebe, Babacar M. Ndiaye, Noémie Jeannin, Christophe Ballif +1 more
code/data similarity 0.55
Abstract

Electrification of urban bus systems is expected to accelerate due to its clear environmental benefits. However, effective electric bus deployment requires planning tools that can support decision-making on electrification strategies while balancing operational feasibility, costs, environmental benefits, and impacts on the local electricity grid. Such planning depends on the availability of detailed transit data, which remain scarce in many cities, particularly in developing countries. To address this gap, we present GTFS4EV, an open-source framework that uses publicly available General Transit Feed Specification (GTFS) data to simulate bus operations and evaluate electrification scenarios. The framework provides quantitative insights across multiple dimensions. It estimates the minimum onboard battery capacity required for each bus, alongside charging infrastructure needs, economic and environmental impacts, and the potential for solar photovoltaic integration. We apply the framework to the Dakar Bus Rapid Transit system, comparing three charging strategies ("Depot only", "Terminal and depot" and "Terminal only") across different levels of PV capacities. Results show that the "Terminal and depot" strategy reduces the minimum onboard battery capacity from 285 to 57 kWh per bus, and the maximum charging load from 5.3 to 1.5 MW relative to the "Depot only" strategy. The "Terminal only" also provides benefits compared to the "Depot only", although it requires larger onboard battery capacities (155 kWh). Moreover, combining opportunity charging with solar photovoltaics reduces the charging costs by up to 46% relative to grid charging only. The study demonstrates how GTFS data can be leveraged to support electric bus planning and photovoltaic integration in data-scarce contexts.

0.26