Reliability Value of Long-Duration Energy Storage against Extreme Events in High-Renewable Grids: A Full-Year AC-OPF Assessment

Jeongdong Kim, Jonggeol Na, Sungho Shin

eess.SY ·submitted 2026-09-06 22:31 UTC · v1

Abstract

Long-duration energy storage (LDES) can mitigate prolonged renewable--load imbalances during Dunkelflaute events, but existing studies rely on zonal or linearized DC network models and inadequately analyze the operational feasibility of the grid across a wide range of full-year renewable, load, and contingency scenarios. To address this gap, this paper introduces a multi-period alternating-current optimal power flow (AC-OPF) formulation that captures the full nonlinear network physics and assesses the reliability value of LDES in high-renewable grids. To evaluate scarcity events spanning multiple days to weeks, full-year operation is modeled as an 8,760-h load-shedding minimization over scenarios sampled from a Gaussian copula model, fitted to 2010--2025 historical wind and bus-level load data, that represents both typical variability and tail events. On a synthetic 200-bus Illinois transmission network, a hybrid fleet of battery energy storage (BESS) and LDES with 50 MW total power reduces annual load shedding by 83.0% on average relative to the base network, versus 68.5% for short-duration BESS alone at equal power. To further account for unexpected line outages throughout the year, the formulation is extended to a multi-day security-constrained AC-OPF. Under N-1contingencies, no feasible operating solution is obtained for the base network, whereas the LDES-equipped network remains feasible in all considered cases, thereby saving the cost of additional generation and transmission capacity. During the contingency period, LDES acts as a backup power supply, requiring only 5.5% more generation on average than the no-contingency base case.

Comment
39 pages, 12 figures

Closest papers

Nearest neighbours by meaning across the whole index.

Risk Assessment of Fair Multi-Period Dynamic Operating Envelopes under Uncertainty

eess.SY cs.CE ·2026-10-30 ·Pedro Salomão Quessongo, Daniel Gebbran, Wilhiam de Carvalho, Clodomiro Unsihuay-Vila
published similarity 0.69
Abstract

Dynamic operating envelopes (DOEs) can allocate time-varying export capacity to distributed energy resources (DERs), and while they are not intended to make operations immune to voltage violations, they should guide operations to mostly remain inside expected values under changing regimes and residual forecast errors. However, although recent literature proposed many different techniques for implementing DOEs, there is sparse discussion of analyzing and quantifying the risk of using more or less conservative DOEs under uncertain operating regimes. Having this gap in mind, this paper develops a risk-oriented extension of a previously established fair distributed multi-period optimal power flow (OPF) framework, where fair or technical DOEs are fixed as first-stage decisions and the OPF leverages battery energy storage and renewable curtailment as recourse under regime uncertainties. An independent nonlinear AC power flow then computes a resulting ensemble, which is summarized by (i) voltage-violation probability, severity, and a persistence metric for consecutive out-of-band hours, (ii) curtailment and Jain and Gini indices, and (iii) model deviations. Different probability situations are assessed, ranging from uniform, sunny-heavy, night-peak-heavy, and adversarial, which separate the envelope design from the assumed operating distribution. An optional outer loop allows for fine-tuning a fairness--efficiency parameter under explicit violation and persistence budgets. The combination of the outer loop and the overall framework, which quantifies how often and how severely operating limits are exceeded, creates an auditable methodology mixing equitable export allocation, distributed recourse, and AC risk assessment for active distribution network operators, and this framework is assessed using up to 1000 Monte Carlo scenarios per mixture and DOE design.

0.35

Impact of Wind-Solar-Battery Growth on Electricity Prices: Reserve Scarcity and Transmission Congestion

eess.SY ·2026-11-14 ·Haoxiang Wan, Ivan Castillo, Xingpeng Li
similarity 0.67
Abstract · 7 pages, 3 figures, 2 tables. Submitted to IEEE GECA 2027

This paper asks whether sequential wind, solar, and battery storage additions that eliminate unserved energy also remove modeled reserve scarcity and transmission congestion. Thirty-one cumulative portfolio states are evaluated on a modified IEEE 24-bus system for a constructed stressed day using a 24-hour day-ahead unit commitment model with network constraints, co-optimized energy and upward reserve, chronological battery storage, and an approximation of the Electric Reliability Council of Texas operating reserve demand curve. The thermal baseline has 106 MWh of unserved energy, whereas 450 MW of wind is sufficient to serve all demand. However, with 1,500 MW of wind, the hourly modeled reserve scarcity price still reaches \$5,000/MWh because wind output declines after the system peak. Adding 1,800 MW of solar reduces the load weighted daily average modeled reserve scarcity price from \$1,136.2/MWh to \$101.2/MWh and confines modeled reserve scarcity to three evening hours. Adding 250 MW/1,000 MWh of battery storage further lowers the average to \$4.3/MWh and reduces wind curtailment from 631 MWh to 306 MWh. Transmission congestion nevertheless remains: all residual wind curtailment occurs at bus 21, wind capture prices at buses 21 and 23 differ by \$31.8/MWh, and identical battery storage plants yield normalized net energy market revenues of \$201/(MW$\cdot$day) and \$121/(MW$\cdot$day) at buses 19 and 21, respectively. These results show that unserved energy, modeled reserve scarcity, and locational congestion effects measure distinct operating conditions and should be evaluated separately but interpreted together.

0.27

Fair Dynamic Operating Envelopes using Distributed Multi-Period Optimal Power Flow and Jain Index for Active Distribution Networks

eess.SY cs.CE ·2026-08-24 ·Pedro Salomão Quessongo, Daniel Gebbran, Clodomiro Unsihuay-Vila
similarity 0.65
Abstract · 10 pages, submitted to CLAGTEE 2026 Conference

Dynamic operating envelopes (DOEs) are increasingly used to publish time-varying export limits that keep distribution networks within operational limits. Purely technical DOE allocation, however, can systematically privilege electrically favorable prosumers, while embedding fairness directly into a single-period optimal power flow (OPF) objective mixes network feasibility, equity and efficiency in a way that obscures the cost of fairness. This paper proposes a two-stage, multi-period framework that addresses both of these. Initially, a technical distributed OPF computes network-feasible export envelopes. The subsequent stage then applies a dynamic aggregate export budget and redistributes capacity through cumulative proportional fairness, limiting the additional curtailment by an admissible efficiency budget. The resulting fair DOEs are treated as first-stage decisions, while battery storage provides scenario-dependent recourse under demand and renewable uncertainty. The operational problem is solved by a calibrated regional alternating direction method of multipliers (ADMM) on a lossless LinDistFlow model and independently validated using AC power flow. We observe a trade-off between increases in curtailment \emph{versus} improvements on fairness, as expected, reaching Jain fairness indices close to unity. Results show that considering both storage (which alleviates curtailment impact) and multi-period fairness (which increases curtailment) is an interesting approach for modern DOE design, which in turn requires a multi-period, co-designed approach.

0.54

Modeling of Network Constraints in Large-scale Capacity Expansion Optimization of Power Grids

eess.SY math.OC ·2026-08-28 ·Yu Weng, Lara Booth, Priya L. Donti, Ruaridh Macdonald
publishedtheoryhot direction similarity 0.65
Abstract

Capacity expansion modeling plays a critical role in optimizing the deployment of new generation, storage, and transmission, typically at national and regional levels. To support long-term planning, these models consider a large set of energy technologies and policies, along with decades of weather and demand data. Realistic capacity expansion models thus become high-dimensional optimization problems, with hundreds of millions of variables and constraints, which are challenging to solve. A common strategy to address this complexity is to omit non-linear, non-convex AC optimal power flow (ACOPF) constraints and instead use linearized power balance equations or transport formulations. While these simplifications improve tractability, they limit our understanding of how power flow and the physical properties of power networks impact investment decisions across generation, storage, and transmission infrastructure. This paper addresses this gap by extending the GenX capacity expansion model to incorporate fixed point theorem-based network constraints. These embed ACOPF-based considerations while maintaining the tractability of the planning model, nearly preserving the dimensionality of the transport formulation and incurring only modest runtime increases. This approach is much cheaper than embedding ACOPF directly, making it appropriate for large-scale capacity planning problems. We compare our approach to the original transport-based GenX model as well as a non-linear, non-convex version that incorporates the full ACOPF constraints, for a case study of the ISO New England grid.

0.47

Co-Optimized Generation, Transmission, and Storage Expansion: System Value and Optimal Duration of Pumped-Storage Hydropower

eess.SY math.OC ·2026-08-27 ·Rafael Benchimol Klausner, Rafael Kelman
similarity 0.62
Abstract

Expansion planning models usually fix storage duration before optimization, setting how much storage power to build but not for how long it can discharge. We present a generation-transmission-storage expansion framework in which candidates of many durations compete on annualized cost, making the duration mix an optimization outcome. It is a rolling-horizon, two-stage stochastic linear program, each five-year stage is a full year at hourly resolution under ten coherent inflow, wind, and solar scenarios. We apply it to the Brazilian Interconnected System over 2030-2050, where demand roughly doubles to 1,716 TWh/year and variable renewable energy (VRE) supplies most new capacity. Two cases are compared: 36 pumped-storage hydropower (PSH) candidates over four subsystems and nine durations (4-144 h) alongside 4-h battery energy storage systems (BESS), and BESS alone. With PSH available, the model builds 31.2 GW / 755 GWh of PSH and no BESS, dominated by 12-h capacity with 4.9 GW of 72-h units. Without PSH it builds 38 GW / 152 GWh of BESS and 7.8 GW more gas-fired capacity, mostly open-cycle peakers. PSH lowers 2050 annualized system cost by US$ 5.0 billion/year (6.8%), operating cost by 23.5%, thermal generation by 34 TWh/year, and long-run marginal cost by 20%; 2035 VRE curtailment falls from 8.4% to 3.2%. The magnitudes are specific to Brazil, but the underlying mechanism is general: limiting storage candidates to a single duration understates the system's optimal energy-storage requirement and overstates its residual need for thermal capacity.

0.30

Assessing Modeling Fidelity for Long-Term Battery Energy Storage Planning: Operation, Degradation, and Temporal Representation

eess.SY ·2026-09-30 ·Hassan Zahid Butt, Xingpeng Li
similarity 0.61
Abstract

Long-term battery energy storage system (BESS) planning often relies on simplified degradation, operational, and temporal representations to maintain computational tractability, yet their effects on lifecycle conclusions are not well understood. This paper assesses the modeling fidelity needed for long-term lifecycle evaluation of BESS designs used in planning studies. A 20-year grid-connected microgrid is sized using a degradation-naive planning model, after which the installed portfolio is fixed and evaluated through sequential lifecycle validation. The reference representation combines nonlinear calendar and cycle aging, C-rate-dependent efficiencies, state-of-health-dependent performance, self-discharge, battery replacement, and full 8,760-h chronology. Battery-model hierarchies, targeted ablations, linear degradation surrogates, health-update intervals, temporal reductions, and combined simplifications are compared using lifecycle cost, replacement timing, state of health, and energy adequacy. The reference case produces replacements in years 9 and 18, a $111.25 million lifecycle net present cost, and 24.01 MWh of cumulative energy not served. Omitting calendar aging eliminates both replacements and understates lifecycle cost by 35.1%, whereas a separately calibrated linear surrogate model reproduces both replacement years and limits the cost deviation to 0.2%, although energy not served remains 31.8% below the reference. A peak-informed calibrated 12-day representation preserves replacement timing but reports zero energy not served, while replacing the preserved peak day with the maximum daily-energy-deficit day substantially overstates energy not served because representative-day closure alters the battery state surrounding the critical event. The results show that modeling fidelity is metric-dependent and should be selected according to the lifecycle outcome to be preserved.

0.10

Fast Analytical Method for Resource Adequacy Assessment in Renewable-Rich Power Systems

eess.SY ·2026-10-13 ·Seyed Amir Hosseini, Mohammad Reza Karimi Gharigh, Antonello Monti, Peter Palensky, Saeed Peyghami
theory similarity 0.61
Abstract

This paper proposes a novel analytical method for resource adequacy assessment in renewable rich power systems. The approach begins by applying the stress strength method to estimate two key resource adequacy indices: loss of load expectation (LOLE) and expected energy not supplied (EENS). This method requires defining the probability distribution functions (PDFs) for both the generation side and the load side. The load is assumed to follow a normal probability distribution, while the generation side probability distribution is derived from the combined PDFs of conventional, wind, and solar power sources. The approach models the cumulative impact of uncertainties on resource adequacy using the central limit theorem (CLT), and improves accuracy with a cumulant based Gram Charlier expansion when the CLT alone is insufficient. The effectiveness of the proposed method is validated through Monte Carlo simulations conducted on the IEEE single area and multi-area RTS-96 test systems. The results demonstrate that the proposed method achieves a substantial reduction in computational time, which is crucial in the context of operational planning, without sacrificing accuracy. Furthermore, its performance improves as renewable penetration increases, making it particularly suitable for future power systems operation and planning.

0.20

AC Assessment of DC Power Flow Screening for Data Center Hosting Capacity and Siting

eess.SY ·2026-11-14 ·Haoxiang Wan, Jesus Silva-Rodriguez, Jonghwan Kwon, Xingpeng Li
hot direction similarity 0.61
Abstract · 5 pages, 5 figures, 1 table. Submitted to the 2027 IEEE PES General Meeting

A screening procedure based on direct current (DC) power flow estimates the data center hosting capacity of a candidate bus, termed the DC-screened capacity, and selects the generator commitment that supports it. This paper assesses that estimate under the alternating current (AC) network model. With the selected commitment fixed, an AC optimal power flow reoptimizes dispatch and voltages to find the largest data center load the bus can carry, termed the AC-assessed capacity. On a synthetic Texas system with 123 buses, the DC-screened capacity exceeds the AC-assessed capacity at 113 buses. Across all 123, the ratio of DC-screened to AC-assessed capacity has a median of 143% (a 43% overestimate) and a maximum of 1,070%. At these 113 buses, the DC-screened capacity violates a branch apparent power limit or a generator reactive power limit in the AC model, two limits the DC model omits. The overestimate changes decisions: a 1-GW project passes DC screening at every bus but exceeds the AC-assessed capacity at 37, and the bus ranked first by DC screening has 205.5 MW less AC-assessed capacity than the bus ranked second. Reporting the AC-assessed capacity beside each DC-screened capacity lets planners reject oversized projects or choose better sites.

0.30