Efficient Quantile-Resolved Hosting Capacity Assessment on Nodal Level for Low-Voltage Grids

Maximilian Köhler, Edwin Mora, Mathias Duckheim, Stefan Niessen

eess.SY ·submitted 2026-09-08 17:16 UTC · v1

Abstract

Hosting capacity - the maximum additional capacity a network can accommodate without violating operational limits - is a key metric in distribution system planning and operation. Decisions on grid reinforcements and the deployment of flexibility management require not only the worst-case HC but also an understanding of the distribution of HC under different likelihoods in load and generation patterns. Quantile-resolved HC distributions provide this view by expressing HC as a function of an acceptable operational limit exceedance likelihood. Monte Carlo sampling is the established approach for computing such distributions but demands large computational resources. Approximations sacrifice either accuracy, the ability to capture uncertainty correlations, or scalability when assessing real-world networks. This paper introduces a computationally efficient method for calculating distributions for quantile-resolved HC. It uses a representation of load samples as multivariate normal distribution, propagated through a linearized power flow model. This allows for leveraging a re-parametrized AC-OPF problem for each hosting capacity quantile. Benchmarking against Monte Carlo-based methods on realistic LV networks demonstrates that the proposed method achieves comparable accuracy with a mean deviation of approx. 3%, while reducing computational time by orders of magnitude. For the exemplary networks the computational time decreases from 11 min to 2 s, and 38 h to 50 s, respectively. The method's scalability is also suitable for recalculation in 15-minute cycles encountered in DSO practice for e.g., real-time grid management.

Comment
Submitted to IEEE PES ISGT Europe 2026. 5 pages, 3 figures. Keywords: Hosting Capacity, Uncertainty, Distribution Grid, Distributed Energy Resources

Closest papers

Nearest neighbours by meaning across the whole index.

Topology-adaptive Estimation of Maximum Voltage Unbalance for Distribution Networks with Finite-sample Guarantee

eess.SY ·2026-10-14 ·Jinbao Wang, Jun Liu, Shiliang Zhang, Xuehui Ma, He Zhang
similarity 0.71
Abstract

High penetration of single-phase distributed power production and frequent topology changes can significantly increase voltage unbalance in distribution networks. Reliable probabilistic power flow (PPF) assessment for the network, therefore, must account for topology-dependent power-flow equations, numerical error in the voltage unbalance factor (VUF), and finite-sample uncertainty in power measurements. In this paper, we propose Topology-Adaptive Certified Quantile Estimation (TACQE) to estimate the maximum VUF across monitored electric buses. Following a local network change, TACQE updates the cross-couplings among power-flow sequences, and certifies candidate PPF solutions against the updated nonlinear equations. The resulted power-flow state enclosures provide rigorous bounds on the maximum VUF. Furthermore, we derive independent reference-solver evaluations to calibrate discrepancies from the reference PPF solution. This leads to a uniform sampling bound that yields simultaneous upper-tail probabilities and quantiles, which provides a finite-sample guarantee for the estimated maximum-VUF distribution over an entire range of VUF thresholds. From our numerical simulations across 101 fixed-topology quantiles, it demonstrates that the designed TACQE can provide a fast candidate post-change power flow solution where it reuses most of the previous network model and modifies only the affected bus blocks.

0.17

Steady-State Equivalent Circuit Model for Data Center Loads

eess.SY ·2026-08-18 ·Muhammad Hamza Ali, Peng Sang, Hyeon Woo, Hyein Kang, Sungyun Choi +1 more
similarity 0.63
Abstract

Planners currently represent data centers as aggregate constant-PQ or ZIP loads in steady-state interconnection and contingency studies. These aggregate models are computationally convenient. However, they obscure the electrical relationship between computational workloads, server utilization, and grid-side demand. They ignore the internal power-electronic conversion stages of IT loads and assume homogeneous workload distributions across the compute clusters. This hides operating-point-dependent converter losses and efficiency variations. We propose a steady-state equivalent-circuit model (ECM) for data centers, which explicitly builds circuit models for IT loads, power supply units, cooling, and auxiliary systems. For power supply units, the equivalent circuit model explicitly represents internal power-electronic conversion stages. For IT loads, we develop a utilization-dependent server power model, and we combine it with loss-aware ECMs of power supply units. This approach captures the grid-side impact of heterogeneous workload distributions while preserving compatibility with conventional power-flow analysis. We evaluate this data center ECM in large-scale transmission power flows, using Monte Carlo simulations under heterogeneous and homogeneous cluster utilization. In comparison with the fixed-efficiency constant-PQ model, the ECM predicts that the most stressed line exceeds its thermal limit in about 30% of Monte Carlo samples. The results further show that homogeneous server utilization overstates line-loading variability by 17%-46% relative to heterogeneous server utilization, depending on the intra-cluster workload correlation.

0.47

Reliability-based Sizing of Energy Storage for Large Load Integration

eess.SY ·2026-11-18 ·Atri Bera, Chandan Chaudhary, Dilip Pandit, Cody J. Newlun, Tu A. Nguyen +2 more
published similarity 0.60
Abstract · 12 pages, 1 figure, published as part of the proceedings of the 2026 Grid of the Future Symposium organized by the CIGRE US National Committ…

The number of large loads connected to the bulk power system has been increasing rapidly worldwide. Emerging high-demand facilities, particularly AI data centers, are introducing new challenges for power system planners. In absence of appropriate planning mechanisms, the addition of high volumes of data center loads will lead to an increase in outages, thus degrading reliability of the system. Energy storage systems (ESS) offer a promising solution to mitigate the reliability impacts of these large loads, due to their flexibility and fast-ramping characteristics. However, ESS should be judiciously sized and sited to maximize the reliability benefits to the grid. This paper presents a framework for the optimal sizing and siting of ESS to minimize the adverse reliability impacts of large load additions. First, a stochastic semi-Markov model is developed to model the load of AI data centers and generate profiles for several such facilities. These profiles are then incorporated into a Markov-chain Monte Carlo simulation-based composite system reliability assessment framework. A detailed nodal network model is used to quantify the reliability impacts of adding data centers and to identify buses most affected by large loads. Resource adequacy metrics are used to evaluate the overall system reliability impacts. ESS are then strategically sized and sited based on this analysis to mitigate the negative impacts of large loads on overall system reliability. The proposed framework is demonstrated using the RTS-GMLC 72-bus test system. The results show how ESS can effectively enhance system reliability in the presence of rapidly growing large-load demand. This framework provides system planners, utilities, and regulators with a practical tool for maintaining reliable power system operation using energy storage as more large loads are integrated into the grid.

0.46

A Deficiency-Based Approach for Unbalanced Three-Phase Distribution System Expansion Planning

eess.SY ·2026-10-12 ·Eli Brock, Miguel Heleno, Javad Lavaei, Somayeh Sojoudi
benchmark similarity 0.60
Abstract · 12 pages, 1 figure, 3 tables. This work has been submitted to the IEEE for possible publication. Copyright may be transferred without notice…

Distribution planners typically characterize grid needs through power flow studies and fit upgrades to those needs by hand. More principled one-shot optimization methods either do not scale or misrepresent unbalanced three-phase networks. This paper proposes an iterative planning process that alternates between two problem classes with mature off-the-shelf solvers. An optimal power flow (OPF) problem quantifies the deficiency of a candidate portfolio by optimizing the dispatch of controllable devices and measuring thermal and voltage violations on a common scale, with an optimal value of zero exactly at adequate portfolios. The OPF multipliers give a first-order approximation of the relief each investment candidate would provide. We bound the error of this approximation and show that structural properties of the deficiency guard it against overestimation. Building on this property, a heuristic cutting-plane search uses a mixed-integer linear program to propose each next portfolio from these approximations. On six unbalanced three-phase feeders from the SMART-DS dataset, the search outperforms a linearized optimization-based benchmark, and the results agree across five variants of the deficiency.

0.21

Probability-Layer Clustering for Bound-and-Budget Calibration in Multi-Bound Robust Bidding of Renewable-Based Virtual Power Plants

eess.SY ·2026-10-30 ·Hadi Nemati, Álvaro Ortega, Enrique Lobato, Luis Rouco
benchmark similarity 0.59
Abstract

RVPPs that aggregate dispatchable and non-dispatchable renewable energy sources, storage, and flexible demand that bid in the day-ahead and secondary reserve markets must cope with uncertainties in market prices, renewable generation, and demand. MBRO is well suited to this setting because it hedges adverse realizations through several deviation layers while keeping the final bidding problem as a tractable, scenario-free MILP. Its performance, however, depends on how the deviation bounds and uncertainty budgets are calibrated. Existing MBRO implementations commonly rely on fixed percentile-based bounds and externally specified budget vectors, usually examined through sensitivity analysis. This paper proposes PL-MBRO, that constructs parameter-specific deviation bounds from historical data conditional on selected risk-attitude quantiles and automatically derives the corresponding uncertainty budgets from empirical cluster probabilities. For each uncertain parameter, k-medians clustering partitions the historical daily profiles into representative probability layers; the cluster median defines the balanced representative, while favorable and adverse within-cluster percentiles define the optimistic and pessimistic representatives. The empirical cluster probabilities are mapped to integer full-horizon uncertainty budgets over the 96 quarter-hourly periods, while the robust inner problem determines the periods in which the corresponding deviation layers are most adverse to the schedule. Compared with a percentilebased MBRO benchmark, in-sample and out-of-sample tests on an RVPP bidding in both markets show that PL-MBRO consistently achieves better realized economic outcomes across the optimistic, balanced, and pessimistic strategies, with improvements of up to 92.7% in-sample and 57.3% out-of-sample, measured relative to the absolute value of the corresponding benchmark realized profit.

0.30

Stochastic Distribution Network Reconfiguration under Load Uncertainty

eess.SY ·2026-10-08 ·Celso Cavellucci, Fábio Luiz Usberti
similarity 0.59
Abstract

This paper investigates distribution network reconfiguration under demand uncertainty using a two-stage stochastic formulation. The network topology is selected in the first stage, whereas the electrical variables are determined separately for each scenario. The deterministic equivalent is formulated as a MISOCP problem that accounts for power balances, losses, voltage constraints, and radiality. Experiments on 12 networks, ranging from 17 to 10,561 nodes, consider three demand scenarios. Reconfiguration reduced expected losses in all instances, with reductions ranging from 3.23% to 65.23% and averaging 31.76%, while also reducing the number of voltage violations in the ex post evaluation by approximately 55%. Eleven of the 12 problems were solved to optimality within the prescribed time limit. However, the additional benefit of stochastic modeling was negligible because of the homothetic structure of the scenarios considered, which preserves the spatial distribution of loads. The results show that spatially heterogeneous scenarios are important for the representation of uncertainty to meaningfully affect reconfiguration decisions.

0.27

Service-Aware Hosting Capacity Assessment of Edge Data Centers with Workload Flexibility

eess.SY ·2026-10-13 ·Linhan Fang, Haoxiang Wan, Anurag Srivastava, Xingpeng Li
similarity 0.59
Abstract

The growing demand for edge computing, content delivery, and AI services is driving the interconnection of edge data centers (DCs) with distribution networks. Before interconnection, utilities evaluate how much DC capacity can be accommodated without violating feeder current and voltage limits. Fixed peak load representations can overlook service dependent demand patterns, cooling related facility demand, and delay tolerant computing tasks. This paper develops a hosting capacity (HC) assessment model for edge DCs with shiftable workload scheduling. Three representative types are considered: mobile edge computing (MEC), content delivery network (CDN), and AI DCs. Facility demand is modeled by combining fixed base demand, service driven demand, prescribed cooling-overhead coefficient, and a shiftable workload component. Workload execution is optimized under arrival causality, maximum delay, daily energy balance constraints, and the resulting active and reactive loads are embedded in a distribution power flow model. Compared with the baseline without load shifting, the maximum bus level HC gain on the IEEE 33-bus system reaches 4.46% for MEC DCs and 9.89% for AI DCs, while CDN case shows negligible gain under the assumed cache management windows.

0.28

Congestion Price Uncertainty From Interconnection Queue by Monte Carlo Sampling

eess.SY ·2026-10-14 ·William A. Wheeler, Samuel Chevalier, Amritanshu Pandey
similarity 0.58
Abstract · 8 pages, 9 figures

The generation interconnection queue adds discrete uncertainty to power grid congestion price estimates on the project planning timescale. The conventional approach to this uncertainty is to make an informed guess of the single or few most likely configurations of generators that interconnect. In this paper, we show that Monte Carlo sampling is a more effective alternative. Given an estimate of the joint probability distribution of generator interconnections, a small number of samples yields good estimates of the congestion distribution. Crucially, this problem is not about rare events, but rather about the expected congestion over the worst times of the year, which makes congestion a common outcome over the distribution of interconnection events. We give empirical results on a 2000-bus network, averaging price outcomes from security-constrained DCOPF over eight different loading scenarios. For each line and contingency of the network, we estimate the full distribution as well as mean price and probability of exceeding a price threshold. Single-point estimates are unreliable and can be misleading about whether a line is likely to be congested. Combining the top k probability configurations yields improved estimates; however, sampling the same number from a distribution gives a more robust result of similar accuracy, as well as error estimates. Including correlation in the distribution model introduces small changes, showing that standard Bernoulli distributions suffice in most cases. The sampling approach is also applicable to large-load interconnection and should be of interest for planning both generation and large-load projects.

0.31