CS Paper Radar

Reducing Data-Center Load Transfers with Ride-Through-Aware Voltage Control

Siyu Lu, Yang Weng

eess.SY ·submitted 2026-11-05 22:59 UTC · v1

Abstract

Fault-induced transfers of large data centers to backup supply can cause abrupt reductions in grid-served demand. Coordinating reactive-power support to mitigate these transfers requires consideration of facility-specific voltage--duration ride-through characteristics, particularly when support capacity is limited. This paper develops a ride-through-aware extension of quadratic voltage control that assesses voltage deviations relative to the admissible margins specified by these characteristics. We establish four design requirements that jointly express envelope-based severity, duration dependence, and preventive voltage-restoration incentives. Within a multiplicatively gated quadratic class, we derive necessary and sufficient conditions for satisfying these requirements and construct an explicit family of envelope-normalized objectives. We apply the proposed objectives to reactive-power coordination and evaluate their performance on the IEEE 14-bus, New England 39-bus, and NPCC 140-bus systems. Comparisons with Volt/VAR control, conventional nominal-voltage tracking, and recent data-center voltage-control methods demonstrate improved data-center retention under matched reactive-power support constraints. In the IEEE 14-bus study, the proposed controller reduces the mean data-center disconnection rate by 44.8\% and grid-demand loss by 27.4\% compared with the best-performing baseline. These results highlight the benefit of incorporating data-center ride-through requirements into reactive-power allocation.

Comment
10 pages, 5 figures

Closest papers

Nearest neighbours by meaning across the whole index.

Hosting Capacity Assessment of Data Centers with Voltage Ride-Through Capability in Power Systems

eess.SY ·2026-09-02 ·Pengyu Ren, Wei Sun, Fei Teng
similarity 0.73
Abstract

Large data centers are emerging as concentrated, power-electronic grid loads whose abrupt disconnection or transfer to on-site backup supply during voltage disturbances can remove large demand from the power system, and may create a system-level stability problem. Their interconnection feasibility therefore depends not only on steady-state thermal and voltage limits, but also on whether internal power-conditioning systems can maintain IT service while limiting customer-initiated load reduction. This paper presents a voltage ride-through (VRT)-aware data center and grid co-planning framework that couples transmission-level fault simulation with an internal data center ride-through model. Python-based dynamic simulations generate point-of-interconnection (POI) voltage trajectories under selected network faults, and the resulting waveforms drive an internal model incorporating IT and cooling-load dynamics, DC-link, Uninterruptible Power Supply (UPS) response, and converter apparent power limits. The IEEE 118-bus case study shows that internal VRT capability can become a binding interconnection constraint: steady-state planning alone can overestimate feasible data center capacity, whereas increased UPS converter headroom progressively restores hosting capacity. Under the reduced-order response models studied, the grid-forming mode provides greater ride-through margin than the current-limited grid-following mode under the same network fault conditions. The results further show that VRT constraints can materially change both the total hosting capacity of data centers and its spatial allocation across candidate interconnection buses.

0.16

Low-Voltage Ride-Through in AI Data Centers via Coordinated Battery and Computing Load Control

eess.SY ·2026-11-14 ·Xiaoyang Wang, Xin Chen, Fang Chen Lin, Prasad Enjeti, Ali Yazdanpanah +2 more
hot direction similarity 0.69
Abstract · 5 pages, 7 figures

The ability of large AI data centers to ride through grid voltage sags is critical to power system stability and reliability. This paper frames data center low-voltage ride-through (LVRT) as a DC-link power balance problem. Once the rectifier reaches its current limit, the power drawn from the grid decreases in proportion to the grid voltage. The DC-link capacitor can supply the resulting power deficit only briefly before the DC-link voltage falls low enough to trigger undervoltage protection tripping. To address this issue, this paper proposes effective control strategies for coordinating uninterruptible power supply (UPS) battery and computing load curtailment to offset the power deficit and enable LVRT at minimum control cost. Three control scenarios are studied: UPS battery support alone, computing load curtailment alone, and the coordinated use of both resources. Electromagnetic transient (EMT) simulations using the TAMU-ERCOT AI data center model demonstrate that battery support and the coordinated strategy achieve LVRT for all tested sags, including a near-zero-voltage fault, while load curtailment alone rides through moderate voltage sags.

0.22

Fixed-Time Voltage Regulation in Distribution Networks with Impedance Awareness

eess.SY ·2026-10-01 ·Nilanjan Roy Chowdhury, Venkatesh Sarangan
similarity 0.67
Abstract · 8 pages, 6 figures

This letter introduces an optimization-based fixed time control algorithm for solving the voltage regulation problem of a radial and balanced power distribution network. The proposed algorithm requires no prior knowledge of the exact network impedance (resistance and reactance), yet guarantees voltage convergence to the predefined safe limit within a fixed time-window. We embrace results from Fixed-time stability (FxTs) and Control Lyapunov function (CLF) to analyze the stability and robustness of the underlying algorithm and then synthesize it leveraging the Quadratic Programming (QP) approach. We first analytically provide sufficient conditions on the control gains and the design parameters, that can ensure voltage regulation in fixed-time. Thereafter we transform the existing voltage regulation problem into an equivalent QP-based optimization framework and translate the aforesaid conditions to find feasible solutions for voltage stability. We empirically verify the efficacy of our proposed algorithm on the IEEE-33 bus distribution network and compare its performance against other existing robust control methods.

0.29

Can STATCOM and UPS-Based Voltage Support Mitigate Fault-Induced Reductions in AI Data Center Grid Power Draw?

eess.SY ·2026-11-12 ·Ziang Liu, Yimeng Liu, Francis Yunhe Hou
hot direction similarity 0.66
Abstract · 10 pages, 5 figures

Artificial intelligence data centers (AIDCs) are rapidly increasing in number and capacity. These large electronic loads are interfaced through power electronic devices and can sharply reduce grid power intake during fault-induced voltage sags. Disturbances exceeding equipment ride-through capabilities may also trigger protective disconnection, posing risks to power system security. Static synchronous compensators (STATCOMs) and appropriately controlled AIDC uninterruptible power supply (UPS) rectifiers can provide reactive power support during voltage sags. This paper compares the individual and combined effectiveness of STATCOM and UPS-based voltage support in mitigating fault-induced reductions in grid power intake through electromagnetic transient simulations of a 1 GW AIDC connected to an IEEE nine-bus system. Simulation results show that STATCOM support better preserves short-term intake in milder tested faults, whereas UPS coordination maintains rectifier operation under deeper sags by reducing active intake to reserve reactive current capacity. Combined support improves auxiliary load retention and recovery in selected cases. However, severe tested sags still cause substantial grid-demand reductions even with combined support.

0.29

Unlocking AI Data Center Interconnection Capacity Through Coordinated Grid and Data Center Flexibility

eess.SY ·2026-10-04 ·Rida Fatima, Xingpeng Li
similarity 0.65
Abstract

The rapid growth of AI data centers is creating concentrated electricity demands that can exceed available distribution network headroom and delay interconnection. This paper investigates whether capacity can be used effectively by coordinating flexibility on both sides of the interconnection. A day-ahead mixed integer second order cone programming framework maximizes feasible AI data center IT capacity using utility side conservation voltage reduction and network topology reconfiguration, together with data center workload shifting and reserve constrained uninterruptible power supply storage. Background feeder demand uses voltage dependent ZIP models, while the data center is modeled as constant power demand using Training, Inference, and Mixed workload profiles. A two-stage solution first maximizes interconnection capacity and then minimizes feeder losses for the retained capacity, with numerical relaxation screening. Studies on a 116-bus model derived from the IEEE 123-node feeder show that, at the constrained bus-60 connection point, grid side flexibility, driven almost entirely by network reconfiguration, increases feasible IT capacity by approximately 42.5-45.0%, while data center flexibility alone provides approximately 2.1-5.4% gains. Coordinated operation increases feasible IT capacity from approximately 10.5-10.6 MW under BASE operation to 15.3-16.0 MW, corresponding to gains of approximately 45.9-50.8%; the 16.0 MW Inference result is limited by the adopted UPS reserve requirement. Benefits are strongly location dependent and influenced by workload flexibility, deferral duration, PUE, UPS energy and reserve requirements, and feeder loading. Under a combined adverse operating condition, FULL capacity decreases by only 3.4% relative to the nominal Mixed case while retaining substantial additional capacity over BASE.

0.28

EMT Modeling and Coordinated Mode-Transition Ride-Through Control of Modern Data Centers

eess.SY ·2026-11-05 ·Junyuan Zheng, Salish Maharjan, Min Lwin, Soummya Roy, Zhaoyu Wang +3 more
similarity 0.64
Abstract

Large data centers are emerging as power-electronic loads whose response to grid voltage disturbances can affect bulk-system stability. This paper presents the composition and control characteristics of a proprietary electromagnetic transient (EMT) model of a modern data center comprising an uninterruptible power supply (UPS) with battery energy storage, induction-motor cooling loads, a computer room air handler (CRAH) driven by a variable-frequency drive (VFD), and an aggregated server load. A voltage-based state machine coordinates three aspects of the facility response: the UPS operating mode (eco, double conversion, or battery), the supply path of the CRAH, and a ramped reconnection of the grid-side UPS converter after the disturbance clears. A 100 MW facility is implemented in PSCAD/EMTDC and benchmarked against the PSSE PERC1 aggregate data center model under a symmetrical three-phase fault and low- and high-voltage ride-through (LVRT/HVRT) events. The two models agree closely in their voltage and active-power trajectories, while the EMT model also resolves the converter and motor-reacceleration transients that the phasor-domain model cannot.

0.50

Coordinated Conservation Voltage Reduction and Network Topology Reconfiguration in Active Distribution Networks

eess.SY ·2026-10-12 ·Rida Fatima, Hassan Zahid Butt, Xingpeng Li
similarity 0.63
Abstract

Distribution networks rely on conservation voltage reduction (CVR) and network topology reconfiguration (NTR) to manage demand, distributed energy resources (DERs), and tighter operating margins. Yet these strategies are typically deployed independently, despite coupled effects on feeder voltages, losses, and loading. This paper addresses that gap by developing a day-ahead mixed-integer second order cone programming (MISOCP) framework that jointly optimizes feeder head voltage control and network reconfiguration. The formulation incorporates AC branch flow constraints, ZIP load models, DERs, battery energy storage systems, and multi substation radiality. Using modified IEEE 33 bus and 123 bus systems, four configurations isolate the individual and coordinated effects of CVR and NTR. On the 33-bus system under mixed ZIP loading, NTR reduces active energy loss by 2.50%, while coordinated operation reduces it by 2.91% relative to SDN and produces a 2.46% CVR induced active load reduction relative to SDNTR. Under constant impedance loading, coordinated operation reduces active energy loss by 17.65% relative to SDN, while CVR reduces active load by 14.61% relative to SDNTR. DER portfolio scaling shows a nonmonotonic coordinated load reduction response, strongest at 20% penetration and decreasing at higher levels. On the 123 bus system, NTR reduces losses by 19.3%, while CVR reduces voltage dependent load energy by 2.3 to 2.4%. Under loading stress, SDN becomes infeasible at 120% loading, whereas CEDNTR remains feasible. Overall, the results demonstrate complementary, operating condition dependent benefits shaped by load composition, DER portfolio scaling, feeder topology, voltage margins, and source constraints, highlighting the value of joint optimization.

0.29

Steady-State Equivalent Circuit Model for Data Center Loads

eess.SY ·2026-08-18 ·Muhammad Hamza Ali, Peng Sang, Hyeon Woo, Hyein Kang, Sungyun Choi +1 more
similarity 0.63
Abstract

Planners currently represent data centers as aggregate constant-PQ or ZIP loads in steady-state interconnection and contingency studies. These aggregate models are computationally convenient. However, they obscure the electrical relationship between computational workloads, server utilization, and grid-side demand. They ignore the internal power-electronic conversion stages of IT loads and assume homogeneous workload distributions across the compute clusters. This hides operating-point-dependent converter losses and efficiency variations. We propose a steady-state equivalent-circuit model (ECM) for data centers, which explicitly builds circuit models for IT loads, power supply units, cooling, and auxiliary systems. For power supply units, the equivalent circuit model explicitly represents internal power-electronic conversion stages. For IT loads, we develop a utilization-dependent server power model, and we combine it with loss-aware ECMs of power supply units. This approach captures the grid-side impact of heterogeneous workload distributions while preserving compatibility with conventional power-flow analysis. We evaluate this data center ECM in large-scale transmission power flows, using Monte Carlo simulations under heterogeneous and homogeneous cluster utilization. In comparison with the fixed-efficiency constant-PQ model, the ECM predicts that the most stressed line exceeds its thermal limit in about 30% of Monte Carlo samples. The results further show that homogeneous server utilization overstates line-loading variability by 17%-46% relative to heterogeneous server utilization, depending on the intra-cluster workload correlation.

0.47