CS Paper Radar

The consequences of high SMR operating costs in electricity markets

Pradyumna Rao, Daniel T. Kaffine, Bri-Mathias Hodge

eess.SY econ.GN ·submitted 2026-09-08 15:54 UTC · v1

Abstract

As US power markets contend with growing demand for firm generation, the nuclear industry has offered Small Modular Reactors (SMRs). However, how these concepts would fare in a rapidly evolving power grid is unclear, given the paucity of operational examples. Current literature, informed by substantial cost escalations for traditional nuclear plants, focuses on the investment costs SMRs need to achieve for private investment feasibility. However, this work finds that the operating and marginal costs of SMRs are more critical to economic feasibility in market environments. This work dispatches SMRs using a flexible operations model, considering revenue from two main electric markets, capacity and wholesale energy markets, with and without policy support. Manufacturer advertised costs for investment and operating costs are used, with fuel costs calculated from manufacturer provided design parameters. Results indicate that SMRs are uneconomical primarily because investment cost reductions are offset by increased marginal costs. As such, an environment of prices and subsidies beyond historic norms are necessary to attract private investment at manufacturer advertised cost benchmarks. Current SMRs are as profitable as advanced estimates of the AP1000 traditional nuclear reactor, and if investment costs escalate at the average rate for nuclear projects, they are similar to Vogtle 3 & 4. In projected future power markets, reductions in marginal cost may be more beneficial than those in investment costs.

Closest papers

Nearest neighbours by meaning across the whole index.

Techno-Economic Boundary Analysis of Small Modular Reactor Cogeneration for Hyperscale Data Center IT and Cooling Loads

eess.SY ·2026-08-11 ·Honglin Li, Buxin She, Jie Zhang
similarity 0.66
Abstract

Hyperscale data centers are adding firm, high-utilization demand faster than grids can serve it, renewing interest in colocating them with small modular reactors. Such a plant could earn revenue in two ways, selling low-carbon power and diverting steam to absorption chillers that serve a cooling load accounting for 20-40% of facility electricity use, but neither revenue stream has been priced across the conditions that must coincide. Here we co-optimize reactor dispatch, steam extraction, absorption cooling and grid exchange hourly for a 200 MW$_\mathrm{e}$ data center in the Electric Reliability Council of Texas (ERCOT) region, across 109 runs spanning capital, market, policy, financing and cooling efficiency. At 2023 mid-range reactor capital, the nuclear configurations cost 49-62% more than grid supply even with the Section 45Y production tax credit. The viable region opens near \$5,000 kW$_\mathrm{e}^{-1}$, and nth-of-a-kind capital makes them 77-89% cheaper in 2023, though between parity and 34% more expensive in the low-price 2024 market. A carbon price of \$53-64 tCO$_2^{-1}$ closes the mid-range gap under hourly export crediting. Absorption cooling is dispatched in response to hourly electricity prices and supplies 38% of annual cooling, at an added cost of \$9.2 million yr$^{-1}$ relative to the reactor-only plant; that gap closes at an installed absorption cost of \$60 kW$_\mathrm{c}^{-1}$ at baseline efficiency and \$570 kW$_\mathrm{c}^{-1}$ on a legacy-efficiency campus, against surveyed commercial prices of \$450-1,200 kW$_\mathrm{c}^{-1}$. Together these results delineate the capital, market and policy conditions under which colocated reactor cogeneration is competitive with grid procurement, and the range over which each condition moves the outcome.

0.04

Robust Procurement Planning for Community Choice Aggregators: Managing Market Price Uncertainty

eess.SY ·2026-10-20 ·Manar Jaradat, James Himelic, Neha Patankar
code/data similarity 0.58
Abstract

Community Choice Aggregators (CCAs) play an important role in the energy transition by procuring renewable electricity for local communities while balancing affordability, resource adequacy, and clean-energy requirements. In California, these long-term procurement decisions are coordinated through integrated resource planning (IRP). However, conventional IRP frameworks typically represent wholesale electricity prices deterministically, even though price uncertainty can expose CCAs to substantial financial risk by affecting the cost of market imports and, particularly, the value of export opportunities. This paper develops a robust optimization framework for CCA resource procurement that hedges against uncertainty in wholesale import and export prices. We extend the open-source GenX capacity expansion model with a budgeted robust optimization formulation that protects procurement decisions against adverse price realizations while remaining computationally tractable for large-scale, multistage planning studies. Using data from a California CCA, we show that market price uncertainty can materially change optimal procurement strategies. Rather than aggressively expanding renewable capacity based on expected export revenues, robust portfolios reduce dependence on uncertain market revenues, leading to more conservative renewable investments and less reliance on market exports. We demonstrate that moderate uncertainty budgets provide most of the risk-reduction benefits of robust planning at limited additional cost, whereas higher robustness levels yield diminishing benefits as portfolio conservatism increases. These findings provide guidance for selecting uncertainty budgets in IRP studies and demonstrate how robust optimization can support affordable and resilient procurement decisions as CCAs contribute to the transition toward low-carbon electricity systems.

0.40

FissionReady: Joint Workload and Power Scheduling for Data Centers Powered by Small Modular Reactors

cs.DC ·2026-09-30 ·Raghavendra Kanakagiri, Rohan Basu Roy, Yankai Jiang, Pranathi Wuppuluru, Devesh Tiwari
similarity 0.57
Abstract · 10 pages, 3 figures, 2 tables

Data centers are increasingly exploring small modular nuclear reactors (SMRs) as a carbon-free power source, but variable datacenter demand and negative grid prices require the SMR plant to load-follow rather than run at constant output. Load following is uniquely challenging and complex for SMR plants due to underlying nuclear physics. We propose FissionReady, a datacenter scheduler that tracks each module's fuel age, xenon state, and remaining flexibility to determine per-module operating envelopes, then coordinates load-following, batch deferral, and grid purchasing through a two-timescale optimization. FissionReady achieves zero involuntary shutdowns and zero batch deadline misses while reducing water consumption by roughly one-third and grid cost by roughly half compared to a same-sized base configuration.

0.19

Shift or curtail? How much data-center flexibility is worth depends on the host power grid

eess.SY physics.soc-ph ·2026-08-20 ·Saroj Khanal, Geon Roh, Boyu Yao, Abraham Silverman, Dennice Gayme +3 more
similarity 0.57
Abstract · Submitted to Nature Energy

Data-center growth risks overbuilding power grid infrastructure and stranding capital. Flexible data-center operation can defer infrastructure investments, but its value depends on the flexibility mechanism and the host power grid characteristics. We classify data-center load as firm, flexible or interruptible, and embed them in capacity expansion applied to market-organized, fossil-heavy PJM and carbon-capped, centrally coordinated Korea. In PJM, the flexibility value is spatial: shifting workloads between zones reduces system cost by 6% in 2028 and 19% in 2038, avoiding 4.4 GW and 8.9 GW of gas and nuclear generation. In Korea, it is temporal: shifting load into midday solar hours makes 0.5 GW of additional solar worth building in 2028 and avoids 1.2 GW of gas and 0.3 GW of batteries in 2038. In both, realistic event-shape limits diminish the value of curtailment. The results show that flexibility procurement and its value are driven by grid characteristics and policy objectives.

0.45

A Primal-Dual Formulation for Pricing Static Voltage Stability Services within a Unit Commitment Model

eess.SY ·2026-09-10 ·Peng Wang, Luis Badesa
similarity 0.54
Abstract

In modern power systems with high penetration of Inverter-Based Resources (IBR), most converters operate in Grid-Following (GFL) mode. Some buses exhibit inherently low Short-Circuit Ratios (SCRs), a property majorly shaped by network topology. The integration of GFL-IBR onto such weak buses thus demands attention to static voltage stability. To address this issue, market mechanisms have been proposed to incentivize generators to provide voltage stability services, such as commitment of synchronous generators for reducing the equivalent impedance at low SCR buses and adaptive reactive power support from GFL-IBR. To compute shadow prices for these services, previously proposed methods such as the `restricted' and `dispatchable' approaches may fail to guarantee operating cost recovery for voltage-stability service providers. As the resulting prices are determined purely from a social surplus maximization objective, the profitability of units is entirely overlooked. This suggests that new pricing methodologies are needed to satisfy cost-recovery requirements. Therefore, this paper proposes a pricing method based on a primal-dual formulation. Case studies demonstrate that the proposed method can consistently produce revenue-adequate shadow prices, enabling all participating units to recover their costs without supplementary uplift payments.

0.17

Market Efficiency and Capacity Investment under Flexible Price-Making Loads: A Computational Study

eess.SY ·2026-10-30 ·Aron Brenner, Deepjyoti Deka, Saurabh Amin
similarity 0.53
Abstract

Large flexible loads such as data centers can shift consumption across locations and hours to lower their bills. We model a price-making consumer leading the system operator in a Stackelberg game and compare its shifts with a cost-minimizing planner's over a simulated RTS-GMLC year. Strategic temporal and spatial shifting capture 75% and 93% of the planner's savings, forgoing the rest mostly by withholding flexibility to protect favorable prices. Scarce capacity and abundant renewables raise this share for temporal shifting; scarce transmission lowers it for spatial shifting. Temporal and spatial flexibility substitute for thermal and transmission capacity, respectively, and complement renewables.

0.24

Data-center growth impacts household electricity costs more through wholesale prices than through grid reinforcement

eess.SY econ.GN ·2026-11-11 ·Lingdong Zhou, Wenjia Xia, Jiyu Wang, Fei Ding, Xiangqi Zhu
hot direction similarity 0.53
Abstract · 22 pages, 8 figures, 1 table. Lingdong Zhou and Wenjia Xia contributed equally to this work

Rapid data-center expansion is raising concerns about electricity affordability, yet how the costs of serving these large new loads reach residential customers remains poorly understood. Here, we quantify the potential impact of 371 announced Texas data-center projects, totaling 38.9 GW by 2030, on residential electricity costs by linking power system expansion, wholesale electricity markets, transmission reinforcement, and retail cost allocation. We find that accommodating this demand increases modeled residential electricity costs in one representative case by 1.64 cents/kWh, with 68% arising from higher wholesale electricity prices and 32% from regulated transmission charges. Allowing new gas generation near data centers reduces the 2023 residential cost increase to 0.92 cents/kWh, whereas excluding data centers from the transmission cost-sharing base raises it to 1.87 cents/kWh. These findings reveal that the residential cost burden of data-center growth is driven primarily by wholesale electricity price increases, rather than direct transmission investment costs, and depends critically on generation siting, infrastructure planning, and cost allocation.

0.29

Optimizing Multi-Market Participation of Battery and Electrolyser Systems Based on Field Performance

cs.LG ·2026-08-17 ·Chunyang Zhao, Stoyan Trenchev, Shi You, Chresten Træholt
published similarity 0.52
Abstract · 6 pages, 8 figures. Accepted at the 2026 IEEE Power and Energy Society General Meeting (PESGM)

The increasing share of renewable energy in power systems creates a need for fast-response and flexible resources to maintain system stability. With the expansion of electricity markets and ancillary service products, opportunities arise to stack revenues across multiple services. Long-term Power-to-X (PTX) electrolysers and short-term battery energy storage systems (BESS) are prevalent flexible resources, yet most studies neglect real hardware behavior, such as ramp limits, efficiency, and setpoint-tracking accuracy. This work presents experimental and modeling results for a 55 kW/79 kWh BESS and an electrolyser comprising three 2.4 kW units. Key characteristics are identified through measurements and embedded into a price-driven optimization framework for participation in the Danish electricity and ancillary service markets, utilizing real market data from 2022 to 2025. The optimized daily profits for multi-market participation are 1,749.27 DKK and 289.46 DKK for the BESS and electrolyser, respectively. With the demonstrated business cases for BESS and PTX systems, this work highlights the importance of incorporating experimental performance when evaluating participation across multiple markets and years.

0.38