Abstract

This paper establishes the relationship between loss-of-load expectation (LOLE) and loss-of-load frequency (LOLF). We show why LOLE generally does not measure distinct-event frequency, mean event duration, or shortage magnitude. We identify conditions under which peak-based LOLE admits a frequency interpretation as the expected count of deficient daily peaks per horizon and distinguish this quantity from LOLF. We also derive an analytical formulation for frequency-and-duration indices that combines a convolution-derived generation probability-and-frequency model with chronological load changes. Under stationary generation, it uses the prescribed load profile directly, without constructing a separate load model or discretizing load magnitudes. Studies using generation and load data from the 24-bus IEEE RTS reveal different event frequencies and mean event durations at identical peak-based LOLE, motivating their separate assessment. Numerical comparisons demonstrate the accuracy advantage of the proposed analytical calculation over the conventional analytical implementations, quantifying the LOLF errors incurred by load discretization.

Comment
5 pages, 3 figures, 1 table, submitted to IEEE PESGM

Closest papers

Nearest neighbours by meaning across the whole index.

Relationship between Loss of Load Expectation and Frequency of Load Loss Events

eess.SY ·2026-09-18 ·Chanan Singh
unusual similarity 0.81
Abstract

Loss of Load Expectation (LOLE), originally calculated as the expected number of days of load loss, has also been used as a frequency metric. This paper shows that LOLE can indeed be calculated as a frequency metric, but only with restricted conditions, and that it differs fundamentally from the standard frequency metric employed in the frequency and duration (F&D) approach. A lack of understanding of these conditions can lead to incorrect applications and interpretations.

0.24

Cascading Contingency Analysis of Modern Power Systems Using a Stochastic Hybrid Systems Framework

eess.SY eess.SP ·2026-11-10 ·Masoud H. Nazari, Hamid Varmazyari
published similarity 0.59
Abstract · This paper was accepted at the 2026 North American Power Symposium (NAPS)

This paper presents a cascading contingency analysis and risk assessment framework that incorporates probabilistic mode transitions motivated by stochastic hybrid system (SHS) concepts together with power-flow-based stress evaluation. A two-stage modeling approach is adopted in which sensitivity-based analysis is first used to identify candidate cascading transitions, followed by DC power flow re-evaluation to accurately capture post-contingency stress redistribution, islanding behavior, and load shedding. A probabilistic propagation model is constructed using mode-dependent transition probabilities derived from line loading conditions. A Cascading Risk Index (CRI) is introduced to quantify the expected load shedding accumulated over cascade progression. Case studies on the IEEE 39-bus system demonstrate that the proposed framework captures diverse cascading routes under multiple initiating outages and identifies critical propagation patterns that are not revealed by N-1/N-2 screening. The results highlight the importance of SHS modeling in assessing cascading risk and providing a scalable framework for resilience evaluation in modern power systems.

0.34

Long-Term Operational Planning Using Scenario-Based System Load Forecasting

cs.CR ·2026-09-28 ·Akash Debnath, Shiuli Subhra Ghosh, Jaime De La Ree, Alex Freeman, Kavin D Jones
similarity 0.58
Abstract

The rapid expansion of hyperscale data centers is significantly increasing electricity demand in Northern Virginia. Dominion Energy, the region's primary electric utility, must reinforce its transmission network to support this growth. These projects require planned outages that must be evaluated months in advance to support construction planning and outage coordination while meeting NERC and PJM N-1 reliability requirements. Long-term outage studies are commonly performed day by day using monthly or seasonal peak-load assumptions. Although this approach simplifies analysis, it can be overly conservative because it does not capture granular load variability. Consequently, short-duration outages that may be feasible under realistic loading conditions are often postponed or denied, delaying critical transmission expansion and grid modernization projects. This paper evaluates the operational value of incorporating realistic multigranular load forecasts into long-term, contingency-based outage assessments and compares the results with conventional peak-based methods. Daily, weekly, and monthly forecasts are developed using statistical and machine-learning models, including SARIMA, Prophet, Gradient Boosting, and Random Forest, followed by bottom-up temporal reconciliation to maintain consistency across forecast horizons. Results show that granular load forecasts reduce unnecessary conservatism and improve outage accommodation, particularly for short-duration requests, without changing existing reliability criteria. The proposed approach can strengthen long-term outage coordination and support timely transmission reinforcement and grid modernization.

0.20

Grid-Aware Assessment of Forced Oscillations from Spatially Distributed Large Loads

eess.SY ·2026-11-17 ·Min-Seung Ko, Hao Zhu
similarity 0.58
Abstract

This paper develops a unified analytical framework for assessing forced oscillations induced by spatially distributed large-load fluctuations to determine their grid-aware fluctuation magnitudes. Emerging computational loads, such as hyperscale datacenters, present cyclic power variations with dynamic impacts depending on the waveform characteristics, forcing frequency, and source location. Our grid-aware framework represents these fluctuations using deterministic harmonic and probabilistic spectral models, and analyzes the resulting bus-wise frequency deviations based on a generic grid frequency-response model. Deterministic, risk-aware, and band-based probabilistic severity measures are further developed to obtain admissible fluctuation limits under different assumptions on frequency and phase uncertainty. We also formulate a security-constrained (SC) optimization of locational fluctuation magnitudes among existing large loads, accounting for their aggregated frequency deviation level. Case studies on the IEEE 39-bus and 14-generator Australian systems validate the proposed severity measures and admissible limit analysis. The SC optimization results further show that distributing a given amount of aggregate fluctuation toward dynamically less sensitive locations can substantially reduce system-wide oscillation severity.

0.35

New and Improved Analytical Methods for Calculating Power System Adequacy Metrics

eess.SY ·2026-10-04 ·Chanan Singh
similarity 0.57
Abstract

A new analytical technique is proposed for calculating adequacy metrics for generation planning. The proposed technique is simple, direct, and provides higher accuracy than traditional discretized approaches. Additionally, a new analytical methodology is introduced for calculating loss of load days (LOL Days) as distinct from loss of load events or frequency of load loss. This paper emphasizes that, where feasible, analytical methods are preferable to Monte Carlo simulations because they yield exact closed-form solutions rather than statistical estimates.

0.25

Reliability Value of Long-Duration Energy Storage against Extreme Events in High-Renewable Grids: A Full-Year AC-OPF Assessment

eess.SY ·2026-09-06 ·Jeongdong Kim, Jonggeol Na, Sungho Shin
similarity 0.57
Abstract · 39 pages, 12 figures

Long-duration energy storage (LDES) can mitigate prolonged renewable--load imbalances during Dunkelflaute events, but existing studies rely on zonal or linearized DC network models and inadequately analyze the operational feasibility of the grid across a wide range of full-year renewable, load, and contingency scenarios. To address this gap, this paper introduces a multi-period alternating-current optimal power flow (AC-OPF) formulation that captures the full nonlinear network physics and assesses the reliability value of LDES in high-renewable grids. To evaluate scarcity events spanning multiple days to weeks, full-year operation is modeled as an 8,760-h load-shedding minimization over scenarios sampled from a Gaussian copula model, fitted to 2010--2025 historical wind and bus-level load data, that represents both typical variability and tail events. On a synthetic 200-bus Illinois transmission network, a hybrid fleet of battery energy storage (BESS) and LDES with 50 MW total power reduces annual load shedding by 83.0% on average relative to the base network, versus 68.5% for short-duration BESS alone at equal power. To further account for unexpected line outages throughout the year, the formulation is extended to a multi-day security-constrained AC-OPF. Under N-1contingencies, no feasible operating solution is obtained for the base network, whereas the LDES-equipped network remains feasible in all considered cases, thereby saving the cost of additional generation and transmission capacity. During the contingency period, LDES acts as a backup power supply, requiring only 5.5% more generation on average than the no-contingency base case.

0.21

Fast Reassessment of Prolonged Electricity Shortages under Shared Fuel Interruptions

eess.SY ·2026-10-19 ·Dogan Urgun
code/data similarity 0.57
Abstract · 11 pages, 4 figures, 5 tables. Submitted to IEEE Transactions on Reliability. Code and data: https://github.com/DoganUrgun/Fast_Reassessment…

When several generators share a fuel supply, one interruption can disable them together and cause electricity shortages lasting days. Such interruptions can be made less frequent, for example by weatherizing gas supply, or shorter, for example by on-site backup fuel. Yet traditional resource adequacy indices, expected unserved energy and loss-of-load hours, fail to distinguish such measures whenever they remove the same expected time without fuel, because for interruptions independent of system conditions these indices depend on the interruptions only through this time. Their difference is revealed by prolonged-shortage exposure, the expected annual hours in shortages of at least a given duration, whose exact chronological calculation must be repeated for every interruption scenario. To reduce this cost, a fast reassessment method with guaranteed accuracy is proposed. Network calculations are performed once and condensed into a restoration response, the additional prolonged-shortage hours caused by one interruption of each duration, from which any scenario is evaluated as a weighted sum without new simulation. An hour-by-hour error bound determines whether this evaluation is accurate enough, and exact dynamic programming is applied otherwise, so that every result lies within a requested tolerance of the exact value on the same Monte Carlo samples. On the Reliability Test System of the Grid Modernization Laboratory Consortium, most evaluations were accepted, fully accepted scenarios typically ran more than 200 times faster than exact calculation, and total computation time decreased in every workload. Measures against fuel interruptions can thus be screened quickly and accurately by their effect on prolonged shortages.

0.37

Reliability-based Sizing of Energy Storage for Large Load Integration

eess.SY ·2026-11-18 ·Atri Bera, Chandan Chaudhary, Dilip Pandit, Cody J. Newlun, Tu A. Nguyen +2 more
published similarity 0.56
Abstract · 12 pages, 1 figure, published as part of the proceedings of the 2026 Grid of the Future Symposium organized by the CIGRE US National Committ…

The number of large loads connected to the bulk power system has been increasing rapidly worldwide. Emerging high-demand facilities, particularly AI data centers, are introducing new challenges for power system planners. In absence of appropriate planning mechanisms, the addition of high volumes of data center loads will lead to an increase in outages, thus degrading reliability of the system. Energy storage systems (ESS) offer a promising solution to mitigate the reliability impacts of these large loads, due to their flexibility and fast-ramping characteristics. However, ESS should be judiciously sized and sited to maximize the reliability benefits to the grid. This paper presents a framework for the optimal sizing and siting of ESS to minimize the adverse reliability impacts of large load additions. First, a stochastic semi-Markov model is developed to model the load of AI data centers and generate profiles for several such facilities. These profiles are then incorporated into a Markov-chain Monte Carlo simulation-based composite system reliability assessment framework. A detailed nodal network model is used to quantify the reliability impacts of adding data centers and to identify buses most affected by large loads. Resource adequacy metrics are used to evaluate the overall system reliability impacts. ESS are then strategically sized and sited based on this analysis to mitigate the negative impacts of large loads on overall system reliability. The proposed framework is demonstrated using the RTS-GMLC 72-bus test system. The results show how ESS can effectively enhance system reliability in the presence of rapidly growing large-load demand. This framework provides system planners, utilities, and regulators with a practical tool for maintaining reliable power system operation using energy storage as more large loads are integrated into the grid.